Document aBKKKqgEjowO1MpJwBnenoMJa

Anniston Plant c. TECHNICAL SERVICES DEPARTMENT MONTHLY REPORT Anniston Summary C. K. Eastman C. A. Rose J. C. Landwehr L. J. Boesch G. W. Miller W. B. Papageorge W. F. Taffee H. L. Williams v July, 1969 Cost Improvement Results Month $112,237<1) $66,275 1697. General Offices H. S. Bergen H. C. Carder I R. Robirds ` . Danna (5) P. B. Hodgesi D. B. Hosmer (2) W. A. Kuhn C. F. Luecke N. L. Sample J. E. Smith 1 R, J. Stratmeyer H. S. Trail * OTHER LOCATIONS D. W. Jackson WGK T. M. Patrick So. 2nd St. A. H. Forsten AIvin,Texas YTD $300,376 $306,000 98.2%, (1) Biphenyl productivity and Chlorine Plant shutdown contribution include YTD adjustments as follows: Due to increase in Santowax R demand the Tubular Unit has been run as a polyphenyl production unit rather than a biphenyl pro ducer. The increase in savings represents this change for January thru July 1969. Basis for the manpower reduction from shut down of the Chlorine Plant included the operating personnel only. Due to the shut down, plant manpower requirements have been reduced 27 men instead of 14. Adjustment made for May & June to new basis. Organic Division ,,- Solid Aroclor yield Improvement instrumentation project is scheduled for August completion and start-up. New chlorine unloading facilities for Parathion were started up 7/50 without incident. This together with completion of mer cury flasking from the old cell house and signing of a mercury sales contract complete major TSD responsibilities on the chlo rine shutdown project. Correction of minor checklist items and continuing design liaison on Cell House dismantling are remaining active areas. DSW 377587 -11/1/1988 COMPANY CONFIDENTIAL INFORMATION "This document contains confidential information which is the property of Monsanto Company. Only those portions of the document relevant to a duly authorized individual's need to know may be exerpted for him. The report must not be sent outside the Company without written approval and the recipient is accountable for its safe keeping, exerpting or otherwise disclosing of its contents and for its proper disposal." STLCOPCB4099319 Company Confidential 2. Organic Division (Cont'd) Muriatic Acid produced a "water white" record of I.936 M # in July. The Coalescer and catch tank continue to operate effectively with 50% of product samples analyzed thus far less than <2 ppm organics. PR&D is active in development of an analytical characterization of Staley Grade acid for routine control. The 150,000 gallon Muriatic acid storage tank is in service. Agricultural Division `* Sulfur Recovery Project was reviewed with CED on 7/24. CED is now active on the project with Anniston personnel supplying liaison help. Final PR&D Process amendment has been issued as basis for design. Higher N2 sparge and Cl2 levels during July have increased parathion chlorinator yields significantly. Tests.will continue in August. - A project has been approved to correct low heat transfer rates in chlorinator due to jacket fouling by replacement with a new vessel. Payout time on this project is less than 3O days on methyl and installation is being expedited by use of criti cal path planning and close coordination with maintenance. Installation to begin early week of 8/11 with EDC 8/15. Design and Drafting A project to improve the emergency power supply for Parathion (replace one, recondition the second) has been forwarded for approval. Installation is targeted for late September. Pollution Control Preparation of Aroclor-HCl waste audit report underway. Sampling started in Parathion and PNP Departments for audit. Quality The Plant Quality Score was 87.6, down 1.5 from June with a YTD score of 87.6 against a 1969 target of 95.0 minimum. Aroclor 1242 shows increasing evidence of a wider isomer range. Solubility of Aroclor 5460, color and free chlorine of Muriatic show unfavorable trends. Jt . C. Landwehr jw DSW 377588 STLCOPCB4099320 ORGANIC DIVISION 1969 TSD COST IMPROVEMENT ANNUAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Sol.Aro. Level TAR Ind.