Document aBD4k9a6880y4RGMVaGJwQ3Xy
PLAINTIFFS . . EXHIBFH
CEL-24
CELANESE PLASTIC MATERIALS COMPANY Chemcel Plant Bishop, Texas
TO: P. M. Sykes R. L: Bunkley
RLB-35-79
June 12,
Quality Control Monthly Report May, 1979
CC: Dr. R. A. Daniel - Chatham Mr. J. W. Beltz Mr. W. A. Flaherty Mr. R. W. Murphy Mr. F. M. O'Neill Dr. M. L. Druin (6) - Summit Mr. C. Gottfried
Dr. M. Meisters Mr. F. B. McAndrew Mr. W. L. Shearer Mr. M. M. Wilson Mr. D. Zimmerman Summit Data Files
Mr. A. C. Abshier - Bishop Mr. W. S. Allen Mr. C. A. Amond Mr. G. Artripe Dr. J. D. Bennett Dr. H. L. Davis Mr. J. C. Doedyns Mr. D. L. Dotson Mr. R. D. Fuchs Mr. D. E. Guthland Mr. C. L. Hammond Ms. A. R. Hancock Mr. L. N. Harvey Mr. H. P. Hohon Mr. J. L. Merian
Mr. W. H. Meyer Mr. A. B. Milam Ms. P. J. Moede
Mr. E. Munoz Mr. J. A. Remlinger
Mr. K. A. Rose Mr. R. G. Rothenbe'rg Mr. J. D. Saladino Mr. A. G. Salinas-^ Mr. P. N. Thomas Mr. E. D. Wendler Mr. K. A. Wolf File: 3.017
301.014
501.009 Central Files (3) - CCCTC
I 003872
GENERAL SUMMARY:
Celcon product waivers for Hay totalled 16. 1% of the month's
production total (6.6MM lbs.)- Major quality waivers in Natural Finishing were the result of out of specification melt index and black speck content. Special Products waivers were due mainly to melt index and natural color (on glass filled materials) being out of specification limits.
Celanex(R^) quality waivers amounted to only 0.5% of the month's total production of 1.8MM lbs. The major quality waiver was the result of out of specification ash content.
Nylon product waivers totalled 39.4% of the month's production of 3.14MM lbs. Major quality variances were out of specification R.V. and volatiles.
Extensive support was provided for the start-up of the modified SH-1 unit. While the bulk density of the product flake was, as expected, low, polymer quality appears good.
The long awaited relocation of the Color Lab to the new laboratory
building took place during the month. The move was accomplished
without interruption of essential lab services.
^
I. CELCOtp
"P
A. .Customer Complaints - Dotson/Tijerina/Hemandez
1. Capitol Records entered complaint P-5470 stating excessive gassing occurred with the use of Celcon C-143 natural from lot 8122654. The material was released on waiver for high MI (29.8) and slightly high kd (.021). The higher than normal kd was not considered significant enough to cause the gassing problems experienced. RTS was requested to investigate the customer's molding and processing procedures.. (DLD-87-79)
2. A complaint (P-5469) was entered by Henlopen Mfg. Co., Inc. citing feeding problems due to "stringers" in lot 8121806 of C-143 black. The lot in question was free of strings and strands as released.
. Evaluation of an unopened return bag confirmed the original release analysis on this lot. (DLD-88-79 & DLD-98-79)
3. El Mar Plastics Inc. complained (P-5471) that molding _difficulties occurred with the use of C-244 natural from lot 8102606. Samples of their problem molded parts were sent to Summit. The material in question was released as specification material. RTS .was requested to evaluate the complaint at the customer's site. (DLD-90-79)
003873
RLB-35-79
-2- June 12, 1979
4. Hardie Trading Ltd. of Australia entered a
precautionary complaint (P-5499) over the nonuniformity of color from pellet to pellet in a shipment of GC-25A natural from lot 8101004. In addition, the complaint indicated there were a few burnt pellets in this lot. Release records indicated some pellet to pellet color variability did exist but the molded test chips were uniform in color and well within natural color specification. The possibility of slight pellet to pellet color variability in all
natural GC-25A lots was pointed out to prevent future customer concern over product quality. (DLD-100-79)
5. BASF, Wyandotte Corp., entered complaint P-5518
stating that C-143 natural from lot 8122756 molded
with excessive gassing. The material met all
Quality Control parameters on release. APD was
requested to investigate the problem as normal
Q.C. tests did not indicate any reason for the
problem. (DLD-106-79)
- te
6. A complaint (P-5506) was entered by Shape, Symmetry1 ' and Sun, Inc. stating that C-143 natural from lot 8122851 produced excessive out gassing and mold deposit. A 50 lb. unopened bag was returned to the plant for evaluation.
