Document aBBdzqgXp7YYdXydXbD36qapX
f t E A ~ United States
.._~
Environmen tal Pro tection
,.,
Age ncy
Inspection Entry Date/Time Inspection Exit Date/Time
Regulatory Program Type of Inspection
EPA REGION 6 Enforcement Division
INSPECTION REPORT
3/24/2025 9:00 (CT) (Opening Conference) Announced: No
3/28/2025 8:30 (CT) (Site Tour)
Access: Granted
RCRA Compliance Evaluation Inspection (CEI)
Facility or Site Name Facility/Site Identifier Facility/Site Physical Address City, State, Zip Code County/Borough Generator Status NAICS Type of Operation
Geographic Coordinates
Morgan City Harbor and Terminal N/A 800 Youngs Road Morgan City, Louisiana 70380 St. Mary N/A 488310 Morgan City Harbor and Terminal, also known as the Port of Morgan City, operates as a port in St. Mary County, mainly in charge of maintaining the waterways. 29.69203, -91.200027
Additional Persons Participating in Inspection:
Name
Title
Organization
John Penland
Inspector
EPA REGION 6
Erin Young-Dahl
Inspector
EPA REGION 6
Janosh Wolters
Contractor
Eastern Research Group (ERG)
Email Penland.John@epa.gov Youngdahl.Erin@epa.gov Janosh.Wolters@erg.com
Lead Inspector: Vince Damiano
ERG
Vincent Damiano
u1g11a11y s,gnea oy v1nceni Damiano Date: 2025.05.01 15:53:17 -04'00'
IVince.Damiano@erg.com
Page 1 of 3
Morgan City Harbor and Terminal
SECTION I - INTRODUCTION Site Entry and Purpose of the Inspection
Inspection Date: 3/24/2025
The Port of Morgan City and surrounding facilities were selected for inspection based on a Regional initiative to evaluate facilities at ports receiving or transporting Resource Conservation and Recovery Act (RCRA)regulated hazardous wastes, and/or have an International Convention for the Prevention of Pollution from Ships (MARPOL) Annex V Certificate of Adequacy (COA) issued by the U.S. Coast Guard (USCG).
This report is based on information supplied by the facility representatives, inspector observations, portrelated facilities, and other records, including photographs taken (see Appendix 1), verbal or written statements made during or after the on-site inspection, and/or materials shown, demonstrated, or submitted to the Environmental Protection Agency (EPA) during or after the on-site inspection. In addition, information gathered prior to or after the inspection from a review of EPA, State, and public records may be included in this report.
Attendees
Title/Organization
Lead Inspector/ Contractor/ERG
Inspector/Enforcement Officer/EPA Region 6
Inspector/Enforcement Officer/EPA Region 6
RCRA Inspector/ Contractor/ERG
POMC
POMC
Name Vince Damiano John Penland Erin Young-Dahl Janosh Wolters Michael Knobloch Mac Wade
Email Vince.Damiano@erg.com Penland.John@epa.gov Youngdahl.Erin@epa.gov Janosh.Wolters@erg.com Michaelk@portofmc.com Mac@portofmc.com
Opening Conf.
Yes
Closing Conf. N/A
Yes
N/A
Yes
N/A
Yes
N/A
Yes
N/A
Yes
N/A
Page 2 of 3
Morgan City Harbor and Terminal Facility General Description
Inspection Date: 3/24/2025
Tenant/Area Morgan City Harbor and Terminal
Inspection Date
3/24/25 and 3/28/25
Process Description Morgan City Harbor and Terminal, also known as the Port of Morgan City (POMC), operates as a port in St. Mary County, mainly in charge of maintaining the waterways. POMC does operate under a MARPOL COA.
Area of Concern
Yes
SECTION II - OBSERVATIONS
Facility: Morgan City Harbor and Terminal
Section: 2.1
Date: 3/24/25, 9:00 AM
Contains AOC: Yes Contains CBI: No
I
I
Lead Inspector: Vince Damiano Attendees: Mac Wade (Executive Director) and Michael Knobloch (Manager)
The inspection team arrived at the POMC office to conduct an opening conference on March 24, 2025, at 9:00 a.m. with Mr. Wade and Mr. Knobloch. The team made introductions and provided a summary of the purpose of EPA's visit and EPA's authority under RCRA Section 3007 to perform the inspections. Mr. Wade explained the layout of the port, stating that POMC owns approximately 58 acres on or near the waterway. POMC has a few tenants that primarily lease warehouse or office space. Mr. Wade also noted that POMC has 1,200 feet of dock space capable of accommodating large vessels, and that the primary purpose of POMC is to maintain the waterways and perform dredging activities for beneficial use to support vessel navigation along the waterway. Following the opening conference, the inspection focused on RCRA compliance in the surrounding area.
On Friday, March 28, 2025, Mr. Knobloch joined the inspection team to observe POMC's warehouse space, which was previously leased by SpaceX but is now vacant. The team also inspected POMC's dock space. No regulated activities were observed, and no areas of concern were identified during a walkthrough of the warehouse space and designated dock area.
SECTION III - RECORDS REVIEW Not applicable SECTION IV - AREAS OF CONCERN Not applicable
SECTION V - FOLLOW UP
Not applicable
Page 3 of 3