Document aB8YmpbNyQynOwQzd6a4yDJzY

; .; 4 . / ' .. SOP-EDO - OHC - VC^-JLT/STG WRITTEN BY:RLD DATE:2/23/90 APPROVED BY: DKP DATE: 10/15/91 . 5 COMJIDCNTIALt Subject to Protective order f 14th Judicial District Court RED TELEPHONE OPERATING PROCEDURE Red Telephones are located in all major control rooms and shift supervision offices. This system is a means hy which operating areas can exchange information concerning emergencies and operating changes on a group basis. The Lake Charles Complex is divided into four (4) alerting groups. Some locations are included in more than one group. The Groups and their Master Numbers are as follows: Group 0 Master Number 3100 A11 Locations Group 1 Master # 3101 Group 2 Master 3102 Liquefaction Cell Bridge "A" Caustic "A" PH "A" Switchboard PH "A" Boiler Board Riverside Powerhouse "C" Shift Supervisor "A" Shift Superintendent Mercury Cell Power Shift Supervisor North Liquefaction SL 003543 EDC Per-Tri EC-HCL Shift Supervisor "B" Liquefaction Cell Bridge "A" Shift Superintendent Waste Treatment PH "A" Switchboard PH "A" Boiler Board Riverside Powerhouse "C" Silica Furnace Triethane II Power Shift Supervisor Silica Dryer North Liquefaction VCM II ;. o ** > X, tc Vt *** Group 3 Master 3103 Chlorine "C" Caustic "C" * *a-. Ci * i cn X o Powerhouse "C" PH "A" Switchboard f * PH "A" Boiler Board V r: Riverside ^ - EDC W Liquefaction Shift Supervisor "C" Shift Superintendent Silica Furnace Power Shift Supervisor Silica Dryer North Liquefaction The Red Telephone System includes the following at each location: 1. A Red Telephone with two telephone lines (a private line and an alerting line). 2. A white exclusion key on the Red Telephone switch hook. 3. A push to talk button on the Red Telephone hand set. 4. Loud speakers and/or head sets. A Group Alerting call is made as follows. The originator goes to the Red Telephone and picks up the hand set (no dial tone is present). He should lift the white exclusion key on the switch hook (dial tone is . < s i' * a * >. . n ift-tffrilMEitfiALf Subject, L<. f-'rotsor.Ave ordet t 14th JutUcial District Couc'%. wo.. n-im RED TELEPHONE OPERATING PROCEDURE Red Telephones are located in all major control rooms and shift supervision offices. This system is a means by which operating areas can exchange information concerning emergencies and operating changes on a group basis. The Lake Charles Complex is divided into four (4) alerting groups. Some locations are included in more than one group. The Groups and their Master Numbers are as follows: Group 0 Master Number 3100 AH Locations Group 1 Master Number: 3101 Group 2 Master Number: 3102 Group 3 Master Number: 3103 Liquefaction Cell Bridge 'A' Caustic 'A* -PH 'A' Switchboard PH' 'A' Boiler Board Riverside Powerhouse 'C* Shift Supervisor 'A' Shift Superintendent Mercury Cell Power Shift Supervisor ^ofth Liquefaction EDC Per-Tri EC-VC-HC1 Shift Supervisor 'B' Liquefaction Cell Bridge 'A* Shift Superintendent OHC PH 'A' Switchboard PH /A' Boiler Board Riverside Powerhouse 'C' Silica Furnace Triethane II - OHC II Power Shift Supervisor Silica Dryer North Liquefaction VC II Chlorine Control Room 'C' Caustic Control Room 'C' Powerhouse 'C' PH 'A' Switchboard PH 'A' Boiler Board Riverside. EDC Liquefaction Shift Supervisor 'C' Shift Superintendent Silica Furnace Power Shift Supervisor Silica Dryer - North Liquefaction SL 003544 The Red Telephone System includes the following at each location: 1. A Red Telephone with two telephone lines (a private line and an alerting line). 