Document a4yxY4VqnMZn7EKDq3xEjYb19

EPA Inspection Report - Page 1 of 38 Region 6 - Enforcement & Compliance Assurance Division INSPECTION REPORT Inspection Date(s): Media Program: Regulatory Program(s) Company Name: Facility Name: Facility Physical Location: (city, state, zip code) Mailing address: (city, state, zip code) County/Parish: Facility Phone Number Facility Contact: 05/17/2023 Air Title V, NESHAP El Paso Natural Gas Company, LLC Laguna Compressor Station 6 miles E of NW Laguna New Laguna, NM 87038 7445 Pan American Fwy, Ste 202, Albuquerque, NM 87109 Cibola County (505) 552-6149 Richard Duarte Senior EHS Engineer Ricardo_Duarte@kindermorgan.com FRS Number: Identification/Permit Number: Media Identifier Number: NAICS: SIC: 110022761288 R6FOP-NM-02-R2-2020 EIS 7566311 221210 4922 Personnel participating in inspection: Prince Nfodzo EPA R6 ECDAP Bailey Brown EPA R6 ECDAP Uma Lad EPA R6 ECDAP Ricardo Duarte Kinder Morgan/EPNG Adrian Chavez Kinder Morgan Greg Jojola1 POL ENRD2 Henai Lucario1 POL ENRD Amy Garcia1 POL ENRD Environmental Engineer Physical Scientist Physical Scientist Senior EHS Engineer Operation Specialist Environmental Manager Environmental Technician Environmental Specialist EPA Lead Inspector Signature/Date Supervisor Signature/Date Digitally signed by PRINCE PRINCE NFODZO NFODZO Date: 2023.06.16 07:30:26 -05'00' Prince Nfodzo Digitally signed by DARRIN DARRIN LARSON LARSON Date: 2023.06.16 08:39:08 -05'00' Darrin Larson Date Date 1 Left after the Opening Conference and facility walk-through. 2 Pueblo of Laguna, Environmental and Natural Resources Department 6ENFORM-019-R8.2 (02/12/2020) 1 EPA Inspection Report - Page 2 of 38 Section I - INTRODUCTION El Paso Natural Gas Company, LLC / Laguna Compressor Station 05/17/2023 PURPOSE OF THE INSPECTION EPA Region 6 inspectors Prince Nfodzo, Bailey Brown, and Uma Lad, along with Greg Jojola, Amy Garcia, and Henai Lucario from the Pueblo of Laguna Environmental and Natural Resources Department, arrived at the El Paso Natural Gas Company, LLC's ("EPNG") Laguna Compressor Station ("LCS") at 8:30 am on May 17, 2023, for an unannounced inspection. The facility is in Indian country and EPA is responsible for direct implementation. The inspection is in line with EPA's periodic evaluation of the facility's compliance with the CAA. The facility was last inspected July 18, 2017. We met with EPNG representatives Ricardo Duarte (Senior EHS Engineer) and Adrian Chavez (Operations Specialist) at the Opening Conference. I, Prince Nfodzo, presented my credentials to Mr. Duarte and informed him that this was an EPA inspection to determine compliance with the facility's Title V Air Permit and the Clean Air Act ("CAA"). The scope of the inspection is a full compliance evaluation (FCE) and includes evaluation of the facility's compliance with its Title V operating permit (R6FOP-NM-02-R2-2020) and applicable regulations under the CAA. Photographs taken during the inspection were shared with EPNG representatives and are included as APPENDIX 1. I discussed CBI claims and informed EPNG representatives to properly identify any CBI information that will be submitted for the inspection. A sign in sheet of personnel attending the opening conference is included as APPENDIX 2. FACILITY DESCRIPTION El Paso Natural Gas Company, LLC - Laguna Compressor Station, located 6 miles E of NW Laguna, is a natural gas compression and transmission station with pressurized natural gas as its principal product. The facility receives natural gas from an EPNG pipeline. The natural gas passes through inlet separators, which may also be referenced as scrubbers, before re-compression. The facility operates three Clark TLA-10, 2stroke lean burn, natural gas compressor engines rated at 3,400-horsepower (hp) installed in 1958, and two auxiliary Ingersoll-Rand PSVG-8, 4-stroke rich burn, natural gas-fired engine driven generators, rated at 544-hp. A detailed process description and flow diagram is included as APPENDIX 3. Section II - OBSERVATIONS On May 17, 2023, EPA Region 6 inspectors conducted surveillance around the facility from 7:25 - 8:15 am prior to making entry. We did not observe any visible emissions and did not observe any hydrocarbon emissions with a Forward Looking Infrared ("FLIR") optical gas imaging (OGI) camera. After the opening conference, we conducted a facility walk-through. We observed a fenced-out area on the property. Mr. Duarte stated that the fenced-out area contains asbestos (see AOC #1). Engines EPNG's permit includes two Ingersoll-Rand, Model PSVG-8, 544 hp, 4-stroke rich burn engines installed in 1958 at the LCS. The engines are identified as AUX-01 and AUX-02, with serial numbers 8CPST227 and 8CPST228, respectively. Photographs of the engines are included as Photo No. 8-10 in APPENDIX 1. The auxiliary engines are subject to the requirements of NESHAP Part 63 Subparts A and ZZZZ. The units are 2 EPA Inspection Report - Page 3 of 38 El Paso Natural Gas Company, LLC / Laguna Compressor Station 05/17/2023 equipped with a non-selective catalytic reduction ("NSCR") system to control carbon monoxide, formaldehyde, and volatile organic compounds. EPNG monitors and maintains electronic records of the temperature of the exhaust gas exiting the catalytic converter, and the pressure drop across the catalyst element to demonstrate continuous compliance with emission limits in accordance with permit condition V.F.3. I reviewed monitoring