Document a1wjEn52Kp4Rr9xEenVRnnXKN

st^s--:------ - - BOX 4858 CHRISTI, TEXAS 78408 I PLAINTIFF'S EXHIBIT BERRY CONTRACTING, INC Industrial Contractors 1414 CORN PRODUCTS ROAD AC 512 884-2100 TELEX 778446 - March 31, 1981 COASTAL STATES PETROCHEMICAL COMPANY P. 0. Drawer 521 Corpus Christi, Texas 78403 Attention: Mi Ld II0TT` Gentlemen: The attached rate sheets for Laborers, Operators, Cement Finishers, and Ironworkers will go into effect tha first fullpayroll -period after April-^, 1981, The rate sheet for Carpenters will go into effect April 1, 1981. Negotiations are now in progress for a wage increase for Pile Drivers. At the conclusion of these negotiations you will be furnished a revised rate sheet. Sincerely, BERRY CONTRACTING, INC. enclosure B. D. Daniels Business Development y CED0006565 EXHIBIT "A" BERRY CONTRACTING. INC. LABOR RATE SCHEDULE for COASTAL STATFS PFTR0CHFM1CAI COMPANY CraftCARPENTERS Effective 4-1 -81thru 9-30-81 Page 2A : 14 Carpenter 1st Pd. App. 553S 2nd Pd. App. 65% 3rd Pd. App. 70% 4th Pd. App. 75% 5th Pd. App. 80% 6th Pd. App. 85% 7th Pd. App. 90% 8th Pd. App. 95% Saw Operator or Filer 19 General Foreman 13 Foreman Straight Time $13,145 7.76 8.96 9.555 10.145 10.755 11.35 11.945 12.55 13.315 15.17 13.82 Time and One Half Double Time $18,245 $23,345 10.565 13.37 12.275 15.59 13.125 16.69 13.97 17.79 14.835 18.92 15.685 20.02 16.535 21.12 17.395 " 22.245 18.485 23.66 21.13 27.095 19.205 24.595 -------------------------------------------------------------------------------O------------------------------------------------------------------ ----------- The above rates include wages, benefits, applicable payroll burdens such as F.I.C.A., Withholding Tax, and the premiums on insur ance, overhead and profit. These rates do not include any other costs or contingencies such as rework or uninsured losses. CED0006566 EXHIBIT "A" BEEBY CONTRACTING. INC. LABOR RATE SCHEDULE for COASTAL STATFS PFTRQCHEMICAL COMPANY Page 3A Craft rrWFNT ftntchfpsEffective fl-i.flithru 9-30-81 MAINTENANCE RATES Finisher Foreman Machine Operator 1st 6 mo. App. 60% 2nd 6 mo. App. 70% 3rd 6 mo. App. 80% 4th 6 mo. App. 90% Straight Time $15.32 15.945 15.66 9.195 10.73 12.26 13.795 Time and One Half $21,845 22.735 22.33 13.11 15.30 17.48 19.67 Double Time $28.37 29.525 29.00 17.025 19.87 22.70 25.55 ------------------------------------------------------------------------------- o------------------------------------------------------- ------------- - The above rales include wages, beneiits, applicable payroll burdens such as FJ.C-A-. Withholding Tax, and the premiums on insur ance, overhead and prolil. These rates do not include any other costs or contingencies such as rework or uninsured losses. CED0006567 EXHIBIT "A" BERRY CONTRACTING. INC, LABOR RATE SCHEDULE for COASTAL SIATFS PFTRflCHFM.I CAL,Jill Craft IRONMORKFRSEffective 4-1-81thru 5-31-81 Page____ 4A Ironworker 1st Pd. App. 60% 2nd Pd. App. 70% 3rd Pd. App. 75% 4th Pd. App. 80% 5th Pd. App. 85% 6th Pd. App. 90% General Foreman Foreman . Straight Time $16,995 11.045 12.53 13.285 14.025 14.77 15.51 21.83 21.045 Time and One Half $23.33 14.845 16.695 18.04 19.095 20.155 21.215 30.225 29.105 - Double Time $29.67 18.645 21.395 22.795 24.17 25.545 26.92 38.62 37.17 -------------------------------------------------------------------------------o------------------------------------------------------------------------------ The above rates include wages, benefits, applicable payroll burdens such as FJ.C.A.. Withholding Tax, and the premiums on insur ance, overhead and prolit. These rates do not include any other coats or contingencies such as rework or uninsured losses. CED0006568 EXHIBIT "A" BERRY CONTRACTING. INC LABOR RATE SCHEDULE for COASTAL STATES PETROCHEMICAL COMPANY Page 5 CraftLABORERSEffective 4-1-81thru 3-31-82 MAINTENANCE RATES 10 Laborer Power Tool Operator Craft Tender or Helper 30 Labor Foreman Concrete Foreman General Labor Foreman Straight Time $10,255 10.525 10.66 11.605 11.74 11.945 Time and One Half $14.26 14.64 14.835 16.18 16.375 16.665 Double Time $18,255 18.76 19.01 20.76 21.01 21.385 if -------------------------------------------------------------------------------O------------------------------------------------------------------------- -- The above rales include wages, benefits, applicable payroll burdens such as FJ.C-A., Withholding Tax, and the premiums on insur ance, overhead and profit. These rates do not include any other costs or contingencies such as rework or uninsured losses. CED0006569 EXHIBIT "A" BERRY CONTRACTING. INC. LABOR BATE SCHEDULE for COASTAL STATES PETROCHEMICAL COMPANY Page Craft OPERATING ENGINEERS Effective 4-1-81 thru 9-30-81 Utility Operator If Heavy Equipment Operator 12 Light Equipment Operator Light Equipment Driver 1st Year Oiler 2nd Year Oiler 29 Foreman Straight Time $18.13 17.96 15.90 15.90 14.82 15.025 18.635 Time and One Half $25,215 24.975 22.04 22.04 20.50 20.79 25.935 Double m Time _mml $32,305 31.99 7-015 28.175 6>AM 28.175 26.175 26.555 33.24 The above rates include wages, benefits, applicable payroll burdens such as FJ,CA., Withholding Tax, and the premiums on insur ance, overhead and profit. These rates do not include any other costs or contingencies such as rework or uninsured losses. CED0006570