2. A white exclusion key on the Red Telephone switch hook. 3. A push to talk button on the Red .Telephone hand set. 4. Loud speakers and/or head sets. A Group Alerting call is made as follows. The originator goes to the red telephone and picks up the hand set. (No dial tone is present.) He should lift the white exclusion key on the switch hook (dial tone is now present). He dials the alert code for the desired group (say 3103 for Group 3). The Group Alert is now activated. Automatic cut-thru at other stations in the group will engage the load speakers. The originator can immediately begin to describe the alert and be heard at the various stations over the loud speakers. The alerted station users can reply only by using the push-to-talk on their hand set. Note: he white exclusion key DOES NOT have to be lifted at the alerted stations. The originator jilone must do this. Care must be exercised by the originator. however;*n6t to depress*.the white exclusion key (manually or by hanging up the hand set) as this wi'lV terminate the alert. Station to station calls (within the Red Phone System using the private line) can be made without blocking the alerting paths. The originator uses the same method described above in making a Group Ale'rt, except a station number is dialed instead of an alert. Automatic cut-thru does not occur at the receiving station. The red phone will continue to ring until the receiving station picks up the hand set'and lifts' the white exclusion key. The push-to-talk feature is still required. Should an alert occur while two parties are using the private line, they should immediately hang up and listen for the alert message. The red phones are tied to an "Emergency Power" source in each control room. Loss of this power source will not prohibit'the receiving of an alert but will prohibit the initiating of an alert. A receiving station will hear the phone ring once and will have to pick up the hand set to communicate as automatic cut-thru to the loud speakers will not occur. The station (private line) numbers are as follows: Liquefaction Cell Bridge 'A' Caustic 'A' PH 'A' Switchboard PH 'A' Boiler Board Riverside Powerhouse 'C' Shift Supervisor 'A* Shift Superintendent Mercury Cell. EDC Per-Tri 3110 3111 3112 3113 3114 3115 3132 3116 3117 3118 3120 3121 EC-VC-HC1 Shift Supervisor 'B* OHC Silica Furnace Cl Control Room 'C* Caustic Control Room 'C* Shift Supervisor 'C' Triethane II - OHC II'.Power Shift Supervisor Silica Pigments Dryer North Liquefaction VC II 3122 3123 3124 3134 3130 3131 3133 3125 3135 3126 3127 3128 BHM/hl SL 003545 SOP-EDC-OHC-L/T STG WRITTEN BY: JAM DATE: 4/25/88 APPROVED BY: DKP DATE: 01/13/92 CHECK I ACTION,STEPS (Capital 1etters) and Comments (Small letters; 1. IN THE EVENT OF AN EMERGENCY IN ANOTHER UNIT WITHIN THE LAKE CHARLES COMPLEX: A. Emergencies are described as: a. Fire, Explosion, Vapor release B. Try to keep the VCM II unit operating unless loss of feeds, air, steam, power, etc. dictate otherwise, a. It takes less effort and manpower to keep the plant operating than it does to shut down. 2. OPERATORS SHOULD REMAIN AT THEIR JOBS UNLESS REQUESTED BY SHIFT SUPERVISION OR THE DISASTER COORDINATOR TO AID IN THE EMERGENCY, OR UNLESS THE EMERGENCY REQUIRES A TOTAL PLANT EVACUATION., 3. ISOLATE ANY LINES GOING TO OR FROM THE AFFECTED UNIT AS NECESSARY. 