records for March 1, 2020, through February 28, 2023, and observed that there was no monitoring record for July 2021 through December 2021 (see AOC #2). The facility's permit requires that the amount of natural gas burned in each unit and heat input for each unit shall not exceed 78.1 mmscf/yr and 8.13 MMBtu/hr, respectively. EPNG is required to monitor and/or maintain records of fuel flow, heat input, hours of operation, and repair and maintenance activities. At the time of the inspection, both auxiliary engines were not in use. According to EPNG representatives, the engines have not been operated since 2007 (see AOC #3). Monitoring records from March 1, 2020, through February 28, 2023, show that the auxiliary engines have not been in operation. EPNG operates three Clark TLA-10, 3400 hp, two-stroke lean-burn compressor engines installed in 1958 at the LCS. The compressor engines are identified as A-01, A-02 and A-03 with serial numbers 79007, 79008 and 79005, respectively. Photographs of the compressor engines are included as Photo No. 3 - 7 in APPENDIX 1. The compressor engines are exempt from NESHAP Part 63 Subparts A and ZZZZ requirements under 63.6590(b)(3)(i). At the time of inspection, unit A-02 was out of service and has been down for repairs since March 10, 2023. The facility's permit requires that the amount of natural gas burned in each unit and heat input for each unit shall not exceed 319.5 mmscf/yr and 33.26 MMBtu/hr, respectively. EPNG is required to monitor and maintain records of fuel flow, heat input, hours of operation, and repair and maintenance activities. I reviewed Six-Month Monitoring Reports from March 1, 2020, to February 28, 2023, submitted through EPA's Compliance and Emissions Data Reporting Interface (CEDRI). I observed some deficiencies in the records (see AOC #4). I noted that EPNG may be using incorrect units and/or formula that impact the calculation of natural gas burned in each unit (see AOC #5). I also observed instances of daily unit operation exceeding 24 hours (see AOC #6). Excerpts from the Annual Certification and Six-Month Monitoring report for the period from September 1, 2020, through February 28, 2021, is included as APPENDIX 4. The facility's permit requires that fuel combusted in the engines is limited to pipeline quality natural gas containing no more than 0.25 grains of hydrogen sulfide (H2S) per 100 cubic feet. EPNG monitors the sulfur content of the natural gas supplied to the LCS at another EPNG facility located in Plains, TX. I reviewed H2S monitoring records for April 1, 2023, through May 19, 2023. I noted that the fuel gas H2S concentration was within permitted limits. The H2S monitoring record is included as APPENDIX 5. Inlet Separators/Scrubbers The facility receives natural gas from an EPNG pipeline, and before the natural gas is re-compressed, it first passes through four inlet separators in parallel, which may also be referenced as scrubbers. The 3 EPA Inspection Report - Page 4 of 38 El Paso Natural Gas Company, LLC / Laguna Compressor Station 05/17/2023 primary purpose of the inlet separators is to remove any lubrication oils or impurities entrained in the natural gas stream from the upstream compressor station. The used oil that accumulates within the separator is periodically discharged manually. We observed emissions from Separator #2 with a FLIR camera (see AOC #7) and staining on Separator #3. Photographs of the separators are included as Photo No. 12 and 13 in APPENDIX 1. Tanks EPNG's permit includes several storage tanks that are exempt from federal regulatory requirements. Some of the permit representations do not match actual conditions on site (see AOC #8 and #9). Section III - AREAS OF CONCERN 1. We observed a fenced-out area on the facility during a walk-through. Mr. Duarte stated that the fenced-out area contains asbestos. EPNG should take appropriate action to remove asbestos from the area. 2. EPNG keeps monitoring records for the two auxiliary engines electronically in accordance with permit condition V.H.3. Records for July 2021 through December 2021 are missing. EPNG representative stated that temperature and pressure drop records were lost during a system upgrade from Windows 8 to Windows 10. EPNG should put in place appropriate measures to ensure that records are properly secured. 3. EPNG's current federal operating permit includes two auxiliary engines installed in 1958 that have not been operated since October 9, 2007, when EPNG conducted a required initial performance test. EPNG representatives indicated that the company has no intent to operate the emergency engines in the future. Accordingly, EPNG should consider removing the units and any associated emissions from its permit. 4. EPNG is required to submit Six-Month Monitoring Reports per permit condition V.G.4. The report for September 1, 2020 - February 28, 2021, did not include records for December 2020. EPNG should include all data required in their reports. (see APPENDIX 4) 5. EPNG is permitted to operate the compression engines with up to 319.5 mmscf/yr fuel flow. The Six-Month Monitoring Report for September 1, 2020 - February 28, 2021, shows the 12-month rolling fuel consumption exceeding this limit in November 2020 for Engines A-01 and A-02. It is unclear if an actual permit exceedance occurred, or if EPNG has an error in their calculations. (see APPENDIX 4). 