Document aB266eavoG3k59KQ4DpBYgq1Y

INTERNAL CORREQPONDENCt UNION CARBIDE CORPORATION wo-u v ' i: < `i~' '< R. W. Gilbert 2002-1 512 B. H. Avashia, M.D. W. L. Browning C. P. Maxwell B. R. McMakin C. W. Ware October 7, 1986 HS&EA ..... Industrial Hygiene Asbestos Exposure Monitorinq - Construction Storeroom Attached are the results of the Asbestos'monitoring performed in the Construction Storeroom, Building 2002, at Institute on August 19 and 26, 1986. The initial monitoring was done on August 19, 1986 and the follow-up on August 26, 1986. R. W. Cutlip and M. V. Burdette were monitored while dispensing asbestos gaskets to be used in field applications. R. W. Cutlip and M. V. Burdette were equipped with Half-face respirators containing HEPA filters while pulling gaskets. This would indicate that their actual inhalation exposures were lower than the reported concentrations. The exposure monitoring that was performed on August 19, 1986 on R. W. Cutlip indicated levels that would be considered high if this many gaskets (80-100 per hour) were dispensed over several hours. A Time Weighted Average was not determined because R. W. Cutlip was involved with dusting and cleaning out bins the remainder of the day, which could have caused exposure. The samples collected on August 26, 1986 on M. V. Burdette as a follow-up for long term sampling, show that the air concentration of Asbestos was below the 0.1 fiber/cc action level, but also note that she only pulled 14 gaskets. It is recommended that the gasket bins be cleaned once a month with a vacuum cleaner equipped with a HEPA filter and that the gaskets be vacuum cleaned before placing in the bins. This would considerably eliminate exposure potential to asbestos fibers. When the job is expected to last for several hours the employee must wear recommended protective equipment for asbestos and take a shower at the end of the day. We also recommend that the asbestos gasket pulling job should be assigned to only those personnel who have been trained, in the OSHA asbestos standard, and know the hazards of the material. UCC 024461 Asbestos Monitoring - continued 2- - October 7, 1986 Please notify R. W. Cutlip and M. V. Burdette of their monitoring results as soon as possible. Please have them sign and date this report and return to M. A. Patel at Building 701-330. If we can be of further assistance, please call us on extension 4779 or 3750. WORK BY: APPROVED BY: U..,, dk-- Vance E. Stover Attachment VES:MAP:rab 1 777P i P-u Manhar A. Patel UCC 024462 ASBESTOS EXPOSURE MONITORING Comp. ref. W2010 W2019 Date 8-19-86 8-19-86 8-19-86 8-26-86 8-26-86 8-26-86 Sdrple Type/ Eirployee Name Personal/ R. W. Cutlip Area Sanpling Time 29 mins. 5 hrs 3 min. Area 5 hrs 8 min. Personal/ M. V. Burdette 7 hrs 11 min. Area 7 hrs 12 rm'n. Area 7 hrs 11 nrin. Air Cone, fibers/cc 0.76 0.013 0.011 0.045 0.015 0.023 TWAg fibers/cc - 0.040 - COMMENTS Collected while pulling 40-50 gaskets frem bins for dispensing to job site. Collected on the right - on the shelf opposite gasket bins - near aisleway. Collected on the left - on the shelf opposite gasket bins. Gollected while pulling 14 gaskets from bins for dispensing to the job site. Collected in the center of the shelves directly across from the gasket bins. Collected on the right - in shelves opposite gasket bins. ASBESTOS Permissible Exposure Level TO\ 0.2 fibers/cc OSW 1777P UCC 024463