4. FOR A MAJOR GAS RELEASE IN ANOTHER UNIT, UNLESS THE PROBLEi^ IS VERY SEVERE, EVACUATION OF THE VCM II PLANT SHOULD NOT BE NECESSARY. 5. SHUT DOWN THE CONTROL ROOM AIR INTAKE AND USE THE EMERGENCY BREATHING AIR SYSTEM. 6. IF EVACUATION IS REQUIRED, FOLLOW THOSE STEPS (AS APPLICABLE) AS GIVEN IN THE PROCEDURE FOR MAJOR BREAK, GAT LEAK, OR EXPLOSION. 7. MAKE A HEAD COUNT. SL 003546 CONFIDENTIAL: nubiect to Protective Order ct Court * Mtb 4* SOP-EDC-OHC-L/T STG WRITTEN BY: JAM DATE: 4/25/88 APPROVED BY: DKP DATE: 01/13/92 CHECK ACTION-STEPS (Capital letters) and Comments (Small letters IN THE EVENT OF A FIRE, THE SIZE OF THE FIRE WILL HAVE A CONSIDERABLE EFFECT ON THE ACTION TO BE TAKEN. IN ANY FIRE SITUATION, NOTIFY THE FIRE CHIEF. THE KEY TO MINIMIZING FIRE LOSSES IS TO REACT QUICKLY. 1. SMALL FIRES A. Trash, oil, motor, electrical, or pump seal fires should be extinguished immediately. Notify the Guard office or shift safety coordinator that a fire occurred. 2. LARGE FIRES In general, larger fires should be cooled down with water and allowed to burn out by consuming all available fuel. If the fire is put out prior to isolating the fuel source, the flammable vapors could spread and re-ignite, causing further damage and possibly injury to personnel. _ A. Activate the VCM II evacuation alarm. _ B. Set off the appropriate sprinkler system if it hasn't already tripped. _ C. Turn on monitor nozzles as necessary to cool structures and adjacent equipment. _ D. Report the fire to the guards. _ E. Account for all unit personnel. _ F. Alert other units via the red phone. ,, G. Put on scott air packs or emergency escape masks. _ H. Isolate the equipment or section of the plant. __ I. Secure and control the plant. J. The lead operators should be responsible to make contact with the emergency squad, direct them to the fire, and apprise them of the general situation. SL 003547 CONFIDENTIAL: Subject Protective Order of I4fch Judicial District, c&utt. No* 5601-032.SOP 3. VERY LARGE FIRES A. .Shut down the cracking furnaces, the LP-EDC reactor, an the OHC reactors and the incinerator. B. Block critical .isolation valves and steam into the C. Once steam has been blocked, shut down as many air-cooled exchanger fans as possible. a. It may be necessary to shut down power to the plant to accomplish this. b. Insure that power is not required for other reasons before tripping it off E. The lead operators should be responsible to make contact with the emergency squad, direct them to the fire, and apprise them of the general situation. F. Lead operator should also make a head count. SL 003548 COttT r.rd-r' t to V'^,r;V ;r. rt Con ' , .; *. 1 Dvv.t-. Of l*-" SOF-EDC-OHC-L/T STG WRITTEN BY: JAM DATE: 4/25/88 APPROVED BY: DKP DATE: 01/13/92 K,,. . L'Oi-TlAl., Subject t:._> Protect! 1 1,1 Judicil Matriut Court n: CHECK i ACTION STEPS (Capital letters) and Comments (Small letters; MAKE IMMEDIATE ASSESSMENT OF THE SITUATION. 