6. The Six-Month Monitoring Reports from September 1, 2020 - February 28, 2021, include multiple instances of daily operating hours exceeding 24 hours for multiple units (see APPENDIX 4). EPNG should ensure that reported data is accurate. 7. Emissions were observed from the actuator seal on Inlet Separator #2. EPNG's representative stated that their Greenhouse Gas (GHG) inspection team observed emissions from multiple components on the inlet separators on April 13, 2023 and had repaired the leaking components. A review of the GHG inspection report (Appendix 6, CBI, not included in this report) shows that emissions were observed from the actuator seals on all four separators on April 13, 2023. EPNG should repair the leak on the Separator #2 actuator seal. 8. EPNG's permit includes a propylene glycol tank, represented as Emission Unit ID No. 14. EPNG's representative stated that the tank stores Ambitrol, which is predominantly ethylene glycol. A copy of safety data sheet (SDS) provided by EPNG is included as Appendix 6. EPNG should revise its permit with accurate representation. 4 EPA Inspection Report - Page 5 of 38 El Paso Natural Gas Company, LLC / Laguna Compressor Station 05/17/2023 9. EPNG's permit includes Emission Unit ID No. 16, which is described as "8 Diesel and fuel oil storage tanks" and lists 8 lube oil/used oil tanks. No diesel tank is listed, and there is no diesel tank on site. EPNG should revise its permit with accurate representation. EPA Region 6 inspectors Prince Nfodzo, Bailey Brown, and Uma Lad conducted a closing conference for the inspection at the El Paso Natural Gas Company, LLC's Laguna Compressor Station at 3:36 pm on May 17, 2023. During the closing conference, I presented preliminary findings of the inspection and reviewed AOC #1, #2, #6, #8 and #9 that were noted during the inspection. Additionally, AOCs #3-5 and #7 were determined after the conclusion of the on-site inspection and were not included in the closing conference. I informed the representatives of the procedures that will follow the field inspection, and that the inspection report will be made public on EPA's website. The sign-in sheet for the closing conference is included as Appendix 2. Section IV - FOLLOW UP On May 24,2023, EPNG uploaded the following documents that we requested during the inspection to a shared OneDrive folder: 1. A location station plot plan or similar; 2. The original compressor engine manufacturer's recommended operation and maintenance ("O&M") procedures; 3. The current facility's O&M procedures or plan; 4. O&M and environmental training records or planned schedule; 5. Copies of the daily station checks May 1 through May 5, and May 17; 6. A blank copy of the daily station checklist; 7. Supporting information or documents where the lube oil and used oil vapor pressure are classified as "exempt" or insignificant; 8. A copy of Ambitrol Glycol SDS; 9. A listing of each engine's serial number; 10. The H2S daily average readings for natural gas used during the months of April and to-date in May; 11. A simplified process flow diagram; and, 12. A copy of the recent GHG survey and any work orders for any discovered leaks. On June 5, 2023, I had a conference call with Mr. Duarte, EPNG's Senior EHS Engineer, to seek clarification on some of the information submitted and discussed all other AOCs noted during the off-site document review. Section V - LIST OF APPENDICES Appendix 1 - Photo Log - 13 photos taken 5/17/23 Appendix 2 - Opening and Closing Conference Sign-in Sheets Appendix 3 - Process Description and Process Flow Diagram Appendix 4 - Pages from Annual Certification and 6-Month Monitoring Report Appendix 5 - Fuel H2S Monitoring Records Appendix 6 - Ambitrol Safety Data Sheet CBI Appendices (not included in published version of the report) Appendix 7 - Greenhouse Gas Inspection Report 5 EPA Inspection Report - Page 6 of 38 El Paso Natural Gas Company, LLC / Laguna Compressor Station 5/17/2023 Appendix 1 Photograph Log EPA Inspection Report - Page 7 of 38 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Photograph Log Photo No. 1 Location: El Paso Natural Gas Company, LLC/Laguna Compressor Station City: New Laguna County/Parish: Cibola State: New Mexico Photo File Name: DSCN0608.JPG Date of Photo: 05/17/23 Time of Photo: 8:20 AM Photographer: Uma Lad Site Name: Laguna Compressor Station Description: Facility signage. EPA Inspection Report - Page 8 of 38 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Photograph Log Photo No. 2 Location: El Paso Natural Gas Company, LLC/Laguna Compressor Station City: New Laguna County/Parish: Cibola State: New Mexico Photo File Name: DSCN0609.JPG Date of Photo: 05/17/23 Time of Photo: 8:21 AM Photographer: Uma Lad Site Name: Laguna Compressor Station Description: Facility signage. EPA Inspection Report - Page 9 of 38 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Photograph Log Photo No. 3 Location: El Paso Natural Gas Company, LLC/Laguna Compressor Station City: New Laguna County/Parish: Cibola State: New Mexico Photo File Name: DSCN0613.JPG Date of Photo: 05/17/23 Time of Photo: 2:05 PM Photographer: Uma Lad Site Name: Laguna Compressor Station Description: Plate on Clark TLA-10 compressor engine, A-03, with serial number 79005. EPA Inspection Report - Page 10 of 38 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Photograph Log Photo No. 4 Location: El Paso Natural Gas Company, LLC/Laguna Compressor Station City: New Laguna County/Parish: Cibola State: New Mexico