& -Still SpG EST AFE *1015 ACT Solid Aro. TAR Lower 5060 Soft. Point EST: ACT 2250 2250 2250 2250 2250 2250 2250 .2250, 2250 --- --- 2600 2600 2600 2600 2600 2600 2600 2600 2600 - -- 1500 5490 4890' 215C 4670 8000 4230 1500 5490 4890 2150 467 C 800C Sol.Aro.-Still TAR Coolant temp. EST; 160 170 160 170 160 170 160 170 160 - - AFE 3015 ACT " Sol .Aro. -Chlortcr TAR Batch End EST.' AFE 3015 ACT 590 390 390 390 390 390 390 390 390 - - - -- ' ' *" Sol.Aro. Yield . TAR SW/R Comp osition EST. AFE 3016 ACT 2750 2750 2750 2750 2750 2750 2750 2750 ', - * Solid Aro. Montar 5 Flake AFE 2949 TAR EST ACT 1080 1080 1080 1080 1080 1080 1080 1080 ---- -' Sol.Aro. Blend 4465 TAR EST ACT 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 1690 1920 1680 1490 710 1180 990 1690 1920 1680 1490 710 1180 Sol.Aro.-Verti- TAR cal Still Cond. EST: AFE 2324 ACT 70 80 70 80 70 70 90 70 90 90 9 0 90 90 90 90 - - Sol.Aro.Cl2 T/C Dock " AFE 2342 TAR EST; ACT 940 940 950 00-- Sol.Aro.-New Cl2 TAR Unload - No Delay EST' CED 1831 ACT 950 940 950 940 950 940 950 900 2330 2050 900 2 330 Solid Aro.-Flake TAR & Drum EST. CED 1430 ACT 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 0 0 IG00 2000 2000 2000 3000 0 0 1000 2000 2000 3000 Liq.Aro. TAR 5000 3000 48-53 M #/yr. AFE 2545 EST. ACT 0 550C 0 550C -- - -- Liq.Aro."No.2 TAR 3000 3000 Still Entrain Sep. est: AFE 3093 ACT Liq.Aro. -Montar Disposal AFE 2952 Warehouse Reduce Manpower CEA 1452 TAR est; ACT TAR EST; ACT 1080 1080 1080 1080 1080 1080 1080 1080 1080 1080 0 00 0 0Q 0 0 2000 3000 3000 5000 3000 3000 3000 3000 3000 3000 3000 3000 2000 2000 2000 3000 3000 3000 3000 2000 200C 200C 3000 300C 3000 Liq.Aro.New TAR Burners $3 Still EST ACT 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 0 0 1500 3000 900 0 0 1500 3000 Biphenyl Relocate TAR No. 1 Preheat EST CEA 1892 ACT HB-40 TAR 2nd Autoclave AFE 5102 EST ACT 500 500 500 500 500 500 500 500 500 500 500 500 1500 0 1560 1870 0 0 T5TJ0 150C 0 6 10 1870 0 0 5000 3000 3000 3000 3000 3000 3000 3000 3000 2000_ 3000 3000 2230 2580 0 34 9 0 2420 0 600 9000 6000 5600 600 10,400 8600 DSW 377589 STLCOPCB4099321 ORGANIC DIVISION 1969 TSD COST IMPROVEMENT ANNUAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Bi0 Improve Tower Treat. AFE 3155 Improve Pit. Power Factor TAR EST ACT TAR EST ACT 450 450 450 450 450 450 450 450 00 0 00 900 900 900 900 900 900 900 900 0 500 900 0 500 Central Air TAR 1000 1000 1000 1000 System EST ACT Optimize Rx Time PNP TAR EST ACT 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 0 3420 0 0 0 2940 0 3420 0 00 Reduce Mole Ratio NaOH/PNCB PNP TAR EST ACT 4000 4000 4000 4000 4000 4000 4000 4000 4000 0 00 0 0 00 New Wash Water Pump - PNP AFE 2998 TAR EST ACT 50 50 50 50 50 50 50 50 25 50 50 50 50 50 25 . 50 50 50 50 Automatic pH TAR 500 500 500 Control EST PNP ACT HC1 Filter Pump TAR EST ACT 110- 33O 340 350 33O 340 330 33O 340 New Blow Tank HC1 TAR EST ACT 200 200 200 200 200 200 200 200 200 200 500 20tT 200 200 200 200 200 200 150,000 Gal.-HCl Storage Tank AFE 2468 TAR EST ACT 1760 1760 1780 1760 1760 1780 1760 1760 1780 -u - '" 0 2640 0 Produce Staley Grade Acid TAR EST 780 790 790 780 780 790 - AFE 3076 ACT Cla Plt. Shutdown TAR 8880 8880 8880 8880 8880' 8880 8880 ih 00 CO ISL CEA 1811 EST ACT 8880, 6655 223C 6655 Hg Recover from Residue TAR EST ACT 250 250 250 250 3910 0 06 3910 0 0 0 Hg Wash Tank AFE 2802 ' Biphenyl Productivity TAR EST ACT TAR EST _50 250 250 50 "0 0 00 00 00 5600 5600 5600 5600 5600 5600 5600 5600 5600 5600 5600 5600 ^0 9u6u 15,oa 0 0 0 5578$ ACT 1800 5900 13500 0 0 0 Total Organic By Month M $ Total Organic YTD M $ TAR EST ACT TAR EST ACT 23-3 26.8 29.3 37 .J>,.42.3 51.1 51.6 51.6 51.6 52.7 -53,-5 50.6 27.1 30.2 11.5 Td 3cj'j65 107.4 16.5 23.8 27.8 11.4 25 .75 45.9 2 5 - 3 50! 