Plant release records indicated the material met specifications upon release. Evaluation of the return sample confirmed the original analyses. APD was requested to evaluate this material to determine the probable causes for the customer's problems. (DLD-107-79)
B. Manufacturing Support
1. SH-1 Start-Up Support
Technical support was provided for the start-up of the - modified SH-1 unit. Problems were encountered with
equipment failures, polymer plugging, and maintaining proper solvent composition and temperatures during the first five start-up attempts. The sixth start-up attempt (5/30) was successful. Approximately 600,000 -pounds1 of M-90 flake were'produced during the six day run. The quality of this material was acceptable and improving when flake tank problems shut the unit down on 6/5. The average bulk density of this flake was low, 12 #/cu. ft., as was expected from the operating
003874
RLB-35-79
-3- June 12, 1979
conditions employed. When the unit comes on stream, additional support will be provided. (DEG-10-79)
2. Solids in V-1656 - Moede
Recurring solids build-up in the trioxane reactor result in lost production and increased energy con sumption in TO-2. To resolve this problem, work has begun to identify the causes. Two possible causes of paraforming are: metal impurities and pH effects. A procedure for analyzing sodium and iron in the unit's 50% formaldehyde feed by the Spec Lab on a daily basis has been submitted for review and moni toring of pH effects in V-1656 has begun in the unit laboratory.
TO-1, TO-2 Analytical Support - Moede
Analytical schedules for the unit laboratories and the Spec Lab were reviewed. Recommendations have been made in order to (1) discontinue unnecessary analyses, (2) reduce the gas chromatograph analysiste load in TO-1 and (3) improve the analytical methods and techniques used in the unit laboratories. A 7 report is pending publication.
4. Evaluation of Chroma Black Concentrate' - Remlinger
An evaluation of Chroma Corporation's 20% carbon black concentrate was made (JAR-23-79). This was Chroma's second attempt to qualify this Celcon black concentrate. Color lab testing showed this concentrate to be inferior to Bishop's and was, therefore, not recommended as an alternate to Bishop's current Celcon carbon black concentrate.
C. Analytical Development
1. Irganox 259 in Celcon - Saladino
A letter was published (JDS-6-79) describing the develop ment and verification of a procedure for analyzing Irganox 259 stabilizer in Celcon by U.V. spectrophotometry. This method (CL 1-61) was revised and is being used by the Spec Lab for routine analysis.
_v
2. Water Analysis by Fisher Titrimeter - Saladino
A method for standardizing and operating the Fisher water titrimeter was developed and published. A report was published (JDS-5-79) comparing the Fisher titrimeter to the Aquatest analyzer. The Fisher titrimeter is the preferred instrument, due to its greater accuracy and range.
003875
RLB-35-79
-4- June 12, 1979
D. Routine -Analytical - Salinas
Sample count, overtime hours, holiday overtime hours, and formaldehyde feed concentrations for May are summarized in Table I. The sample count for May was 5031 compared to 5364 in April. The overtime hours for May were 324 compared to 295-in April.
Special analytical support was provided to the following projects:
1. Color laboratory - Irganox and Cao-5 comparison study in SH-1 and MH-2 polymer.
2. W.E. Dentler - Light Ends Rate Trial Evaluation (WED-15-79).
3. K. H. Patel - PBT High IV Trial Batch No. 5 (KHP-6-79).
4. FDA Testing - Eight finished lots were tested this month.
5. SH-1 Start-Up Support - David Guthland.
II. CELANEX
A. Customer Complaints - Dotgon/Tijerina/Hemandez
1. A complaint (P-5486) was entered by ICC Comercio E. Industria Ltd., Brazil, stating that a 2750 lb. shipment of Celanex 3210 black (lot 8102243) was contaminated with gray pellets. A small sample of the gray pellet contamination was received with the complaint.
Plant records indicate this lot was released as specification material. Inspection of the shipping retain confirmed the original findings on the lot as released. (DLD-91-79)
2. Hardie Trading LTD, in Australia, complained (P-5500) that an excessive- amount of "strings" was causing
`feed problems with the use of Celanex 2012 natural lot 8081441. A small bag of the "strings" was returned for identification.
