Document a4Z57mB39MNQoD1nKaa9knG4Y
UNITED . S*
TATESUNITED STATES ENVIRORNEMGIEONNT 1A
L PROTECTION AGENCY
AGENCY5 POST OFFICE SQUARE, SUITE 100
ENVIR"O
TOECNTIOMN
ENTABOSTON, MA 02109-3912
Date:Dated as shown on electronic signature(s)
Subj:Inspection Report
Clean Water Act - National Pollutant Discharge Elimination
System (" NPDES ")
Apple Road Gravel Site
From:Andrew Spejewski, Inspector
ANDREWDigitally ANsDiREgWn SePdE JEbWySK
I
SPEJEWSKI
Date: 2023.08.01 11:46:17
-04'00 '
Thru:Alex Rosenberg
To: File
I. Facility Information
A. Facility Name:Apple Road Gravel Site
B. Facility Location: Apple Road
Brimfield, MA 01010
C. Facility Contacts:Joe Ciesla, Owner
PO Box 87
Webster, MA 01570
joedciesla@gmail.com
D. NPDES ID No (s).: None
II. Background Information
A. Date(s) of inspection: July 20, 2023
B. Weather Conditions: Clear, dry.
C. US EPA Representative(s):
Andrew Spejewski
D. State / Local Representative(s):
Mary Grover, MA DEP
Michael McHugh, MA DEP
ED_019088A_00005029-00001
E. Federally Enforceable Requirements Covered During the Inspection: National
Pollutant Discharge Elimination System Multi - Sector General Permit (" MSGP ")
(March 1, 2021-modified September 29, 2021)
F. Previous Enforcement Actions:
No federal actions known.
III. Type and Purpose of Inspection
Evaluation of compliance with Industrial Stormwater requirements.
IV. Facility Description
The site includes three areas, and in total encompasses about 20 acres. A partially cleared
area (" western area ") is immediately south and west of Apple Street; this area is fairly
flat and close to the level of Apple Road. From that area, a gravel road goes south,
crosses a stream, and goes uphill to the west end of the second area (" central area "). The
central area is approximately 7 acres. It slopes down from south to north and drains to a
retention pond to the northeast. From the central area, a gravel road crosses another
stream via a culvert to the third area (' eastern area "). The eastern area was recently
cleared and is currently being graded and used for gravel mining. The eastern area slopes
down to the west and to the north towards the eastern stream; the central part of this area
is slightly below the outer areas in elevation to the west and north.
V. Inspection
The inspection was arranged my MA DEP, at least a week before the inspection.
Mr. Spejewski arrived at the site at about 1:00 PM, and parked at a small parking area
just off of Apple Street, with MA DEP inspectors arriving at about the same time. There,
they met Mary Ann DiPinto, a consultant for the owners, who suggested all driving onto
the site where the owners were waiting. Mr. Spejewski and the MA DEP inspectors
followed her in their own vehicles onto the site, stopping just past (east of) the second
stream crossing. There, they met the owners and additional consultants.
A. Opening Conference
Present were: Joe Ciesla, Stan Ciesla, owners.
David Faist, CMG (consultant), with another CMG employee
MaryAnn DiPinto, Three Oaks Environmental (consultant)
The inspectors described the purposes of their inspections. Mr. Spejewski presented his
credentials to Joe Ciesla and Stan Ciesla and provided a copy of the Small Business
Resources Information Sheet.
2
CCoOmMmPeAnNtYe dN [ARMAE ?(
1]: PRIVATE? OR DOES SHE HAVE A
ED_019088A_00005029-00002
Mr. Stan Ciesla explained that he and Joe Ciesla were brothers and owned the site
together. He said the site had been used for gravel mining since the 1950's. He said a
residential subdivision had been permitted for the western area near Apple Road in the
early 2010's, but it was abandoned before any building construction, by 2014. He said
that area was now only used for storage and stockpiles.
Mr. Ciesla continued to explain that more recently, the second stream crossing was built,
in part to allow the owner of the neighboring property to the east to have access for
logging. He explained the gravel operation was also expanded at that time to the east side
of the stream. He said trees had been cut on the Cieslas'property, but only to allow
access to the gravel.
Neither the Cieslas or any consultants were aware of any EPA stormwater permits for the
site.
The group left on a tour of the site, with the Cieslas joining some of the time.
B. Facility Tour
The eastern section is clear and recently disturbed. Except at the crossing itself, there is
generally a 10-20 yard strip of undisturbed trees between the cleared area and the flowing
stream. To the south and east, the surrounding terrain is above the level of the site in
elevation. The central part of the area has been excavated / graded to an elevation slightly
below a 20-30 yard wide perimeter on the south and east; the central part of the site
appears to infiltrate stormwater, as there is no visible flow path from the central part
through the perimeter. The southern and eastern portion of the outer perimeter itself was
recently graded to slope gently down towards the site boundary (except for a short section
of dirt berm along the edge of the site just north of the stream crossing). Silt fence was
generally in place along the boundary between the cleared site and undisturbed woods.
At the time of the inspection no significant channels or areas of concentrated flow were
observed coming off of the central area, except on the northern edge where very slight
erosion rills beginning to form. Mr. Stan Ciesla explained that some of the outer
perimeter is planned to be permanently stabilized, and some will eventually have gravel
removed.
