Document a3bQqJ1L8oY17KLmRJK9nODY
33--Hot Working of Metals
1 Install a substantial guard over the cupola charging door to protect workmen against falling objects Such a guard should be constructed of not less than 1V> by lYi by Vi-m angle iron It should be coveied with a screen equivalent in strength to a 1-in mesh of Jlc-in wire or with not less than No 16 U S gage solid sheet steel The guard should be securely supported by means of overhead slings or underpinning to resist falling objects (Fig 33-8) An alternate method is to place a solid steel plate on the bucket ring in the cupola at charging door level
2 Require all workers who enter a cupola to wear hard hats
3 Provide approved respiiatoiy equipment
Courtesy International Harvester Co
912
Fic 33-8 --A screen placed over the charging door prevents falhng objects from dropping on worker who is repairing cupola lining
Courtesy Hamilton Foundry 6- Machinery Co
for the men relimng the cupola, or place a blower fan in the bottom to keep the dust moving away from them Dust should be exhausted out the stack
4 Place warning signs or crossbars at the charging door to indicate that men are working m a cupola
5 Before lehnmg of a cupola is begun, break all loose slag and bridges and allow them to drop to the bottom of the cupola
6 Check the condition of the shell and riv eting while the cupola is down for relimng A weak shell is likely to increase the risk of a gas explosion
7 Leave ample clearance (at least Y* in )