Photo File Name: DSCN0612.JPG Date of Photo: 05/17/23 Time of Photo: 2:05 PM Photographer: Uma Lad Site Name: Laguna Compressor Station Description: Plate on Clark TLA-10 compressor engine, A-02, with serial number 79008. EPA Inspection Report - Page 11 of 38 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Photograph Log Photo No. 5 Location: El Paso Natural Gas Company, LLC/Laguna Compressor Station City: New Laguna County/Parish: Cibola State: New Mexico Photo File Name: DSCN0614.JPG Date of Photo: 05/17/23 Time of Photo: 2:06 PM Photographer: Uma Lad Site Name: Laguna Compressor Station Description: Plate on Clark TLA-10 compressor engine, A-01, with serial number 79007. EPA Inspection Report - Page 12 of 38 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Photograph Log Photo No. 6 Location: El Paso Natural Gas Company, LLC/Laguna Compressor Station City: New Laguna County/Parish: Cibola State: New Mexico Photo File Name: DSCN0615.JPG Date of Photo: 05/17/23 Time of Photo: 2:07 PM Photographer: Uma Lad Site Name: Laguna Compressor Station Description: Clark TLA-10 compressor engine A-01. EPA Inspection Report - Page 13 of 38 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Photograph Log Photo No. 7 Location: El Paso Natural Gas Company, LLC/Laguna Compressor Station City: New Laguna County/Parish: Cibola State: New Mexico Photo File Name: DSCN0616.JPG Date of Photo: 05/17/23 Time of Photo: 2:07 PM Photographer: Uma Lad Site Name: Laguna Compressor Station Description: Clark TLA-10 compressor engine A-01. EPA Inspection Report - Page 14 of 38 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Photograph Log Photo No. 8 Location: El Paso Natural Gas Company, LLC/Laguna Compressor Station City: New Laguna County/Parish: Cibola State: New Mexico Photo File Name: DSCN0618.JPG Date of Photo: 05/17/23 Time of Photo: 2:14 PM Photographer: Uma Lad Site Name: Laguna Compressor Station Description: Plate on an Ingersoll-Rand engine, AUX-01, with serial number 8CPST227. EPA Inspection Report - Page 15 of 38 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Photograph Log Photo No. 9 Location: El Paso Natural Gas Company, LLC/Laguna Compressor Station City: New Laguna County/Parish: Cibola State: New Mexico Photo File Name: DSCN0619.JPG Date of Photo: 05/17/23 Time of Photo: 2:15 PM Photographer: Uma Lad Site Name: Laguna Compressor Station Description: Plate on an Ingersoll-Rand engine, AUX-02, with serial number 8CPST228. EPA Inspection Report - Page 16 of 38 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Photograph Log Photo No. 10 Location: El Paso Natural Gas Company, LLC/Laguna Compressor Station City: New Laguna County/Parish: Cibola State: New Mexico Photo File Name: DSCN0620.JPG Date of Photo: 05/17/23 Time of Photo: 2:17 PM Photographer: Uma Lad Site Name: Laguna Compressor Station Description: Ingersoll-Rand engine, AUX-02. EPA Inspection Report - Page 17 of 38 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Photograph Log Photo No. 11 Location: El Paso Natural Gas Company, LLC/Laguna Compressor Station City: New Laguna County/Parish: Cibola State: New Mexico Photo File Name: DSCN0621.JPG Date of Photo: 05/17/23 Time of Photo: 2:19 PM Photographer: Uma Lad Site Name: Laguna Compressor Station Description: NSCR units with stacks on the Ingersoll-Rand engines. EPA Inspection Report - Page 18 of 38 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Photograph Log Photo No. 12 Location: El Paso Natural Gas Company, LLC/Laguna Compressor Station City: New Laguna County/Parish: Cibola State: New Mexico Photo File Name: DSCN0622.JPG Date of Photo: 05/17/23 Time of Photo: 2:27 PM Photographer: Uma Lad Site Name: Laguna Compressor Station Description: Inlet Scrubbers/Separators #3 (right) and #4 (left). Staining present on Separator #3. EPA Inspection Report - Page 19 of 38 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Photograph Log Photo No. 13 Location: El Paso Natural Gas Company, LLC/Laguna Compressor Station City: New Laguna County/Parish: Cibola State: New Mexico Photo File Name: DSCN0623.JPG Date of Photo: 05/17/23 Time of Photo: 2:36 PM Photographer: Uma Lad Site Name: Laguna Compressor Station Description: Inlet Scrubbers/Separators #1 (left) and #2 (right). EPA Inspection Report - Page 20 of 38 Appendix 2 Opening and closing conference sign-in sheets EPA Inspection Report - Page 21 of 38 EPA Inspection Report - Page 22 of 38 EPA Inspection Report - Page 23 of 38 Appendix 3 Process Description and Process Flow Diagram EPA Inspection Report - Page 24 of 38 I. Source Information and Emission Units A. Source Information Owner Name: El Paso Natural Gas, L.L.C., a Kinder Morgan Company 2 North Nevada Ave Colorado Springs, CO 80903 Responsible Official: Philip L. Baca, Albuquerque Division Director El Paso Natural Gas Company, L.L.C. 5151 E. Broadway, Suite 1680 Tuscan, Arizona 85711 Phone: (520) 663-7113 Email: Philip_Baca@kindermorgan.com Facility Name: Laguna Compressor Station Facility Location: 5 miles Southeast of Laguna, Cibola County, New Mexico Within Pueblo of Laguna Latitude: 34 59' 42" Longitude: 107 18' 51" Facility Contact: Richard Duarte Senior EHS Engineer 7445 Pan American Freeway, Ste 202 Albuquerque, NM 87109 Phone (505) 831-7763 Email: Ricardo_Duarte@kindermorgan.com SIC Code: 4922 B. Process Description: EPNG is a natural gas compression and transmission facility with pressurized natural gas as its principal