The return sample was found to be composed of Celanex -"line skins". Our plant release records indicated this lot of material had an abnormal amount of line skins present, but these were waived by Marketing and the lot released. It was pointed out that some line skins are inherent in this product. (DLD-99-79)
003876
RLB-35-79
-5- June 12, 1979
B. Analytical Development
Determination of Antimony Trioxide in Celanex - Saladino/Allen
An atomic absorption method for the determination of antimony trioxide (Sb203) in Celanex has been developed and is being evaluated. It appears that the method will be suitable for use in determining the Sb203 content of Celanex products and will therefore be a useful tool to identify and resolve production problems. A precision study on the method will be performed by the Specification Lab.
III. NYLON
A. Customer Complaints - Dotson/Tijerina/Hernandez
1. A precautionary complaint (P-5488) was entered by Nypro
Inc. stating excessive black speck contamination was
found in Nylon 1310-2 natural from lots 9010981 and '
9012581. A small bag of pellets illustrating the black
specks was returned with the complaint. Plant recoij|s-
indicated both lots to meet all quality release
t
parameters including pellet quality prior to shipmentJ
Lack of an unopened 50 lb. return sample precluded any
further evaluation or plant comment. (DLD-89-79)
2. Reynolds Metals Company complained (P-5495) that film made from N-186 lot 8231231 contained excessive gels. A sample of the resin was returned for evaluation. Quality records show the lot to be specification material.
Testing at Deer Park showed the lot to meet quality specifications for gels. Additional samples of the lot were also being evaluated by Summit for gel formation and quantity. Summit's results will be reported as they become available.
3. Nypro Inc. entered a precautionary complaint (P-5504) stating that N-249 precompounded white from lot 8100311 had too high a level of black specks. Samples of molded parts and an unopened 50 lb. bag were returned for evaluation. Evaluation of a return sample indicated that the complaint is valid. (DLD-102-79)
4. A precautionary complaint (P-5502) was entered by "Monofilaments Inc. citing poor seals on bags of Nylon
1200-1 natural from lots 9021321 and 9021521. Insufficient information as to which seal (factory or plant made) was defective and the lack of a bag for examination prevented any further evaluation by the
plant. Plant personnel, however, were made aware of the complaint.
003877
RLB-35-79
-6- June 12, 1979
5. Hardie Trading LTD of Australia entered precautionarycomplaint P-5501 which stated that a shipment of Nylon 1310-2 natural from lot 7131204 had bags with poor seals. Three bags illustrating the problem were returned to the plant for inspection.
Inspection of the bags supported the customer claim. The manufacturer's seal (bottom corner) of the bags was defective. The seal problem, however, is believed to be due to the age of the bagged material (December, 1977). The seals therefore could have been damaged through repeated handling considering the time span from production to actual usage. Plant personnel have, however, been made aware of this complaint.
B. Manufacturing Support
1. Nylon RV Problems - Allen
Off spec RV continues to be a problem with 1503 nyloifo
This problem appears to be related to the type of
-
fiberglass used, with PPG glass filled nylon consistently
having a higher RV than OCF glass filled nylon. During
recent production (March - May, 1979) the mean RV.of '
1503 nylon produced with OCF P277B was 53.3 whereas
PPG 353 glass gave a mean RV of 60.2. Work will continue
to identify the reasons for the RV differences between
PPG and OCF glass filled product. A preliminary report
(WSA-13-79) has been issued.
2. Nylon Unit Lab Salt Analysis - Allen
Bausch & Lomb refractometers were set up in the nylon unit labs. These instruments will be used to determine the concentration of nylon salt in solutions from the salt area and the salt evaporator. This procedure is less time consuming than the previous procedure CL 1-90, which determines salt concentrations by viscosity.
3. .Contamination of Chemetron Nylon Black Concentrate Remlinger
Metal contamination in PPG's Chemetron nylon black concentrate remains a problem (JAR-22-79). Since March, PPG has been unsuccessful in three attempts to provide metal free concentrate. PPG's latest shipment (5/21/79) of concentrate was inspected and found to contain low levels of metal specks. The level of metal contamination was the lowest found to date. The vendor has again been contacted regarding this problem. In addition, samples of the concentrate
003878
RLB-35-79
-7- June 12, 1979
were sent to Summit to determine the composition of the carrier resin. With this information, the search for an alternate supplier will be undertaken.