1. ELIMINATE OR SHUT DOWN ANY POSSIBLE IGNITION SOURCE. A. This may require evacuation of maintenance personnel road way lights to be turned on. Turn on unit siren. B. Check wind direction for possible shut-down of open flame sources, such as crackers, dowtherm furnace, and/or incinerator. a. If cracking furnaces are shut down this may require one or both OHC reactors to shut down. b. Notify other operations control rooms via red phone if unit shut down is required. C. Check ignition source permits and insure that all weld...; machines, air compressors, vehicles, and other poss^bllgnition sources are shut down as necessary. 2. ACTIVATE DELUGE IF NECESSARY. A. Notify guards of fire water use. 3. SHUT DOWN CONTROL ROOM AIR BLOWER IF NECESSARY CD 4. BYPASS AND ISOLATE THE LEAK SOURCE. Lr> CO o A. Put on appropriate respiratory equipment. o B. If equipment can be bypassed take it out of service. C. If equipment isolation requires shut down, follow SO? for shutting down that section. *; "E7 ^ 4-J < x. tn G -u O n r- ~I1 .'1 O o 4: .c Xi w 5. CONTAIN THE SPILL / A. Build a dike around spill or divert it to process sewed?. B. Block the ditch isolation valve SW of the furnaces ;i-f" necessary. 6. NOTIFY SHIFT SUPERINTENDENT AS SOON AS POSSIBLE A. Give superintendent all pertinent information such as ** leak, location, size of spill, type of material spilie.., and ..time, of spill so that he can report the spill in '.-.proper ah'd- timely fashion as required by the DEQ anu t..^ ^ i <EPAj ' Leaks greater than RQ amounts must be reported ... t?ie DEQ within 15 minutes. SOP-EDC-OHC-L/T -SUC. Aa WRITTEN BY: JAM/CF DATE: 4/25/88 APPROVED BY: DKP DATE: 01/13/92 CHECK ACTION STEPS (Capital letters) and Comments (Small letters) 1. ACTIVATE THE VCM II PLANT EVACUATION ALARM. A. This automatically activates the roadway lights. 2. SHUT OFF THE CONTROL ROOM AIR INTAKE. 3. SHUT DOWN THE CRACKING FURNACES, DOWTHERM HEATER, AND INCINERATOR AS WIND DIRECTION AND VELOCITY DICTATE TO PREVENT THEM FROM BEING AN IGNITION SOURCE. 4. TRIP APPROPRIATE SPRINKLER SYSTEM IF NOT ALREADY TRIPPED. A. Do not trip more systems than are necessary. The fire water system can, support' only a limited number of deluge systems simultaneously at design capacities. 5. USE RED PHONE TO NOTIFY OTHER UNITS, GUARDS, AND SHIFT SUPERVISION OF EMERGENCY SITUATION. A. Request fire or first aid assistance as needed (2700;. Wi U3 4> O c O o 61 -- >n < ii v> '* E[[J ^ H> O U (C S' a. cu u T, O u 0-4 3 *J '3 X0 V fo-l+aJ A 3 -t W 0 6. THE LEAD OPERATORS COUNT". 7 . PUT ON APPROPRIATE 8 . SECURE, STABILIZE, PLANT IF POSSIBLE. A. An evaluation should be made with supervision about corrective action to be taken. B. Isolation valves to be considered are: chlorine, , ethylene, oxygen, methane, EDC, HCL, and VCM transf-ei lines. . . ,7 C. Other lines that should be considered are air, nitrogen and water to avoid bleeding down these utilities, arid affecting other units. ~ D. Shutting down electrical power to the plant can reduce the amount of flammables being pumped out through "damag or ruptured lines. ) SL 003550 5.- Ensure that power is not needed for other reasons, such as pumping flammables out of the area, before shutting ^ down. 