product. The facility's Standard Industrial Classification code is 4922 and the process flow diagram is shown on Figure 1 in Appendix A. The facility receives natural gas from an EPNG pipeline and before the natural gas is re-compressed it first passes through inlet separators, which may also be referenced as scrubbers. The purpose of the inlet separators is to primarily remove any lubrication oils or impurities entrained in the natural gas stream from the upstream compressor station. The used oil that accumulates within the separator is periodically discharged manually. The discharge period is dependent on natural gas demand of the pipeline through the compressor station. The process involves a station technician who inspects the liquid level and by hand slightly opens the discharge valve for a very brief period (estimated to be less than a minute) until an audible sound of natural gas is heard indicating the liquid has vacated the separator's collection basin. The used oil and any natural gas discharge directly into a process vessel that allows the used oil to come to atmospheric pressure and the residual natural gas vented. From this process vessel, Page 7 of 39 EPA Inspection Report - Page 25 of 38 the used oil automatically drains into the used oil tank where it is eventually recycled as used oil. Because the EPNG pipeline system is bi-directional, the upstream station may be either from Bluewater Compressor Station to the west or Belen Compressor Station to the east. Once the gas is free of oil, it is then compressed by one, two or all three engine driven gas compressors, depending on demand. After compression, the discharged natural gas increases in pressure and temperature. To lower the temperature, the gas finally passes through a fin-fan system (using natural convection) before it exits the facility The compressor engines are Clark TLA-10, 2-stroke lean burn, natural gas engines rated at 3,400-horsepower (hp). These units were installed in 1958. These units have the following serial numbers: A-01 with serial number 79007; A-02 with serial number 79008; A-03 with serial number 79005. The Ingersoll-Rand PSVG-8 auxiliary units are 4-stroke rich burn, natural gasfired engine driven generators, rated at 544-hp, which provide electric power to the station. These units were also installed in 1958. With the exception of switching from one unit to the other, only one can operate at a time; as only one can supply electric power to the station. The serial numbers for these emission units are 8CPST227 for AUX A-01 and 8CPST228 for AUX A-02. Products of combustion from the compressor and generator engines exhaust through independent stacks. The source shall maintain records of the serial numbers, and any change in serial number for each emission unit should be reflected in the semi-annual compliance reports for monitoring and recordkeeping requirements. C. Compressor Station Emission Units and Control Devices Table 1. Laguna's Compressor Station Facility Unit No. A-01 A-02 A-03 Aux01 Aux02 Type of Unit Serial No. Manufacturer Model No. Design Heat Input Natural gas fired Engine, #79007 Natural gas fired Engine, #79008 Natural gas fired Engine, #79005 Natural gas fired engine, 8CPST227 Natural gas fired engine, 8CPST228 Clark TLA-10 33.26 MMBtu/hr 2-stroke lean burn Clark TLA-10 33.26 MMBtu/hr 2-stroke lean burn Clark TLA-10 33.26 MMBtu/hr 2-stroke lean burn Ingersoll-Rand PSVG-8 8.13 MMBtu/hr 4-stroke rich burn Ingersoll-Rand PSVG-8 8.13 MMBtu/hr 4-stroke rich burn Operating Range or Size of Unit 3400 hp 3400hp 3400 hp 544 hp 544 hp Date of Installation 1958 1958 1958 1958 1958 Primary Use Compressor drive Compressor drive Compressor drive Auxiliary electrical generators Auxiliary electrical generators Control Equipment None Exemption at 40 CFR Part 63.6590(b)(3)(i) None Exemption at 40 CFR Part 63.6590(b)(3)(i) None Exemption at 40 CFR Part 63.6590(b)(3)(i) QUICK LID Catalytic Converter 76 % Control Efficiency QUICK LID Catalytic Converter 76 % Control Efficiency Page 8 of 39 EPA Inspection Report - Page 26 of 38 Appendix A Figure 1: Laguna Compressor Station Process Flow Page 33 of 39 EPA Inspection Report - Page 27 of 38 Appendix 4 Pages from Annual Certification and 6-Month Monitoring Report EPA Inspection Report - Page 28 of 38 El Paso Natural Gas Company, L.L.C. a l<inder Morgan cor~npany March 25, 2021 US EPA - Region VI Enforcement & Compliance Division Mail code: 6EN-A 1201 Elm Street, Suite 500 Dallas, Texas 75270 FedEx 2-Day Service & CEDRI #78514160 2000 Re: Annual Certification & Six-Month Monitoring Reports for EPNG's Laguna Compressor Station - Operating Permit Number R6FOP-NM-02-R2-2020. Dear Madam or Sir: In accord with the requirements of sections III. D. 2 (semi-annual report) and III.D. 3 (annual compliance certification) of the subject permit, enclosed are the two reports. The first is the annual compliance certification report for the period between March 1, 2020 through February 28, 2021, and the second is the six-month monitoring report for the period from September 1, 2020 through February 28, 2021. If you have any questions on any of this information, please feel free to contact me at (505) 831-7763 or email Ricardo_Duarte@KinderMorgan.com. Sincerely, Richard Duarte Sr. EHS Engineer El Paso Natural Gas Company, L. L. C. Air Permitting & Compliance - West, KM Natural Gas Pipelines Enclosures (ACC and six-month report) El Paso Natural Gas Co. LLC