4. Nylon Packaging Studies - Remlinger
The results of the moisture uptake studies of nylon in several package constructions has been published. (JAR-24-79)
The following conclusions were drawn:
a) A savings of ''*$90,000 can be achieved if it is
possible to convert our present nylon bags and box liners from a 0.0005 in. A1 foil/surlyn
laminate moisture barrier to a 0.00035 in. A1 foil/PE laminate barrier.
b) A comparison of nylon box liners showed that
after eight weeks there was no difference in
moisture uptake of resin packaged in a 0.0005 in.
foil liner or in a 0.00035 in. foil liner.
te ??
c) Comparison of our present Celanex bag (0.00035 ih.
foil/PE) with the Polyplastics tube type bag . r*
(0.00035 in. foil/saran) shows them to be the same in moisture uptake inhibition after 14 weeks.
d) The foilless Saranex bag (PE/saran/PE) is not acceptable for use with nylon resins.
The following recommendations were made:
a) Saranex should not be used as a foil substitute in nylon bag construction.
b) The Polyplastics tube bag should not be considered as an alternative for our domestic nylon bag.
c) A new study should be implemented to investigate the difference in the moisture uptake rate of nylon packaged in 0.0005 in. foil/surlyn laminate bags and in 0.00035 in. foil/PE laminate bags.
5. Nylon Nucleant Production - Allen/Salinas
-The inventory status of nylon nucleant is summarized below:
Inventory 5/1/79 Inventory 5/31/79 Nucleant Produced in May Nucleant in Process
6 drums 10 drums
25 drums 14 drums
003879
RLB-35-79
-8- June 12, 1979
C. Analytical Development
Analysis of Iodine in 1003 Nylon - Allen
Analysis of 1003 nylon at Bishop has consistently given high levels of iodine. This has been traced to an error in the analytical procedure. This error has been corrected and the revised procedure is in use. Twelve lots analyzed before this revision had an average iodine concentration of 1830 ppm whereas the 12 lots analyzed after the revision had an average of 1374 ppm iodine. The target addition rate in the unit is 1400 ppm iodine. A report will be issued.
IV. INDUSTRIAL HYGIENE - Hancock, Grey, Pritchard, Soliz
A. Formaldehyde Surveys
A formaldehyde survey in the T02/SH2 unit was completed. The survey was requested to determine if the exposure levels had decreased and remained low since the repair oj: the latent heat line. Exposure levels were all below' th||_ 1.85 mg/m3 action level. A report is in progress. * f"
Formaldehyde personal samples were taken in Special
^
Products during a GC-25A run to complete the formaldehyde
survey in that unit. No formaldehyde exposure problems
exist under normal conditions. Only one employee has
been found to be exposed to formaldehyde above the 1.85 mg/m3
(1.5 ppm) action level. No other over exposures have been
found.
B. Dust Sampling
The-survey for nuisance dust in the Natural Finishing unit will require more sampling of the pellet blender operators. Unit down time has delayed monitoring. Ceiling concentra tion samples taken on the pellet blender operators show exposures (80-250 mg/m3) above the suggested 20 mg/m3
ceiling level. It is suspected that most of the dust exposure comes when disposing of the "stabilizer" bags after a blend is made. The survey will continue to better document the exposure levels.
The nuisance, dust survey in Special Products is scheduled for_complet;ion by June 15. No apparent dust problems exist.
C. Miscellaneous
Employees in the SH1/T01 unit were monitored for benzene exposures while unloading benzene trucks. Personal samples ranged from 44 - 89 mg/m3. These were short term samples
for ceiling level concentrations. Respirators were worn. A report will be issued.
003880
RLB-35-79
-9- June 12, 1979
D. Analytical Load
The OSHA/environmental analytical load, to date, is summarized below.
Month
OSHA Environmental
SHI/TO1
----- F
0
SH2/T02 95 0
MH2 18 0
Nat. Finishing 106
0
Spec. Prod.
63
0
Celanex
30
Nylon
00
Chemical Co.
0
0
"ZFT5
YTD
OSHA Environmental ........... 1
222 0 99 1
222 2 242 2
22 1 24 1
03 871 11
V. COLOR SERVICE - Artripe, Rothenberg, Harvey
- General Summary:
j|L
Color Service developed 28 color matches this month. The distribution of color match work for each marketing group wash'll Nylon, 7 Celanex, and 3 Celcon matches; of this. 5 Celcon and 2 Nylon were reworked from existing formulations.
253 pounds of products were extruded and shipped.
A total of 229 chips were sent out in the process of filling 15 sample requests for chips only.
We have scheduled 23 color matches for June, leaving the backlog of unscheduled work at 38. This backlog is for reformulation of existing formulas. Reformulation is necessary due to pigment obsolescence or chip replenishment. There are no new marketing requests on backlog.