1 79.4 116.9 m,p 210.3 ~2ZTJ m-5 3J_ 417.8 47J-J; 521.9 46.9 7878" 79.6 1159 144.4 258.5 16.51 40.3 68.1 79.5 105.2 151.1 ** $27,780 adjustment included for months January thru June. DSW 377590 STLCOPCB4099322 AG DIVISION 1969 TSP COST IMPROVEMENT ANNUAL Cooling Tower TAR Repiping EST AFE 2598 Optimize N2 & ACT TAR Cl2 Levels EST ACT Increase Waste TAR Acid Sales EST -ACT Chlorinator R.I. TAR EST AFE 2244 ACT : EVOP Condensation TAR Rx. EST ACT Cl2 Unloading TAR EST CEA 1831 ACT Recycle Wash TAR Water est: AFE 2960 ACT Parathion Recovery TAR EST AFE 2655 ACT Reduce Acetone TAR Losses EST ACT Formulations TAR EST AFE 2897 ACT Change Cooling TAR HsO Item 7J7 EST AFE 3067 ACT Well H^O to Jets TAR EST ACT Ag. Division by Month TAR EST ACT Ag. Division TAR YTD EST ACT TAR EST ACT Organic T)iv . Untargeted - HC1 Catch Tank TAR EST ACT JAN 750 0 0 750 0 750 0 FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 45O 420 410 r 410 420 420 410 420 420 0 00 0 0 00 6600 6700 6700 6600 6700 67 00 0 00 6 0 00 400 300 3OO 400 300 300 400 300 300 00 0 0 00 0 250 250 250 250 250 250 0 ' 750 500 0 12,615 0 12,615 500 750 750 5000 5000 5000 2000 2000 2000 0 890 290 290 290 290 290 0 5800 5800 5800 ' 43OO 4300 4300 0 SLI 1600 1600 1600 1600 1600 1600 3000 6600 10,GCC 4510 10,400 928f! 125 125 125 125 125 125 125 125 125 120 180 155 272 120 180 171 500 500 500 750 50C 9145 9145 9135 14.6Z5, 1468 5 IMS! 14575. J.4.4fd1445512,615 3,12 C 6,780 10,155 4842 0 1205 1,420 10,530 9459 1500 P00C 1H45 P0P9 0 P%Pi 44.L0G 58785 7347C 880+5 1025 3J 117015 12,Q5 25,815 37,770,41,916 0 12,615 17,035 27,615 57,074 00 5000 6250 5960 0 935C oS\N 377591 / STLCOPCB4099323 AROCLOR Company Confidential 3- E. E. Bowles, C. R. Mcllwain, P. D. Kinnear (V. R. Haupt) Aroclor Safety AuditSafety TSD Objective ________________ A - 1 Completed project premise on Biphenyl-Santowax backflow into chlorine lines from chlorinators. Sent out project premise for relocation of emergency chlorinator vents for west liquid chlorinators. . Evaluate Quaterphenyl- 1969 Savings $63,200 TSD Objective Polyphenyl Effects on NFC $14,000 B - 8 (a) Solid Aroclor Yields________________ 1 -___________________________ ________ Density gages installed on chlorinator and still receiver circulating lines. Radiation detector for $4 still level alarm also installed. Remaining work consists of connecting gages to indicators and recorders in control room and installing radioactive source for level alarm, calibration of instruments and start-up targeted for August. Therminol System Potential ; Lost SalesB - 8 (h) TSD Objective Project 3216 (Alter Therminol Distribution System) has been approved for $3,850 capital and $19,390 expense. The project will be installed with the Solid Aroclor Expansion. ' Debottleneck Liquid Yield & Capacity TSD Objective Aroclor Stills________ IncreaseB - 8 (i) ________ The project to install an entrainment separator in the number 2 Aroclor still system was transmitted to Maintenance for construction on July 7. The field test of Aroclor Standard Manufacturing Process Tentative Amendment "B" has been delayed because of a color problem in finished Aroclors. The color problem was traced to No. 2 still and is presently being run at a slower rate. This has eliminated the color problem. BIPHENYL-SANTOWAX W. G. Niemeyer, D. A. Self (V. R. Haupt) Debottleneck Biphenyl & S/W__Refinement to 87.6M lbs/yr. Biphenyl_______ Capacity Increase ' TSD Objective B - 7 (a) ____________ The new gas burner installed in the Santowax reboiler furnace on June 12 con tinues to perform well. Production requirements have recently caused a shift to maximum