'u 9. TRIP THE OHC AND LP-EDC SHUT-DOWN SYSTEMS (IF THEY ARE VI" ALREADY DOWN). 10. BLOCK STEAM TO THE PLANT TO REDUCE FLAMMABLE VAPOR GENERATION. 11. "the LEAD OPERATOR SHOULD BE RESPONSIBLE TO MAKE CONTACT WICE THE EMERGENCY SQUAD, DIRECT THEM TO THE AFFECTED AREA, END APPRISE THEM OF' THE GENERAL 3ITUATION. 12. LEAVE THE AREA ONLY AS A LAST RESORT. 13. USE STANDARD EPA/DEQ REPORTING PROCEDURES . Tn = superintendent must report amounts exceeding the RQ to thDEQ within 15 minutes. SL 003551 i CONFIDENTIAL: Subject to Protective order of 14th Judicial District Cou No. 91-1145 SOP-EDC-OHC-L/T STG WRITTEN BY: JAM DATE: 4/25/88 APPROVED BY: DKP DATE: 01/13/92 CHECK ACTION STEPS.(Capital letters) and Comments (Small letters) 1. IN THE EVENT OF A MAJOR CATASTROPHE, SELF-PROTECTION AND PROTECTION OF YOUR CO-WORKERS SHOULD BE YOUR PRIMARY CONSIDERATON. 2. IGNITION SOURCES SHOULD BE ELIMINATED. A. Shut down units as necessary 3. THE EVACUATION ALARM, RED PHONE AND ROADWAY STROBE LIGHTS SHOULD BE USED AS NECESSARY TO WARN OTHERS OF THE SITUATION. CALL 2700 TO REPORT THE EMERGENCY AND MOBILIZE THE EMERGENCY SQUAD. 4. LEAD OPERATORS-. ARE RESPONSIBLE" TO "GET A ''HEAD COUNT" . ' 5. THE APPROPRIATE DELUGE SYSTEMS SHOULD BE ACTIVATED. PUTTING ON UNNECESSARY SYSTEMS LOWERS AVAILABLE FIREWATER PRESSURE-- 6. CONTROL ROOM OUTSIDE AIR BLOWER SHOULD BE SHUT DOWN. 7. APPROPRIATE RESPIRATORY PROTECTION SHOULD BE PUT ON. 8. SECURE THE PLANT TO MINIMIZE THE HAZARD POTENTIAL. 9. LEAVE THE CONTROL ROOM BUILDING ONLY AS A LAST RESORT. A. The control building is designed to be explosionresistant, and is equipped with an emergency breathing air system. 10. RESPONSE TO AN EMERGENCY IN THE PLANT SHOULD BE LIMITED TO THE OPERATOR(S) FOR THAT AREA AND THE LEAD OPERATOR AND/OR THE AUXILIARY OPERATOR, IF NECESSARY. A. If everyone left the control room to respond to the situation, or just out of curiousity, and were overcome by fumes, for example, there would be no one left to respond to alarms and secure the plant from the control room. 11 RELAY WHATEVER INFORMATION CONCERNING ENVIRONMENTAL IMPACT THAT IS AVAILABLE,TO THE SHIFT SUPERINTENDENT ASAP. RQ releases must be reported to the DEQ within 15 minutes. SL 003552 COHrlRF.MTlM.1 Bt to protective OfrtM WRITTEN BY: JAM APPROVED BY: MJF DATE: 7/92 5601-049.SOP LOSS OF WELL WATER CHECK ACTION STEPS lCapital letters) and Comments (Small letterss SHOULD IT BECOME NECESSARY TO SHUTDOWN THE WELL WATER SYSTEM IN VCM-II. TAKE THE FOLLOWING ACTION. __ 1. ISOLATE WELL WATER HEADER AT THE WEST BATTERY LIMITS. ___ 2. OPEN WELL WATER TO SABINE WATER CROSSOVER VALVE IN PIPE RACK NORTH OF THE INCINERATOR. SL 003553 *v p *:* ' -* / i -Mi#! * .i !:/ i. f - E U b j fr Of 14 tb Cukf.i d> At . brutcvt i vt; Ord*r J in i i ci o J Mi k t r : c t: < do. CHECK ACTION STEPS (Capital letters) and Comments (Small letters) ASSUMING LOSS WITH TIME TO REACT. 1. SWITCH OVER FROM INSTRUMENT AIR TO NITROGEN (SEE SOP 5601- 001.SOP). ASSUMING LOSS WITH NO TIME TO REACT OR A RUPTURED AIR HEADER 1. MAINTAIN ADEQUATE NITROGEN FLUIDIZATION TO THE REACTORS. A. Reactors will shut down as control valves move to "fail safe" position as air pressure decreases. 2. LEAVE COOLING TOWER PUMPS AND FANS ON UNTIL PLANT IS SECURED.. 