Work is now underway to determine if a new computerized color matching .system (Applied Color Systems, Inc.) can be justified on a cost reduction basis.
Extensive work is being done to reformulate Chrysler Red CS 32114 (S.O. JRJ-79-026). There is a potential Fade-Ometer exposure problem with existing pigments. We are currently evaluating several rfew red pigments which may resolve the problem.
003881
RLB-35-79
-10-
June 12, 1979
1. Blanket Approval for Bishop Colorants - Rothenberg
Report RGR-30-79, Blanket Approval for Listed Colorants at Bishop, was issued. This report requesting blanket approval for pigments currently in use for Celanese Celcon, Celanex and Nylon color formulations is in compliance with guidelines agreed upon with Dr. G. W. Halek. Each pigment used at Bishop is listed with pertinent data pertaining to that pigment (Color Index Generic Name, Chemical Identifica tion, Potential Uses, etc.), along with Material Safety Data Sheets (MSDS). In addition, typical additives for Celcon, Celanex and Nylon are included in the report. (Reference: RGR-15-79).
2. Fade-Ometer Test Procedure - Rothenberg
Test Method CL 2-26, Accelerated Exposure to Sunlight Using the Atlas Type FDAR Fade-Ometer, was issued (RGR-41-79). This method describes a procedure primarily to check and compare color stability (light-fastness and fading) of a plastic when exposed in a light (sunlight) and water-expgsure apparatus (carbon-arc type). Also covered are the prepara tion of test specimens, test' conditions, and the evaluation of test results.
A general care and maintenance checklist for the Fade-Ometer (RGR-43-79) was developed. The checklist will be followed as closely as possible to insure satisfactory use and long life of the Fade-Ometer.
3. R3-866 Pigment Availability - Rothenberg
R3-866, C.P. Cadmium Golden Yellow 1487 (Harshaw Chemical Co.), a standard pigment for Celcon, Celanex and Nylon color formulations, was discontinued by the manufacturer. We have been informed that R3-866 can be purchased on a special request basis consisting of 1500-1800 pound lots. (RGR-42-79)
4. Pigment Evaluation - Rothenberg
Seven (7) new pigments have been received during this time period. Final evaluations on these colorants will be completed shortly.
VI. STATUS OF LAB BUILDING CONSTRUCTION - Rose
The Color Lab moved in and all lab equipment is operational. Several problems have been experienced with the thermolator/ chilled water system, but at present it is functioning satis factorily.
003882
RLB-35-79
-11-
June 12, 1979
The two-story hood is still incomplete. The exhaust blowers have not been put in place, and a steam valve in the hood needs repair. Two sections of chilled water line still need insulating.
Many leaks in the roof were "discovered" during recent rains. Significant repair will be needed to make watertight.
About half of the larger sized exhaust blowers have been installed. The remainder are repainted and ready to install. All hoods will need balancing to achieve 150 ft/min face velocity.
A broken steam vent pipe above the ASTM room has not been repaired. Condensate forms in this vent pipe and leaks out through the break and drips into the ASTM room during cold weather. This must be repaired before next fall.
Backs for the island bench sink units have not been received or installed.
RLB:s lh Attachments
003883
-
VO tn CO O ON VO
ON o
as
iH CM o
CO
r--1 fH
CO ,vO
poH
ON
orH
VO
o
CM
m
CO CM
o
o o
tH
o\
CO CO
0o0 in
<t co
CM ON o. CO m
CO 00
O m
00 MCOt
o
O CO tH
m in CM
CO VO tH
r- iH
rH
><G
MD VpHO
r"4
OCi *acM!>-
ta/1
Z
CO3tf
O)
zo QO3H
in *H iH mpH pH
iH co o in VO VO tH rH mpH pH pinH pH
<9
oo W
2 <CO
0)
C f O 4->
ao:
0Q0.
cO3c
00 OO 3-
CO co CM CM CM CM
CO CM CO
VO CCMO
MCOt co
0O0 m
<ont
CM CoO
ON Mt m
CO 00 Mt
o <r m
oom
00 rH
m CM
o
r-* rH
m
co
o<u
<D
Ct *Cr-
O 4->
orH
ON CM
co vo
St
CM -o
VO
o
Z 3o
a:
Q.
00
0)
V
zo
3O
<t CM
DC CO
PH in m
pH 00 CM
00 ON CM
oin
r-.
o<t m
oOO
o
Mt in
iH
o
oco
in in
rH CM
V o
CO VO
CO
co
a* <--n1
<a$0-;
<c
f> 1
o
CM1 O
fmmm
t
CMt
<M1
cr jpl=/"l UCr. 4<J3-9>. <9
*a4OCa3&3-/>>.. uaa)J
<Xac9> a;
<C9 a.