Santowax and minimum biphenyl production. A capacity test run will be conducted on the Santowax distillation column as soon as the SW/C feed flow meter is re-installed. DSW 377592 STLCOPCB4099324 BIPHENYL-SANTOWAX (Cont'd) Company Confidential 4. Lou Biphenyl Santouax Sales Support for FDA 5460;_____________________________________B - 7 (b) TSD Objective ________ Results of the June test run were issued in a Progress Report, TSD Job No. 370:875, report No. 2, on July 16, 1969. Test results show that we cannot routinely produce Santowax C with less than 0.037. biphenyl without additional cooling in the distillation area. On July 25, 1969, the tempered water cooler tubes: were drilled ont. This additional cooling will help, but we still have, inadequate cooling water flow to the tempered water cooler. Analysis of the entire biphenyl-Santowax cooling water piping is now in progress to determine if a booster pump will solve the problem. ' No. 1 Furnace Liaison (CEA-1892)____________ Capacity TSD Objective Increase______ _________________ B - 7 (c)___________ CED approved funds for the Plant to complete all remaining items on this pro ject. Improve Santowax R Quality with New Distillation Column Quality TSD Objective B - 7 (d) High temperature target meters are still out of service. Design for by-pass loops with blow out connections was issued on July 3* 1969. The by-pass loops were fabricated during the week of July 28. They will be installed as soon as possible. Alter Crude Biphenyl Flow Meter B - 7 (e) Process Study TSD Objective The complete design package was transmitted to Maintenance on July 3> 1969. Installation of this project No. 3270 will provide better control of the biphenyl distillation column. Prediction and Control of Dust Explosion Potential in Biphenyl Flaker Packaging System___________________ Safety . TSD Job No. 93I Issued a project premise on July 23, 1969 recommending a nitrogen fluidization on the bagger and a vent pipe from the feed hopper to the roof. DSW 377593 STLCOPCB4099325 Company Confidential 5. BIPHENYL-SANTOWAX (Cont'd) Designed Experiment for Process TSD Objective No. 1 Biphenyl FurnaceStudyB - 7 (e) ________ Plan to conduct a 10 day test run on No. 1 biphenyl furnace, starting the week of August 4, to determine how major variables effect the product split and conversion. Install Secondary High Safety Level Alarm on Biphenyl Column_____________________ Drafting started on July 25, 1969. TSD Job No. 817 Install Knockout Tank on Safety TSD Job No. 862 Santowax Jet Vent________ ______________________________________________ __________ Requested quotations on tank. Drafting scheduled for September, 1969. HB-40 J. W. Mattern (V. R. Haupt) HB-40 Control Variable Study Process Study With TSD Objective $10 M Potential B - 12 (d) Savings________________________________________________ Process will be investigated to correlate operating variables with high color production and at the same time determine if catalyst usage can be reduced without effecting production. CHLORINE D. W. Dudley (A. G. McCarty) Central Chlorine TSD Backup of Manu- TSD Objective Unloading - CEA I83I facturing Representa- B - 6 (a) _tive - Savings $5^.500 Revision of automatic shut-off controls for the Aroclor dock began with the installation on one unloading spot. Tests on revised dock appear very good. Should complete tests in August. HC1 G. L. Moore, K. G. Hale (A. G. McCarty) Production of Staley Grade New Earnings $28.8 M TSD Objective Acid - AFE 3076 Potential Savings B 7 10 (c) ;.