The eastern most stream crossing is a culvert buried several feet deep under the road.
Rip - rap lines the slope from the road down to the stream. A silt fence is in place along the
stream edge. Outside of that silt fence, almost in the stream, an additional line of failed
silt fence is in place (Photo 141432). All of the silt fence appeared to be slightly
weathered (as if it had not been installed recently), with fresh - looking straw silt roll along
the upgradient side of the fence. The current silt fence appeared to be containing most
sediment. There was a bed of gravel in the stream just below (north of) the crossing. Mr.
Joe Ciesla did not know whether it was there before the crossing was constructed.
The central area slopes down to the north, with a higher elevation area to the west, and
has a berm along the eastern edge. Except for the western portion of the area, it slopes
toward a detention basin located to the north. The basin had standing water in it. The
3
Commented [RA (2]: Can you use some estimate that is
quantitative or more descriptive?
Commented [RA (3]: Do you mean that they will mine the
gravel?
Commented [RA (4]: Check this is cprrect?
Commented [RA (5]: Not sure about past tense. I understand
ytohuo uagrhet wwrei tsihnogu ladb owurti tweha tl iykoeu woeb'errev edde socnr iab ipnrgi owrh adatt ew,e bsuatw Ia
nd what
is present when we saw it.
ED_019088A_00005029-00003
lowest point of the basin wall, to the northeast, was at least a foot above the current water
level. No evidence was observed to indicate whether the basin overflows.
The western part of the central area slopes slightly toward the gravel driveway that runs
down toward the first stream crossing. Based on observations of the site topography,
stormwater runoff is assumed to run down the gravel driveway along the west side and
into an area of rip - rap on the southwest corner of this western most stream crossing.
Some erosional channels observed along the driveway provide further evidence of the
direction of stormwater flow. No significant sediment deposits were observed in the rip-
rap. On the east side of the driveway where it crosses the stream, there is a small
depression lined with rip - rap.
The western portion appears fairly flat, with dirt roads running into it.
C. Records Review
No records were reviewed.
D. Closing Conference
The group returned to the second stream crossing. Mr. Spejewski told the Cieslas that the
site likely did not require a construction stormwater permit, but appeared that it may
require an industrial stormwater permit. Mr. Faist, the consultant, appeared to be familiar
with the MSGP. Mr. Spejewski suggested EPA follow up with Mr. Faist about MSGP
coverage, and he and the Cieslas agreed. Mr. Spejewski asked if Mr. Faist would also be
appropriate to contact for sending the inspection report and other questions, and Mr. Faist
said that general interactions should be with the Cieslas.
Mr. Spejewski departed at approximately 3:00 PM
Picture List:
[Due to a battery error with EPA-issued camera, the inspector used a personal cell phone
to take pictures]
IMG_20230720_133040_HDR.jpg Northeast of second stream crossing, edge of site
IMG_20230720_133042_HDR.jpg West edge of east site, near stream crossing
IMG_20230720_133051_HDR.jpg Facing southeast over east site, from north of stream
crossing
IMG_20230720_133101_HDR.jpg Facing northeast over east site, from north of stream
IMG_20230720_133502_HDR.jpg Facing north along west edge of east site
IMG_20230720_133751_HDR.jpg Northwest corner of east site
IMG_20230720_133757_HDR.jpg North edge of east site
IMG_20230720_134913_HDR.jpg Facing east over stockpile at east edge of east site
IMG_20230720_134927_HDR.jpg Facing east to edge of east site
IMG_20230720_141410_HDR.jpg Second stream crossing, facing north
IMG_20230720_141416_HDR.jpg Northeast side of second stream crossing
IMG_20230720_141432_HDR.jpg Facing south, second stream crossing
4
ED_019088A_00005029-00004
IMG_20230720_142405_HDR.jpg Facing west over central site, from east edge
IMG_20230720_142413_HDR.jpg East side of central site, facing north
IMG_20230720_142648_HDR.jpg Center of central site
IMG_20230720_142655_HDR.jpg Central site, facing north to basin
IMG 20230720_142841.jpg
Basin in central site, facing north
IMG_20230720_142849_HDR.jpg Central site basin facing north
IMG_20230720_143321_HDR.jpg North edge of central site basin
IMG_20230720_144457_HDR.jpg Facing west edge of central site
IMG_20230720_144459_HDR.jpg West end of central site, facing south
IMG_20230720_144557_HDR.jpg First stream crossing, facing west
IMG_20230720_144830_HDR.jpg Southeast of first stream crossing
IMG_20230720_144905_HDR.jpg Rip - rap basin southwest of first stream crossing
* END *
Unless otherwise noted, this report describes conditions at the facility / property as
observed by EPA inspector(s), and / or through records provided to and / or information
reported to EPA inspector(s) by facility representatives and as understood by the
inspector(s). This report may not capture all operations or activities ongoing at the time
of the inspection. This report does not make final determinations on potential areas of
concern. Nothing in this report affects EPA's authorities under federal statutes and
regulations to pursue further investigation or action.
5
ED_019088A_00005029-00005