O
p(""/I z4<S0<r-99>). 319
o
OC
r~
-40lUC-/>)l
<HoI--r
CM OO
vO co
ON
CM
iH
CO
o rH <r ON
o 00 *H
in
<0/)),*--to^ rQ-. QQJ.` iEfn9 H>~i
r-- 4(-O> ><--
4acp-> D3OC
0C) 4r---) 3O zOoc1 '
i--O
CM
--1
j~ 10/5) --4 tn
pH
o
in o o in n
II OO
rH CM I''- CM
OO kn Kt CO <f pO CM O
oobp O
c(J oo
z
Sir. 3 J0O0C_3 X" 0--1
X
tke! %
0>)
>cu- .
;c5 >
<< <
*aoj L0l).
*u0a0.)/
o'* a
o zoz
ozzo
c 0
Q St<--cOt
H cocm
{hH
o
ON
in
4J C P0^4
CtCMOo
<CMfr CO
.. >J >N h4
a>
B
nj rt iH -a
<H
H 4J
360-tHH
O H
M a)
a> o Qi X
S H
* ao o
0^
1'
f i i
t
-
Gross Production
Total Packaged Off Specification
Quality Waivers
!
TABLE II Celcon Quality Summary
M Lbs
MAY Percentage
6,671.1
100.0
1,057.1 1,073.5
15.8 16.1
,1'
% 1<
i
i
Year to Date
M Lbs
Percentage
33,500.1
8,460.6 7,037.6
100.0
,25.2
J-21.0
i'
TABLE III Celcon Experimental Products
-*
Product
C234A C240A C244 C300
Production
48,000 192,555 657,000 270,400
Releases
48,000 192,555 657,000 270,400
~$
_ ?Vi
.i
* 4i4
'i 'u* ii
003885
i
TABLE IV
Analysis of Celcon Packaged Off Specification
natural Finishing
MAY
Defect
Lots
Melt Index Discolored Pellets Black Specks Stabilizer Content Ash Content Natural Color Ext. HCHO 10X Melt Index Kd Volatiles
3 1 3 0 0 0 0 0 0 0
Quantity M Lbs.
420.6 97.6
476.7 0 0 0 0 0 0 0
7. of Total Natural
7.7 1.8 8.8 0 0 0 0 0 0 0
% of Quantity Total Lots M Lbs. Natural
40 3493.8 9 408.5
23 1776.2 10 560.8
1 28.3 3 523.5 4 108.8 1 19.1 3 362.5 1 44.5
13.8 1.6 7.0 2.2 0.1
2.0 0.4 0.1
1.4 0.2
Special Products
MAY
Defect
Lots
Melt Index 'iscolored Pellets olor Match Off Size Pellets Colored Pellets
(Contamination) Volatiles Stabilizer Content Kd Black Specks Tensile Strength Natural Color
(Glass Filled)
6 0 1 3
0 1 0 0 0 1
3
Quantity M Lbs.
94.8 0 5.1
18.3
0 1.8 0 0 0 12.9
44.4
7. of Total S.P.
- 7.6 0 0.4 1.5
0 0.1 .0 0 0 1.0
3.6
Quantity Lots M Lbs,
42 583.1 5 44.5
11 67.0 32 446.6
5 22.4 6 90.2 11 366.5 6 55.2 1 9.4 2 25.6
13 163.3
fi 7o"ofT Totals S.P.:
7.1 0.5 0.8 5.5
0.3 1.1 4.5 0.7 0.1 0.3
2.0
003886
TABLE V
Celcon Releases
Fornulation
Releases
Quantity
(M Lbs) MAY YTD
Lots MAY YTD
Quality Waivers
Quantity
(M Lbs)
Lots
MAY
YTD
MAY YTD
M9000 Flake
0 16.3
02
M9001 Flake
234.2
781.3
19 65
M27000 Flake
24.9
24.9
22
M2501 Natural
0 . 673.8
0 15
313.2
8
M2504 Natural 125.6 ' 814.2
2 17 97.6 480.2 1 10
M2514 Natural 0 25.7
01
M9004 Natural 3466.7 14009.9
33 103 750.5 3319.5 7 23
M9014 Natural 529.0 1778.4
4 13 43.7 615.8 1
5
M90210 Natural 0 - 30.2
01
30.2
1
M14014 Natural
0
49.6
01
C143 Natural
414.0 1812.8
3 23
195.2
2.