$71 M;__________________________________________________________ __________________ Coalescer and catch tank contributed greatly to a record production of I.936 M pounds of water white acid and $6000 savings (excluding new earnings) were DSW 377594 STLCOPCB4099326 HCl (Cont'd) Company Confidential 6. achieved. Fifty percent of analyzed product acid samples have had organic contents of ^2 ppm on a random basis. PR&D work is continuing to evaluate analytical techniques for routine control of process to produce Staley Grade Acid. Muriatic Acid Storage Savings $21.200TSD Job No. 497 Storage tank has been put into service and is operating satisfactorily. Savings of $2600 were gained during July. Issue HCl Manufacturing Planning Improvement Plan____________________ ________ ;B - 1 (b) TSD Objective Completion of final draft delayed because of free Cl2 problems. Finished draft will be completed in August. Reduce High Free Cl2 in Muriatic Acid Quality TSD Job No. 950 Priority has been given to the new quality problem of free residual chlorine in product acid - this problem has occurred in the last few months only. Due to lack of background data on free Cl2, no correlation to changes in the Aroclor process has been made yet. Since the problem is cyclic, data will be taken under good and poor levels of free Cl2. Preliminary tests should begin in August. Interim actions have been taken to revamp the deteriorated fume collection system on acid loading dock to handle the HCl fumes evolved from tank cars and trucks during air blowing. Design and installation was also completed to air blow those acid storage tanks connected to the scrubber jet. PNP K. G, Hale (A. G. McCarty) Debo_ttleneck to 1,8 H #/mo, Capacity Savings _____________________ $27.500B - 9 (a) TSD Objective There were no letdown problems during the month. Production rates (#/hr. basis) were above standard and a savings of $2940 resulted. Overall production was hurt by high downtime (79.4% on-stream). Installation of a new filter wash pump, scheduled in August, will correct a present bottleneck to realizing increased production from solution of reactor letdown problems. DSW 377595 STLCOPCB4099327 NIRAN Company Confidential 7. K. G. Hale, D. W. Dudley, T. W. Lawrence, J. L. Gaines (A. G. McCarty) Demonstrate Parathion Savings $17,500 TSD Objective Recovery______________________________ 10-15% Reduced COD___________ B - 5 (a) No change in status. Construction in progress on test facilities. Acetone Recovery Savings $12,900 TSD Objective ____________________________ ___________ 20% Reduction CODB - 5 (i) Ejectors on No. 3 and No. 4 condensation reactors were exchanged 7/30. Recovery tests for Methyl parathion will resume in early August. Drafting is scheduled for completion 8/8. Project premise was circulated for approval 7/23. Central Chlorine Savings $21,000 TSD Objective Unloading for Niran _____________________________ B - 6 (a) The chlorine unloading facilities were startedup 7/3O. Operations to date very smooth. Rate has not been demonstrated due to lack of air pad. Production to work with maintenance in rebuilding air pad compressor system. No. 3 Chlorinator Long Cycle Time Profit on New TSD Job No. 927 Sales: $25,000/mo. TSD Objective Savings: $5,000/mo B-5 in Productivity______________________________________________________ Replacement of No. 3 chlorinator approved. Prefabrication will begin 8/4/69 a slippage of one week due to delay in delivery of materials. Actual installa tion to begin week of 8/11/69 with EDC of 8/15/69. Improve Chlorinator Profit on New Sales TSD Objective Cooling System & Savings: $48,000/mo. B - 5 (g) per 1/2 hour Reduction ________________________________________ in Chlorination Time____________________ Gathering of information on boiling systems from literature and other sources is almost complete. Possible approaches are being considered based on this infor mation and evaluation of the existing operation. Sulfur Recovery $271,000/yr. Net Savings TSD Objective from Residue.40% Reduction in S0P_____________________________________ B - 5 (d) Project details were