Albuquerque Office 7445 Pan American Freeway, Suite 202 Albuquerque, NM 87109 EPA Inspection Report - Page 29 of 38 MonthiIV Heat Rate &MonthiIV FueIConsumot1on Summary Level 1 2 3 4 s 6 7 8 6548:A:01:A 6548:A:01:U 6548:A:02:A 6548:A:02:U 6548:A:03:U Summary Level 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 2 3 4 5 6 7 8 6548:A:01:A 6548:A:Ol:U 6548:A:02:A 6548:A:02:U 6548:A:03:U Summary Level 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 2 3 4 5 6 7 8 16108 Summary Level 0 0 0 0 0 0 0 0 1 2 3 4 5 6 7 8 6548:A:01:A 6548:A:01:U 6548:A:02:A 6548:A:02:U 6548:A:03:U 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo 0.00 o.oo o.oo a.co 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9 10 11 12 13 14 15 16 17 18 19 20 September 2020 Month Fuel (MMCF) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 10 11 12 13 14 15 16 17 18 19 20 September 2020 DaUy Hours 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 10 11 12 13 14 15 16 17 18 19 20 September 2020 Daily BTU/scf (LHV) 0 0 0 0 0 0 0 0 0 0 0 0 9 10 11 12 13 14 15 16 17 18 19 20 September 2020 Daily Individual Highest Heat Input Rate (MMBTU/hr) 0.00 o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 o.oo 0.00 0.00 a.co a.co 0.00 0.00 0.00 a.co 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0,00 o.oo a.co o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21 22 0 0 0 0 0 21 0 0 0 0 0 22 0 0 0 0 0 21 0 0 0 0 0 22 01 0 21 22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23 0 0 0 0 0 23 0 0 0 0 0 23 0 23 0.00 0.00 0.00 0.00 0.00 24 25 0 0 0 0 0 24 0 0 0 0 0 25 0 0 0 0 0 24 0 0 0 0 0 25 01 0 24 25 0.00 0.00 0.00 a.co 0.00 0.00 o.oo a.co 0.00 0.00 26 0 0 0 0 0 26 0 0 0 0 0 26 0 26 0.00 0.00 0.00 0.00 0.00 27 0 0 0 0 0 27 0 0 0 0 0 27 0 27 0.00 0.00 0.00 0.00 0.00 28 0 0 0 0 0 28 0 0 0 0 0 28 0 28 0.00 0.00 0.00 0.00 0.00 29 0 0 0 0 0 29 0 0 0 0 0 29 0 29 a.co 0.00 o.oo 0.00 o.oo 30 0 0 0 0 0 30 0 0 0 0 0 30 0 30 0.00 0.00 0.00 0.00 0.00 31 Month(MMscf) 0 0 0 0 0 31 0 0 0 0 0 31 01 31 0.00 0.00 0.00 0.00 0.00 12-Mo. Rolfinr (MMscf) 0 0 0 2947.4 0 0 0 2252.6 0 11.7 0 0 0 0 0 Monthlv Heat Rate & Monthlv Fue Consumotion Summary Level 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 October 2020 Month Fuel (MMCF) 6548:A:Ol:A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6548:A:Ol:U 6548:A:02:A 0 0 0 0 0 0 0 0 0 0 0 0 265.2 503.7 456.4 508.6 222.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6548:A:02:U 0 0 0 0 0 0 0 0 0 0 0 0 249.1 469.S 488.1 514.4 212.2 0 0 0 6548:A:03:U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12.4 0 0 0 0 Summary Level 6548:A:Ol:A 6548:A:Ol:U 6548:A:02:A 6548:A:02:U 6548:A:03:U 1 2 3 4 s 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 October 2020 Dally Hours 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13.1 19.6 24 24 10.4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12.2 24 24 24 9.9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.5 0 0 0 0 Summ11ry Level 16108 Summary Level 6548:A:01:A 6548:A:01:U 6548:A:02:A 6548:A:02:U 6548:A:03:U 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 October 2020 Dally BTU/sef (LHV) 0 0 0 0 0 0 0 0 0 0 0 0 905.9 905.9 905.9 905.9 905.9 0 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1S 16 17 u 19 2D October 2020 Daily Individual Highest Heat Input Rate (MMBTU/hr) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 o.oo 0.00 o.ao o.oo 0.00 18.34 23.28 17.23 19.20 19.38 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 a.co o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 18.50 17.72 18.42 19.42 19.42 0.00 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 o.oo 0.00 0.00 o.oo o.oo 0.00 0.00 0.00 0.00 o.oo 22.47 0.00 0.00 0.00 0.00 21 0 0 0 0 0 21 0 0 0 0 0 21 0 21 0.00 0.00 0.00 0.00 o.oo 22 0 0 0 0 0 22 0 0 0 0 0 22 0 22 0.00 0.00 0.00 0.00 0.00 23 24 25 26 27 28 0 0 0 0 0 23 0 0 0 0 0 24 0 0 0 0 0 25 0 0 0 0 0 26 0 0 0 0 0 27 0 0 0 0 0 28 0 0 0 0 0 23 0 0 0 0 0 24 0 0 0 0 0 25 0 0 0 0 0 26 0 0 0 0 0 27 0 0 0 0 0 28 01 01 0 23 24 25 01 01 0 26 27 28 0.00 0.00 o.oo 0.00 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 0.00 29 30 0 0 0 0 0 29 0 0 0 0 0 30 0 0 0 0 0 29 0 0 0 0 0 30 0 29 0 3D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo 0.00 31 Month(MMscf) 0 0 0 0 0 31 0 0 0 0 0 31 0 :31 0.00 0.00 o.oo 0.00 0.00 12-Mo. Rolling (MMsd) 0 1956.4 0 19333 12.4 0 8986.9 0 4175.9 24.1 0 91.1 0 94.1 0.5 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 2? 28 29 30 31 Month (MMscf) 12-Mo. Rolling (MMscf) 0 0 0 8986.9 0 0 )> ~ C') ::::r 3 (I) ::I r+ : OJ 0...., w EPA Inspection Report - Page 30 of 38 6548:A:02:U 6548:A:03:U Summary Level 6548:A:01:A 6548:A:01:U 6548:A:02:A 6548:A:02:U 6548:A:03:U Summary Level 16108 Summary Level 6548:A:01:A 6548:A:01:U 6548:A:02:A 6548:A:02:U 6548:A:03:U 0 0 01 01 01 01 01 01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 November 2020 Daily Hours 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 November 2020 Daily BTU/scf (LHV) 0 OJ 01 01 0 0 0 0 0 0 01 01 0 0 0 0 01 01 01 01 01 0 0 0 01 01 0 0 0 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 November 2020 Daily Individual Highest Heat Input Rate (MMBTU/hr) 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 0,00 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 0,00 0.00 o.oo 0.00 0.00 0.00 o.oo o.oo 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 0.00 0.00 0.00 o.oo 0.00 o.oo o.oo 0.00 o.oo 0.00 0.00 0.00 0,00 o.oo 0.00 0.00 0.00 0.00 0.00 a.co 0.00 0.00 0.00 0,00 0.00 0.00 a.co 0.00 a.co 0.00 o.oo 0.00 0,00 0.00 0.00 0.00 Q.00 0.00 0.00 o.oo 0.00 o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo Q.