M2 7004 Natural 170.5 1459.0
1 12
68.4
1
M27014 Natural 0 913.5
0 20
225.1
6
U1011 Natural
0 144.3
06
67.4
3
M2501 Color
0 21.8
02
M9004 Color
225.6
999.2
20 98 14.7 189.1 1 18
M9014 Color
3.2 3.2
2 2 1.9 1.9 1 1
M9008 Color
0 98.3
09
M9008 Natural
19.2
186.2
2 12
14.2
1 -
M9034 Color
100.9
205.9
6 . 11
54.2
98.1
3
5
M14014 Color
0 38.8
03
C143 Color
0 19.9
04
5.6 2
M27004 Color
0 107.1
0 10
2.6 1
M27008 Color
24.7
131.0
3 12
48.9
3'
M2504 Black
11.6
107.1
2 13
39.9
1
M9004 Black
460.6 1873.2
12 56 42.0 294.3 1
8
M9014 Black
.35.9
342.7
3 18 3.1 160.6 1
7
C143 Black
35.2
118.7
26
M27004 Black U1011 Black
79.5 20.9
207.3 20.9
28 44
'
GC25A Natural
77.8
395.0
6 32 57.4 114.8 4
9
GC25A Black M9007 Color
0 38.3
1296.2 199.9
0 53
10 49 *
12.7
1
M9007 Black
4.3 122.6
16
Salt & Pepper
80.4
754.7
6 55
C155
0 124.7
05
85.3
3
C234A
48.0
735.1
2 ` 26
8.4 99.8
1
4
C240A
192.5
371.6
13
93.8
1
C241
0 64.7
04
18.2
1
C243
0 224.1
05
C244
657.0 2160.9
6 24
309.6
4
C251
0 211.2
06
133.2
3
C252
0 176.4
02
C254
0 12.6
01
C255
0 5.0 0 1
C257
0 12.0
01
C300
270.4
635.8
26
C301
0 - 267.5
03
TOTALS
7350.9 34785.2
156 834 1073.5 7037.6 21 132
7. COLOR BLACK OTHER GLASS FILLED NATURAL CONCENTRATES
Month
5. 08 9. 41 4. 61 1. 06 79. 27 0. 57
YTD
5.21 9.79 4.53 4.86 74.68 0.93
-
QUALITY WAIVERS
MONTH 14.6
YTD 20,2
003887
Gross Production
Total Packaged Off Specification
Quality Waivers
TABLE VI Celanex Quality Summary
MAY________________
M Lbs
Percentage
Year to Date
M Lbs
Percentage
1,882.2
100.0
10,310.4
100.0
45.4 8.7
2.4
717.5
6.9
0.5
596.6
5.8
TABLE VII
Celanex Experimental Products
Product
J225 J226 3221 J228
Production
9700 7500 12950 13050
Releases
9700 7500 12950 13050
003888
TABLE VIII Analysis of Celanex Packaged Off Specification
__ __________MAY
Defect
Lots
M Lbs
Flammability
00
Discolored Pellets 4
36.7
Ash Content
1 8.7
Off Size Pellets
0
0
Volatiles
00
Colored Pellets (Contamination)
0
0
% of Production
0
1.9 0 0
0
Year to Date
---------5~"5I-------Lots M Lbs Production
3 119.3
1.2
5 52.3
0.5
20- 410.1
3.9
1 45.0
0.4-
1 .39.4 Ij 0.4 !t
2
51.2
' 0.5
003889
TABLE IX Celanex Releases
Formulation
Releases Quantity (M Lbs) MAY YTD
2000 Natural 2000-2 Natural 2012 Natural 2012-2 Natural 3200-2 Natural
3210 Natural 3210-2 Natural 3211-2 Natural 3300 Natural 3300-2 Natural 3310 Natural 3310-2 Natural 3311 Natural 3311-2 Natural 3200'Black 3210 Black 3210-2 Black
3300 Black 3300-2 Black
3310 Black 3310-2 Black 3311-2 Black
3300 Color 3310 Color 3311-2 Color J225 J226 J227
J228
0 0 0 0 0
0 0 39.5 803.5
47.1 0
39.0 15.0 47.0 124.1
0 0 587.4 0 79.3 0 54.4 0 53.7 53.7 9.7 7.5 13.0 13.0
25.9 209.6
86.3 76.1 38.9 694.0 217.8
39.5 2914.1
47.1 1152.9
370.5 15.0 47.0