reviewed by CED and Anniston personnel on 7/24-25. The project was turned over to CED. Anniston TSD will provide assistance as necess ary for CED requests. Final PR&D report on Process Changes and Corrosion Studies was issued on 7/24. DSW 377596 STLCOPCB4099328 NIRAN (Cont'd) Company Confidential 8. Optimize Cl2 & N2 Savings $40,000 TSD Objective Levels___________________________________________________ ______________ B -5______ Higher N2 sparge and Cl2 levels resulted in $6,600 savings in July compared to June YTD yields. Further optimization of levels will continue during August. Manufacturing Improvement Plan __________________________________________________ TSD Objective ___________ B - 1 (c) Preparation of Parathion MIP in progress with EDC of 8/15 for rough draft. Wash Water Recycling ____________________________ __ Savings - $7,400 and TSD Job No. 815 7-8% Reduced Hydraulic Load to Waste Treat ___ ment___________________________________________ Preliminary tests indicate that the aqueous wash column effluent stream can be successfully used as a washing solvent in the prewash settlers. Further tests will be made when minor repairs are made to existing piping. Recom mendations for new piping will follow conclusion of the tests; no EDC is pre sently available. Waste Treatment Waste Treatment TSD Job No. 939 Aeration Basins Capacity Increase Air Cooling.________ TSD evaluation indicates that injection of water into the aeration blower air will be ineffective in cooling the basins. Further evaluation of methods for reducing the basin temperature is necessary. PROCESS AND QUALITY ANALYSIS J. L. Murphree, Allen Hale (W. B. Dunlap) Process Surveillance The first semi-annual recalculation of control chart standards is 757. complete. All finished product with 25 lots per year and/or 500,000 pounds produced will be covered by updated control charts. Optimum Test Frequency^TSD Job No. 951 A statistical review of all process control analyses showed a justified re duction totally 233 man hours of lab time per month, equivalent of $2,300 Pr month savings to Production on specific control testing. DSW 377597 STLCOPCB4099329 PROCESS AND QUALITY ANALYSIS (Cont'd) Company Confidential 9. PNP - Monitor of Critical Variables Potential Savings TSD Objective $60,000 C-3 ;________________________________________________ __________ ;TSD Job No. 859 Strong correlations have been found between batch yield and PNP loading to car bon towers, temperature and pressure of reactor, caustic concentration of the charge. No relationship was found between PNP batch quality and batch yield. Automatic Still Control Potential Savings _________________________ $79.000 TSD Job No. 964 ______________;; A Task Force (Dunlap, Lawrence, Veazey) was assigned the problem of defining a control system for the Parathion Intermediate Stills which will obtain the cost improvement predicted by statistical studies of 1968. A Phase I study was laid out to identify and quantify the effect of control parameters. AFE request will be written to cover instrumentation. A progress report is being written. ENGINEERING DESIGN AND SERVICES Mechanical/Electrical/lnstrument Design and Drafting J. C. Price. J. A. Veazey. R. V. Carlisle. R. L. Brewer, J. K. Rennie, J. Childress (W. F. Taffee) Formal bids are now being accepted for dismantling of chlorine facilities. Flasking of mercury was completed in early July - arrangements to return leased equipment now in progress. Verbal approval, in the amount of $15 M, has been received to purchase a new emergency generator for use in the Parathion department. The project (AFE-33O5 $41.9 M) was forwarded for approval on 7/18/69. Projects forwarded for approval: Purchase New Emergency Generator, Recondition Existing Generator, and Relocate Both - Parathion Dept. (AFE-33O5 - $41.9 