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 a.co 0.00 0.00 o.oo a.co 0.00 0.00 0.00 0.00 0.00 o.oo 0.00 OI 4186.21 01 24.11 0 0 0 0 0 Monthlv Heat Rate & Monthlv Fuel Consumotion Summary Level 6548:A:01:A 6548:A:01:U 6548:A:02:A 6548:A:02:U 6548:A:03:U Summarv Level 6548:A:01:A 6548:A:01:U 6548:A:02:A 6548:A:02:U 6548~:03:U Summarv Level 16108 Summarv Level 6548:A:01:A 6548:A:01:U 6548:A:02:A 6548:A:02:U 6548:A:03:U 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Month (MMsd) 12-Mo. Rolling (MMscf) January 2021 Month Fuel (MMCF) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 154.5 480.7 489.2 498.1 491.2 487.6 496.9 492.3 494.4 503,3 514.6 520.4 507.8 495.1 498.4 508.2 490.7 490.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 167.1 484.4 489.8 498.9 491.6 488.7 497.8 494.1 496.6 503.7 513.6 518.2 474.2 13.81 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9.659 0 0 0 0 0 523.7 551.2 sea.a 544.4 537.4 0 0 8613.,14 0 6132.5066 2747.03,13 0 12103.28 0 9648.428 2771.134 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 January 2021 Daily Hours 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7.6 24 24 24 24 24 24 24 24 24 24 24 24 24.01 24 24.01 24.01 24 0 415.63352 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8.2 24 24 24 24 24 24 24 24 24 24 24 22.2 0.619 0 0 0 0 0 295.018729 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q.385 0 0 0 0 0 23.81 24.01 24 24.01 24 0 120.217415 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20. 21 22 23 24 25 26 27 28 29 30 31 January 2021 Daily BTU/sd {LHV) 0 0 0 0 0 0 0 0 0 0 OJ 0 905.9 905.9 905.9 905.91 905.9 905.9 905.9! 905.9 905.9 905.9 905.9 905.91 905.91 905.9 905.9 905.9 905.9 905.9 01 1 I2 I3 I4 I5 I6 7 8 9 10 11 12 I 13 14 15 16 17 I 18 19 20 21 22 23 24 25 26 27 28 29 I 30 31 January 2021 Daily Individual Highest Heat Input Rate (MMBTU/hr) 0.00 0.00 0.00 0.00 a.co 0.00 a.co 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 a.co 0.00 o.oo 0.00 o.oo 0.00 o.oo 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 o.oo 0.00 0.00 0.00 0,00 0.00 o.oo 18.41 18.14 18.47 18.80 18.54 18.41 18.75 18.58 18.66 19.00 19.43 19.64 19.17 18.68 18.82 19.17 18.51 18.50 0.00 0.00 0.00 0.00 0.00 o.oo 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 a.co 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.46 18.29 18.49 18.83 18.55 18.45 18.79 18,65 18.75 19.01 19.38 19.56 19.35 20.23 0.00 a.co a.co a.co 0.00 o.oo 0.00 0.00 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 0.00 o.oo 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 22.75 0.00 o.oo 0.00 o.oo 0.00 19.92 20.79 21.92 20.54 20.29 o.oo Monthlv Heat Rate & Monthlv Fuel rnneumr,tion Summary Level 1 2 3 4 5 6 7 8 9 6548:A:Ol:A 0 0 0 0 0 0 0 0 0 6548:A:01:U 507.5 533.2 200.8 0 0 0 0 0 0 6548:A:02:A 0 0 0 0 0 0 0 0 0 6548:A:02:U 0 0 0 0 0 0 0 0 0 6548:A:03:U 552.9 573.3 195.3 0 0 Summarv Level 1 2 3 4 5 0 0 0 0 7 8 9 6548:A:01:A 6548:A:Ol:U 6548:A:02:A 6548:A:02:U 6548:A:03:U 0 0 0 0 0 0 0 0 0 24 24 7.676 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24 24 7.425 0 0 0 0 0 0 Summarv Level 1 2 3 4 5 6 7 8 9 16108 905.9 905.9 905.9 0 0 0 0 0 0 Summarv Level 1 2I3 I4 I5 I6 7 8 9 6548:A:Ol:A 6548:A:01:U a.co 0.001 0.001 0.00 0.00 0.00 o.oo 0.00 0.00 19.161 20.131 23.701 0.00 0.00 0.00 0.00 0,00 0.00 10 11 12 13 14 15 16 17 18 19 20 0 0 0 0 0 10 0 0 0 0 0 0 0 0 0 0 11 0 0 0 0 0 Febuary 2021 Month Fuel (MMCF) 0 0 0 0 0 0 0 0 299.4 471.4 632.6 632.4 0 0 0 0 0 0 0 0 0 534.7 633.1 629.6 123.5 25.79 223.4 198.1 0 0 12 13 14 15 16 17 Febuarv 2021 Daily Hours 0 0 0 0 0 0 0 0 12.22 17.93 24.1 24.l 0 0 0 0 0 0 0 0 0 20.48 24.08 24.1 5.067 0.987 8.361 7.559 0 0 0 341.1 0 553.4 0 18 0 12.88 0 21.69 0 0 0 0 550.6 0 19 0 0 0 23.78 0 0 268.2 0 0 33.39 20 0 11.52 0 0 1.455 10 11 12 13 14 15 16 17 18 19 20 Febuary 2021 Dally BTU/scf (LHV} 0 0 905.9 905.9 905.91 905.9 905.9 905.9 905.9 905.9 905.9 10 11 I 12 I 13 14 15 16 I 17l1sl19 20 I Febuary 2021 Daily Individual Highest Heat Input Rate (MMBTU/hr) 0.00 0.001 0.00 0.00 a.co 0.00 0.001 0.001 0.001 0.001 0.00 o.oo o.ool o.oo 0.00 22.19 23.821 23.78 23.781 24.00I 0.00 21.09 21 0 0 0 0 0 21 0 0 0 0 0 21 0 21 0.00 0.00 22 0 0 0 0 0 22 0 0 0 0 0 22 0 22 0.00 0.00 23 24 25 26 27 0 0 0 0 0 23 0 219.2 0 209.2 0 24 0 499.4 0 503,5 0 25 0 498 0 169.4 347 26 0 501.2 0 0 524.7 27 0 0 0 0 0 23 0 10.64 0 9.967 0 24 0 24.l 0 24.08 0 25 0 24.1 0 8.11 15.92 26 0 24.08 0 0 24.l 27 0 905.91 905.9 905.9 905.9 23 24 25 26 27 0.001 0.001 0.001 0.00 0.00 a.oat 1e.G1I 18.77 18.72 18.86 28 29 30 31 Month(MMscf) 12-Mo. Rolling (MMscf) 0 0 0 0 0 28 0 0 0 0 0 29 0 0 0 0 0 30 0 0 0 0 0 31 0 5604.2873 0 3783.4454 2797.3664 0 18196.64 0 13431.87 6104.463 0 0 0 0 0 28 0 0 0 0 0 29 0 0 0 0 0 30 0 0 0 0 0 31 OJ OJ 0 0 28 29 30 31 O.OOJ 0,001 0.001 0.001 0.00 o.oo o.oo a.oat 0 241.32455 0 156.287728 118.866262 )> ~ (") ::::r 3 Cl) ::I r-+ CD "0 ~ c.o Cl) N .0..., w EPA Inspection Report - Page 31 of 38 6548:A:02:A 6548:A:02:U 6548:A:03:U 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo o.oo 0.00 0.00 0.00 0.00 0.00 o.oo o.oo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.oo 0.00 0.00 0.00 o.oo o.oo 0.00 o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo o.oo 23.65 23.82 23.67 23.11 20.98 a.co o.oo o.oo o.oo 19.01 