Document a1ynyrMqmo9dopDyxkwmKOwyY

674 CHAPTER 29 1955 Guide Fig. 4. Steam Supply Installation with Header fob Process and Zone Connections various heating zones and process equipment. If initial pressure is below 50 psi the first stage pressure-reducing valve may be omitted. Heat supply should he graduated according to variations in the outside tem perature. The maximum in economical operation and satisfactory heating can only be obtained by the use of automatic temperature control (see Chapter 39). Rapid draining and venting of the heating system should be obtained by means of suitable traps and air vents in order to obtain rapid circulation and quick heating. This is particularly important with intermittent-type temperature-control equipment. The selection of traps is discussed in Chapter 21. Suggested trap capacities are given in Table 4. Provision should be made for conveniently shutting off the steam supply at night and at other limes when heal is not needed. A considerable amount of heat can be saved by shutting off steam at night and other times when optimum building temperatures are not required. It is necessary, how ever, to have an ample amount of heating surface in order that the build ing may be quickly wanned after such turn-off periods. Residual heat in the condensate should be salvaged. This heat may be salvaged by means of an air-cooling coil, or as is more frequently done, by a Fig. 5. Method of Installing a Water Heater and Economizes in a Gravity Heating System District Heating 675 water-heating economizer, shown in Fig. 5, which preheats the hot water supply to the building. . The condensate from the heating system, after leaving the traps, passes through the economizer. The water supply to the heater passes through the economizer, absorbing heat from the condensate. If the hot-water system in the building is of the recirculating type, the recirculating line should be connected between the economizer and the water heater proper, Meter Capacity Lb Per Hr 250 500 750 1500 3000 6500 Dimension A--Inches Diagram B......................................... 4 4 8 8 8 12 Diagram C. 12 12 15 15 15 18 Diagram D......................................... 12 12 15 15 15 18 Fig. 6. Condensate Meter Installation Details 12000 12 18 18 not at the economizer inlet, because the recirculated hot water is itself at a high temperature. Since the heating-system load and the hot-water demand are not coinci dent a greater amount of heat can be extracted from the condensate if storage capacity is provided for the preheated water. Frequently, there fore, the economizer coils are submerged in the storage tank. METERING Meters are classified into two groups: Condensate Meters and Flow Meters. The Condensate Meter is a popular type for use where all the condensate can be brought to a common point for metering purposes. Its simplicity