M), Replace Sight Windows in Niran Cubicles (AFE-3141 Rev. 1 - $0.5 M). Drafting in progress on the following projects: Acetone Recovery (Niran), Provide Facilities to house Biphenyl Pilot Plant (Biphenyl), Revision of Electrical Drawings - as built (Niran). Review drawings were completed for the following projects: Chlorinator Replacement - Niran (AFE-3290 - $15.5 M), HC1 Water-Loop Replacement (AFE-3240 - $8.3 M). DSVV 377598 STLCOPCB4099330 Company Confidential 10. ENGINEERING DESIGN AND SERVICES (Cont'd) Construction drawings were completed for the following projects: Revise piping for Santowax Flow Instruments (portion of AFE-3OI6 " $16 M), Sulfur Recovery P&I, (final drawings), Fire Pump Capacity Check Equipment (AFE-3227 - $4.1 M). UTILITIES ENGINEERING J. C. Price, H. L. Marcum (W. F. Taffee) Results of treatment of the Biphenyl Cooling Tower Treatment were incon clusive because of the fouled condition of the system. The system was shutdown for cleaning in late July and savings of $450 per month will start in August. Continued final design of Steam and Water Meter Projects with completion scheduled for August 15. Started reviewing steam plant operation and collecting data for preparation of Steam Plant MIP. PLANT IMPROVEMENT G. C. Goodwin (W. F. Taffee) A complete breakdown of plant improvement projects and of all other projects that have been deferred for 1969 and 1970 as a result of profit improvement was forwarded to W. E. Chandler. , AFE-3293 - $7.1 M - Upgrade Existing Fire Water System was forwarded for approval. Design packages were forwarded for: Surfacing Fire Lane To Benzene Tank Farm (AFE-3277 - $1.0 M) and Surfacing Drain Pad Under Niran Loading Dock (AFE-32I3 - $3.0 M). POLLUTION CONTROL E. G. Wright (W. F. Taffee) Complaints Community and Govern- TSD Objective ment Relations___________________F - 2_______ Three air pollution complaints were received during July. Two were attributed to S02 fumes and one resulted from HC1 fumes being released to the atmosphere while blowing acid cars. Waste Audits Aroclor, HC1, Niran and PNP Pollution Abatement TSD Objective .F - 3 Waste audits of the Aroclor and HC1 departments have been completed. All samples have been analyzed and the report is now being prepared. Waste audits of the Niran and PNP departments are now being conducted. We expect to be finished with these audits by the middle of August. DSW 377599 STLCOPCB4099331 POLLUTION CONTROL (Cont'd) Company Confidential 11. Waste Treatment All wastes were effectively treated during July. There were some problems with pluggage of the hold tank drain lines. Average daily values for Monsanto effluents are as follows. Average Dally Specifications PNP 1.0 ppm 5 ppm COD 128 ppm Z. 200 ppm Parathion 0.11 ppm ^ 1.0 ppm (Max.) BOD 6.0 ppm 200 ppm DSW 377600 STLCOPCB4099332 PLANT LABORATORIES G. W. Miller Company Confidential 12. PROCESS RESEARCH AND DEVELOPMENT J. T. Bell Of the 110 mandays available in July, 50 mandays were expended on projects scheduled in the 1969 PR&D Program. In addition, 17 mandays were utilized in the preparation of a sales sample of low color Aroclor 5460 and in the study of HB-40 Color Improvements. The remaining mandays were used for supervisory, vacation, illness, and miscellaneous activities. Sulfur Refinement Sulfur Recoveryfor Reuse_________ I. Ransaw_____ PR&D report (Job No. 370-600, Report No. 11) was issued 7/23/69 and the study reviewed with CED on 7/25/69. The project has been terminated by plant research with issuance of this final process amendment. Blend Scavenger Refinement (Aroclor) Improved Aroclor Electrical PropertiesJ. L. Brown The evaluation of attapulgus clay as an absorbant for the refinement of Aroclor 1242-phenyl glycidyl ether mix is now scheduled for completion by 8/8/69. This project has been extended past the