18.94 18.92 a.co o.oo o.oo o.oo o.oo 20.s1 21.64 23.83 o.oo o.oo o.oo o.oo o.oo ~ o.oo o.oo o.oo 22.09 23.68 24.20 23.74 a.co a.co o.oo o.oo 20.19 o.oo o.oo o.oo o.oo o.oo 19.75 19.72 a.co o.oo o.oo o.oo )> ::. s (") ~ -3 CD :::s : m "'tJ s (0 CD w 0 -w EPA Inspection Report - Page 32 of 38 Appendix 5 Fuel H2S Monitoring Records EPA Inspection Report - Page 33 of 38 Asset EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. PIN 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 PIN Name EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER Data Source Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Gas Day Date 4/1/2023 9:00 4/2/2023 9:00 4/3/2023 9:00 4/4/2023 9:00 4/5/2023 9:00 4/6/2023 9:00 4/7/2023 9:00 4/8/2023 9:00 4/9/2023 9:00 4/10/2023 9:00 4/11/2023 9:00 4/12/2023 9:00 4/13/2023 9:00 4/14/2023 9:00 4/15/2023 9:00 4/16/2023 9:00 4/17/2023 9:00 4/18/2023 9:00 4/19/2023 9:00 4/20/2023 9:00 4/21/2023 9:00 4/22/2023 9:00 4/23/2023 9:00 4/24/2023 9:00 4/25/2023 9:00 4/26/2023 9:00 4/27/2023 9:00 4/28/2023 9:00 4/29/2023 9:00 4/30/2023 9:00 5/1/2023 9:00 5/2/2023 9:00 Hydrogen Sulfide Grains/100scf 0.0022 0.0023 0.0099 0.0049 0.0034 0.0021 0.0017 0.0025 0.0016 0.002 0.0107 0.0135 0.0083 0.0121 0.0099 0.0099 0.0032 0.0025 0.0025 0.002 0.0037 0.0027 0.0019 0.0016 0.0046 0.0057 0.0051 0.0035 0.0047 0.0055 0.0046 0.0051 EPA Inspection Report - Page 34 of 38 Asset EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. EL PASO NATURAL GAS COMPANY, L.L.C. PIN 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 314405 PIN Name EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER EPNG/EPNG SAN JUAN X-OVER Data Source Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Online Analyzer Gas Day Date 5/3/2023 9:00 5/4/2023 9:00 5/5/2023 9:00 5/6/2023 9:00 5/7/2023 9:00 5/8/2023 9:00 5/9/2023 9:00 5/10/2023 9:00 5/11/2023 9:00 5/12/2023 9:00 5/13/2023 9:00 5/14/2023 9:00 5/15/2023 9:00 5/16/2023 9:00 5/17/2023 9:00 5/18/2023 9:00 5/19/2023 9:00 Hydrogen Sulfide Grains/100scf 0.008 0.0043 0.0038 0.0054 0.0046 0.0052 0.0053 0.0056 0.0063 0.0076 0.0045 0.0049 0.0041 0.0049 0.0036 0.0032 0.0035 EPA Inspection Report - Page 35 of 38 Appendix 6 Ambitrol Safety Data Sheet EPA Inspection Report - Page 36 of 38 SAFETY DATA SHEET THE DOW CHEMICAL COMPANY Product name: AMBITROLTM FL 50 Coolant, Dyed Issue Date: 04/19/2017 Print Date: 04/20/2017 THE DOW CHEMICAL COMPANY encourages and expects you to read and understand the entire (M)SDS, as there is important information throughout the document. We expect you to follow the precautions identified in this document unless your use conditions would necessitate other appropriate methods or actions. 1. IDENTIFICATION Product name: AMBITROLTM FL 50 Coolant, Dyed Recommended use of the chemical and restrictions on use Identified uses: Intended as a heat transfer fluid for closed-loop systems. We recommend that you use this product in a manner consistent with the listed use. If your intended use is not consistent with the stated use, please contact your sales or technical service representative. COMPANY IDENTIFICATION THE DOW CHEMICAL COMPANY 2030 WILLARD H DOW CENTER MIDLAND MI 48674-0000 UNITED STATES Customer Information Number: 800-258-2436 SDSQuestion@dow.com EMERGENCY TELEPHONE NUMBER 24-Hour Emergency Contact: CHEMTREC +1 800-424-9300 Local Emergency Contact: 800-424-9300 2. HAZARDS IDENTIFICATION Hazard classification This material is hazardous under the criteria of the Federal OSHA Hazard Communication Standard 29CFR 1910.1200. Acute toxicity - Category 4 - Oral Specific target organ toxicity - repeated exposure - Category 2 - Oral Label elements Hazard pictograms TM Trademark of The Dow Chemical Company ("Dow") or an affiliated company of Dow Page 1 of 12 EPA Inspection Report - Page 37 of 38 Product name: AMBITROLTM FL 50 Coolant, Dyed Issue Date: 04/19/2017 Signal word: WARNING! Hazards Harmful if swallowed. May cause damage to organs (Kidney) through prolonged or repeated exposure if swallowed. Precautionary statements Prevention Do not breathe dust/ fume/ gas/ mist/ vapours/ spray. Wash skin thoroughly after handling. Do not eat, drink or smoke when using this product. Response IF SWALLOWED: Call a POISON CENTER/doctor if you feel unwell. Rinse mouth. Get medical advice/ attention if you feel unwell. Disposal Dispose of contents/ container to an approved waste disposal plant. Other hazards No data available 3. COMPOSITION/INFORMATION ON INGREDIENTS This product is a mixture. Component CASRN Concentration Ethylene glycol Water Dipotassium hydrogen phosphate 107-21-1 7732-18-5 7758-11-4 >= 30.0 - <= 60.0 % < 50.0 % < 1.5 % 4. FIRST AID MEASURES Description of first aid measures General advice: First Aid responders should pay attention to self-protection and use the recommended protective clothing (chemical resistant gloves, splash protection). If potential for exposure exists refer to Section 8 for specific personal protective equipment. Inhalation: Move person to fresh air; if effects occur, consult a physician. Skin contact: Immediately flush skin with water while removing contaminated clothing and shoes. Get medical attention if symptoms occur. Wash clothing before reuse. Destroy contaminated leather items such as shoes, belts, and watchbands. Suitable emergency safety shower facility should be immediately available. Page 2 of 12 EPA Inspection Report - Page 38 of 38 Appendix 7 Green House Gas Inspection Report (CBI)