265.3 101.5
45.2
2595.3 19.1
309.1 100.8
54.4 122.7 122.7
53.7 9.7 7.5
13.0 13.0
'
TOTALS
1986.9 9767.7
Lots MAY YTD
02 0 25 07 08 01 0 46 0 13 11 36 102 11 0 59 1 17 11 11 38 05 02 8 37 01 4 18 06 22 09 38 44 1 `1 11 11 1' I
75 394
Quantity (M Lbs) MAY YTD
30.4 8.7 251.0
91.3
19.5' 25.5 123.8 34.7 20.4
8.7 596.6
Lots MAY YTD
2
17 6
,&
:; -'-J
1 i 3
2 1
1 23
QUALITY WAIVERS
0.4 6.1 MontE------------ 7TG
003890
Gross Production
Total Packaged Off Specification
Quality Waivers
TABLE X Nylon Quality Summary
M Lbs
MAY Percentage
Year to Date
M Lbs
Percentage
3,146. 3
100.0
12,871.4
100.0
1,389. 9 1,238. 7
44.2 39.4
4,522.4 3,903.7
35.1 30.3
TABLE XI Nylon Experimental Products
Product
N181 . N184 N224 N355
- Production
20,400 18,000 414,700 197,410
Releases
20,400 18,000 414,700 197,410
&
'
003891
TABLE XII Analysis of Nylon Packaged Off Specification
Defect
Lots
Relative Viscosity Volatiles Ash Content Discolored Pellets Off Size Pellets Natural Color Izod Impact
icleant Copper
24 23
1 0 1 9 2 0 2
MAYYear to Date
% of
:
% of
M Lbs
Production Lots M Lbs Production
737.7 610.6
2,3.4 19.4
105 2544.4 73 1670.5
19.8 13.0
8.9 ' 0
22.2
0.3 0
0.7
8. 138.8
1.1
5 30.9
. 0.2-
3
81.0
fl- 0.6
289.9 81.1
9.2
12 320.2
^ 2.5
2.6
14 316.9
2.5
0
0
9 173.7
1.3
42.5
1.3
2 42.5
0.3
003892
t
TABLE XIII Nylon Releases
Formulation
1000-1 Natural
1000-2 Natural 1000-4 Natural 1003-1 Natural 1003-2 Natural 1200-1 Natural 1300-1 Natural 1310-2 Natural 1310-4 Natural 1400-2 Natural 1403-2 Natural 1500-2 Natural 1503-1 Natural 1503-2 Natural 1600-2 Natural 1603-2 Natural 1000-2 Black 1003-2 Black l10-2 Black : 3-1 Black 1. 3-2 Black 1603-2 Black 1503-2 Color 1603-1 Color 1603-2 Color N181 N184 N186 N198 N224 N243 N245 N269 N270 N273 N355 N357
TOTALS
Releases Quantity CM Lbs) MAY YTD
199.1
484.5 169.9 118.0 257.1
0 0 0 0 0 0
136.9 164.7 614.4
42.7 0 0 0
185.2
0 222.0
0 0 130.9 0 20.4 18.0 0 0
414.7 0
118.4 0 0 0
197.4 31.-2
354.4
1239.0
611.1 177.9 907.0 221.4
58.0 617.5 331.3
63.0 32.9 264.9 284.3 904.2 103.0 24.9 195.9 241.5 246.4 39.2 1283.9 51.7 72.6
209.4 12.6
408.4 18.0
116.0 41.2
1209.4 627.6 175.6 342.0 148.1 147.5 804.9 .315.6
r ~
3525.7 12902.3
Lots MAY ' YTD
Quality Waivers
Quantity
(M Lbs)
Lots
MAY YTD MAY YTD
10 18
41.3
24 62 49.6 224.7
8 31 58.7 116.4
69
13 46 62.8 142.5
0 21.
117.7
03
0 32
78.3
0 16
97.4
03
01
4 8 69.5 130.7
5 9 164.7 252.2
19 28 614.4 826.8
2 4 33.8 74.7
01
06
134.3
0 10
213.6
5 7 185.2 185.2
01
39.2
7 37
603.7
02
23.0
06
11 18-
01
12.6
1 20
11
0 13
9.0
02
19 60
63.7
0 32
250.7
69
0 18
07
07
10 42
227.6
15
38.4
2 3 12 36
37 11
4 5
2 -19T
5
4 7 25 2
4 7 5 1 16 1
1
1
3 13
12 1
152 597 1238.7 3903.7
41 150
QUALITY WAIVERS 1
35.1 Month
30.2
"YTU
003893