3. BLOCK STEAM TO USERS. 4. PLACE CONTROLLERS ON MANUAL AND CLOSE AS NEEDED, CLOSE BL VALVES. 5. SHUT DOWN AND BLOCK PUMPS AS NEEDED. .6 SWITCH DH STILL PRODUCTION INTO DH FEED TANK. 7. FOLLOW INDIVIDUAL SYSTEM SHUT-DOWN AND PURGE PROCEDURES. 8. BLOCK ANY REWORK GOING TO THE INTERMEDIATE CRUDE DRUM. N- SL 003554 pErn'i iM-* !> r u t e ' t : SOF-EDC-OHC WRITTEN BY:RLD DATE;3/2/90 APPROVED BY:DKP DATE:07/29/92 OPERATOR'S NAME: DATE CHECK ACTION STEPS (Capital letters) and Comments (Small letters) SL 003555 Iz has been assumed that the failure of the Cell liquor to "B" line will not be a complete rupture. This means that flow still exists in the header to Plant "B", but the failure is such that the line needs to be taken out of service as soon as possible. Everybody concerned needs to realize that the normal operating strength of Waste Caustic is 90-100 GPL. In order to supply all the users, in Plant "B", with Waste Caustic instead of Cell Liquor, the Waste Caustic strength will have to be raised to 150 GPL (minimum). The basic warning is that if all the Plant "B" users switch to Waste Caustic without allowing Caustic "A" to get the strength up, it is a good chance that everybody in Plant "B" will shut down because the capacity of the supply system is such that all users cannot be supplied adequately at the lower strength. VALVE DESIGNATIONS VALVE 1 - connects the VCM II Cell Liquor line to the Waste Caustic Header VALVE 2 - block valve on the VCM II Cell Liquor line at the Cell Liquor Header VALVE 3 & 4-block valves on the jumper line between the VCM II and TRI II Cell Liquor branch lines of the header VALVE 5 VALVE 6 VALVE 7 VALVE S VALVE 9 block valve on the TRI II Cell Liquor line at the Cell. Liquor Header. r; connects the VDCM Cell Liquor line to the Waste Caustic ;: Header. block valve on the VDCM Cell Liquor line at the Cell-. Liquor Header. 2" valve for blowing out the Cell Liquor Header. block valve on WTU Cell Liquor line at the Cell Liquor. Header SHE ATTACHED DRAWING FOR VALVE LOCATIONS 1. JOB SAFETY INSTRUCTIONS REVIEWED. Of 14th Judicial District No. 91-1145 2. INSURE THAT YOU ARE WEARING PROPER SAFETY EQUIPMENT: HARD HAT., SAFETY GLASSES OR GOGGLES, SAFETY SHOES, ESCAPE RESPIRATOR. * 3. THE SHIFT SUPERINTENDENT WILL COORDINATE ALL ACTIVITIES. HE "SHOULD FIRST NOTIFY CAUSTIC "A" LEAD OPERATOR (2558) TO PREPARE TO TAKE THE CELL LIQUOR TO "B" HEADER OUT OF SERVICE. HE SHOULD THEN NOTIFY VCM-II LEAD OPERATOR (2770) TO GET OFF CELL LIQUOR AND START USING WASTE CAUSTIC. THE VCM-II LEAD OPERATOR SHOULD CONTACT THE WTU LEAD OPERATOR (2677) AND GET HIM TO OPEN VALVE 1. THE WTU LEAD OPERATOR SHOULD NOTIFY THE VCM-II LEAD OPERATOR WHEN VALVE 1 IS OPEN. THE VCM-II LEAD OPERATOR SHOULD THEN NOTIFY THE TRI-II LEAD OPERATOR (2646) TO CLOSE AND TAG VALVE 2^ ONCE VALVE 2 IS CLOSED THE TRI-II LEAD OPERATOR SHOULD NOTIFY THE VCM-II LEAD OPERATOR THAT VCM-II IS NOW ON WASTE CAUSTIC. 4. CAUSTIC "A" SHOULD DO EVERYTHING NECESSARY TO START GETTING TKS. 15. & 17- STRENGTH UP TO 150 GPL (MINIMUM). AS LONG AS THE CELL LIQUOR TO "B" LONE IS OUT OF SERVICE, CAUSTIC "A" SHOULD KEEP THE WASTE CAUSTIC STRENGTH BETWEEN 150-175 GPL. TO GET TKS. UP TO STRENGTH, CAUSTIC "A" SHOULD: A. Remove all weak streams from 15 & 17 and put to the cel 1 liquor tks.. B. Leave only streams above 140 gpl in 15 & 17 and start dumping 50% caustic from filters into 15 & 17. C. Start sampling Waste Caustic every 30 minutes. Once the Waste Caustic strength gets above 150 gpl, the operator can go back to sampling every 2 hours. 