tentative completion date 7/3/69 as recorded in the project work plan. HB-40 Process Determine Process Studies____ __________________________ VariablesW. H. Howard A project work plan was issued 7/15/69 with project completion scheduled for 9/12/69. The system has been assembled but start-up problems have delayed progress by approximately 10 days. Biphenyl Tubular Obtain Desired Pilot StudiesBiphenyl/Terphenyl RatioJ. L. Brown Verbal approval of the project to cover capital and experimental expense for this study has been received. Drawings fora small block house for the pilot unit are scheduled for completion by 8/1/69. Muriatic Acid Organics Level DeterminationI. Ransaw A project work plan was issued 7/2/69 with completion scheduled for 7/29/69, The study will be extended to 8/5/69 because of vacation scheduling. 0S\N 377^ STLCOPCB4099333 PLANT LABORATORIES (Cont'd) Company Confidential 13. PROCESS RESEARCH AND DEVELOPMENT (Cont'd) Low Color Aroclor 5460Preparation Sales SampleG. L. Arnett Approximately 7 lbs. of the requested sample has been prepared. The effort has been delayed 15 days by illness. HB-40 Color Improvements___________ Column Absorption_____ ' -J. T. Bell A work plan was issued 7/7/69 and the initial work completed. A study of various bed lengths is to be included prior to project completion. ANALYTICAL AND QUALITY CONTROL S. 0. Kemp Complaint Report Quality Number Material Customer Reason 9-A-69 10-A-69 11-A-69 Aroclor 5460 HB-40 Aroclor 5460 Swift Pure Chemicals Ltd. Upaco Lumps and Foreign Material Color Off Color Lumps YTD Quality Complaints/100 Shipments 0.27 Target 0.20 dSNN 377602 STLCOPCB4099334 Company Confidential 14. COMMUNITY RELATIONS. PERSONNEL. RECRUITING. AND DEVELOPMENT Community Relations 1. J. C. Landwehr attended ALA meeting in Birmingham on July 14 concerned with pending legislation to establish an Air Pollution Control Commission. Recruiting 1. Mr. G. W. Richey, B.S. Electrical Engineering graduate, August 1969 from McNeese State, accepted an offer for position as Electrical/Instrument Engineer and will report August 18. 2. Mr. Brode Morgan, B.S. Electrical Engineering graduate, August 1969 from University of Arkansas, accepted an offer for position as Electrical/ Instrument Engineer and will report September 2. 3. Mr. J. 0. House accepted our offer of employment as Senior Design Engineer and will report August 18. Development 1. G. W. Miller and J. L. Brown attended Instrument Seminar on Gas Chroma tography in Birmingham, July 29. 2. Liberty Mutual Insurance Company sponsored "Safety Management Seminar" at Holiday Inn July 29-30. Those attending were W. B. Dunlap, K. G. Hale, V. R. Haupt, W. G. Niemeyer, J. A. Veazey, J. T. Bell, S. 0. Kemp, and M. D. Turner. Visitors 1. P. W. Gallier, CED, visited July 23 concerning Parathion still temperature control. 2. July 24-25, V. W. Schotte and H. S. Trail, CED, visited concerning Sulfur Recovery Project, CEA 1971. 3. Claude Saunders, Project Manager CEA 8008, visited concerning chlorine dismantling. 4. M. P. Breiner, Supervisor Equipment Disposal Section, visited concerning chlorine dismantling. DSW 377603 STLCOPCB4099335 ( PROCESS IMPROVEMENT DISTRIBUTION OF TIME BY TECHNICAL SERVICE Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec. NEW PRODUCTS PL4NT IMPROVEMENT ( ASSIST ' OPERATIONS SPECIAL ENGINEERING SERVICES TECHNICAL MANPOWER MISCELLANEOUS ACTIVITIES AND ABSENCES i i...... j---* i i i rii i i: DSW 377604 STLCOPCB4099336 G IN MAINTENANCE FOR CONSTRUCTION . company uonnuenLiai TSD PROJECT SUMMARY IN MAINTENANCE COMPLETED NOT CLOSED ' ( PROJECTS SUBMITTED FOR APPROVAL APPROVED PROJECTS IN TSD r Dec. Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec. Jan. STLCOPCB4099337 LABORATORY ADMINISTRATION $/Manhours % Total Plant Operating Cost ie Overtime 7 STLCOPCB4099338