5. CAUSTIC "A" WILL NOTIFY THE TRI-II LEAD OPERATOR (2646) AS SOON AS THE WASTE CAUSTIC' STRENGTH IS ABOVE 120 GPL'. TRI-II SHOULD GET OFF CELL LIQUOR AND GET ON WASTE CAUSTIC. OPEN VALVE 3 AND VALVE 4 THEN CLOSE AND TAG VALVE 5^_ S u b je c t to P ru t* a tlv # OiffjUr _____ ji ** 6. TRI-II OPERATIONS SHOULD SAMPLE THEIR CAUSTIC STORAGE TANK EVERY HOUR UNTIL THE WASTE CAUSTIC FEED CONCENTRATION COMING TO THE UNIT HAS BEEN STABILIZED. CAUSTIC "A" CAN BE CONTACTED (2558) PERIODICALLY TO SEE WHAT THE WASTE CAUSTIC FEED CONCENTRATION IS AND YOU MAY ALSO REQUEST NOTIFICATION OF ANY DRASTIC CONCENTRATION CHANGES. COW PIDKM'flALi A. It will be important to closely monitor tank levels, a* ** flows, and pH's in the cell liquor and caustic systems I in the unit. The waste caustic strength will vary, at least for a while, and care must be taken to keep the caustic strong enough to destroy all the chloral in the system and keep the pH up high enough in the steel ts 3 (O LO lines to protect them from excessive corrosion, while LO also keeping the concentration low enough to avoid CO inverting the aqueous and organic phases in th O Chloral Treatment Phase Separator (C.T. P/S). Keep tfte. strength of the caustic going to the C.T. P/S 'ieiow 8%. If the waste caustic is not strong enough CO '' to" allow the unit to operate normally, notify the Shift Supervisor and ask him to have Caustic "A" increase the strength of the waste caustic. - 7. CAUSTIC "A" WILL NOTIFY THE VDCM LEAD OPERATOR AS SOON AS THE WASTE CAUSTIC STRENGTH IS ABOVE 140 GPL. VDCM SHOULD GET OFF CELL LIQUOR AND GET ON WASTE CAUSTIC. OPEN VALVE 6 THEN CLOSE AND TAG VALVE 7. 8.-AS SOON AS VDCM HAS SWITCHED OVER, THE VDCM LEAD OPERATOR SHOULD NOTIFY THE PLANT "B" SHIFT SUPERVISOR THAT ALL USERS ARE OFF OP CELL LIQUOR. A. It should be noted that VDCM has the ability to swing their rate at will, so if the waste caustic supply is not sufficient, VDCM can cut load or temporarily come down until Caustic "A" can get the strength up high enough to supply all users. 9. THE PLANT "B" SHIFT SUPERVISOR SHOULD CHECK VALVES 2. 5. 7, AND 9 TO MAKE SURE THEY ARE CLOSED AND TAGGED. A. This is critical because if the Cell Liquor header is not isolated. Weak Caustic will be pumped back into the Cell Liquor header. 10. ONCE THE "B" SHIFT SUPERVISOR HAS MADE SURE THE VALVES ARE CLOSED AND TAGGED, HE SHOULD NOTIFY THE SHIFT SUPERINTENDENT THAT ALL USERS ARE OFF CELL LIQUOR. THE SHIFT SUPERINTENDENT SHOULD THEN TELL CAUSTIC "A" TO SHUT DOWN THE CELL LIQUOR TO "B" PUMPS. 11. THE SHIFT SUPERINTENDENT SHOULD THE GET A 100 PSI, 600 CFM (MINIMUM) PORTABLE AIR COMPRESSOR AND HAVE IT HOOKED ON VALVE 8. 12. AFTER COMPRESSOR IS HOOKED UP, THE SHIFT SUPERINTENDENT SHOULD THEN GET THE PLANT "A" AND "B" SHIFT SUPERVISORS TO COORDINATE BLOWING THE CELL LIQUOR TO "B" HEADER OUT (BACK INTO CELL LIQUOR TANK 6). AFTER BLOWING THE HEADER OUT, BLEED REMAINING AIR PRESSURE OFF THE HEADER. THEN TAG AND MAINTENANCE WORK CAN PROCEED. 'i- T, *' > % CON'F I DF.CTI M, r f.u b j ft c U to Ft:ot c:t iv , O: F : of l<tb Judicial !)ii:tr;Cw.,srt No. vl-.11 is ATTACHMENT PAGE 4 OF 4 OPERATOR'S. NAME: ______ DATE CHECK i\ ACTION- STEPS (Capital letters) and Comments (Smalt letter>) /. JOB SAFETY INSTRUCTIONS REVIEWED. 2. INSURE THAT YOU ARE WEARING PROPER SAFETY EQUIPMENT: SAEFTY GLASSES OR GOGGLES. HARD HAT. HEARING PROTECTION. AND STEP!TOE SHOES. A. ACTIVATE THE VCM II SIREN Leave the siren on Tor 5 minutes to set Construction arm Maintenance personnel out of the area. After the air system is stable and you advise Construction/Maintenance of the situation, they can return to work. No work inside vessels, furnace flame management control houses, or analyzer sheds will be allowed while ive are on nitrogen. Avoid, use. of plant air or nitrogen during. Ail-. t ime. B. DOUBLE BLOCK AND BLEED THE AIR HEADER FROM PLANT "B" At Tr.R THE NITROGEN IS PUT IN. C. LOCK AND TAG OUT THE DOORS TO ANALYZER SHEDS AND Ft. AYE MANAGEMENT CONTROL HOUSES TO PREVENT ENTRY. All vessel entry permits are void while on nitroeen. D. CHECK THE AREA FOR PERSONNEL IN VESSELS. CONFINED AREAS f<'> ENSURE THAT NO ONE IS POSSIBLY TRAPPED IN DANGER OF ASPHYXIATION. E. STAY ON NITROGEN ONLY AS LONG AS NECESSARY. F. VESSELS, ANALYZER SHEDS. FLAME MANAGEMENT CONTROL HOUSES MUST BE CHECKED FOR OXYGEN CONTENT PRIOR TO REMOVAL OF I \`N OR RENEWAL OF VESSEL ENTRY PERMITS. G. INFORM ALL PERSONNEL IN THE AREA WHEN WE ARE OFF NITROlN' . H. DOUBLE BLOCK AND BLEED THE NITROGEN HEADER. ?* SL 003559 CCHFIDKMTIAL: Subject to protective Orft^r of 14th Judicial District Court Mo. 51-1145 SOP-LOt'-OHC-'VC-I./T WRITTEN BY: JAM APPROVED BY: MJF DATE: 05/05/92 A. ISOLATION VALVES FOR THE LINES LISTED BEIOW ARE NOT ALWAYS PRESET! AT BATTERY LIMITS. YOU MAY HAVE TO TRACE THE LINE INTO THE UNIT >>R BACK IhWN THE PIPERACK TO LOCATE THE NEAREST VALVE. B. LINES LOCATED AT THE EAST BATTERY !. EMITS. NORTH TO SOUTH. ARE: LOWER PIPEpACK /. 6 '' VCM to/from docks J 4 EEC from B-! S. 2" Hvys still bottoms to UTU 9. J" chlorine sniff header J 3 " cell liquor 10 2" secondary scrubber H20 to WTU 4. 6 " ethylene *\ " abandon format e hdr 1 S" atmospheric scrubber H20 to WT< 12 S" primary scrubber H20 to WTU 6. 6 " oxygen 13 S" vents to WTU 3 " li e t EDC f rm s h i pp i ng UPPER PIPERACK I 4. 12" sab i ne wd ter 15. 2" lights line to WTU 16. 6" ethylene from docks I~. 6" low pressure nitrogen IS. 2" high pressure nitrogen 19. 4" liquid chlorine 20. 5" formate transfer header (from SSPS to WTU) 21. 2" EDC ime to/from TE-II (to tank farm or LS reboilers/ 22. 2" l'CM transfer header from TE-II C. LINES LOCATED IN THE WEST BATTERY LIMITS PIPERACK JUST WEST OF =4 INCINERATOR (NORTH TO SOUTH) ARE: These lines are at head l e. it-/. / . I ~5J steam > _ t->" condensate header J . J" HCL header to the HCL absorbers 4. S" HCL header to plant B 5. 6" VCM product transfer header 6 . 3" VC sphere vents 6" VCM alternate transfer header S. 2" orange ethylene line from Westlake Polymers 9. 6" well water 10. 4" instrument air II . 3" sanitary sewer 12. l 1/2" nitrogen IJ. chlorine to Kronos (insulated) 14 . chlorine sn i f f ineader THE NATURAL GAS SUPPLY HEADER ISOLATION VALVE IS LOCATED SOUTH Oi THE VCFURNACES. SL 003560 DUtriefc couvt