BERRY CONTRACTING, INC
Industrial Contractors
1414 CORN PRODUCTS ROAD AC 512 884-2100 TELEX 778446 -
March 31, 1981
COASTAL STATES PETROCHEMICAL COMPANY P. 0. Drawer 521 Corpus Christi, Texas 78403
Attention: Mi Ld II0TT`
Gentlemen:
The attached rate sheets for Laborers, Operators, Cement Finishers, and Ironworkers will go into effect tha first fullpayroll -period after April-^, 1981,
The rate sheet for Carpenters will go into effect April 1, 1981. Negotiations are now in progress for a wage increase for Pile Drivers. At the conclusion of these negotiations you will be furnished a revised rate sheet.
Sincerely,
BERRY CONTRACTING, INC.
enclosure
B. D. Daniels Business Development
y
CED0006565
EXHIBIT "A" BERRY CONTRACTING. INC.
LABOR RATE SCHEDULE for
COASTAL STATFS PFTR0CHFM1CAI COMPANY
CraftCARPENTERS Effective 4-1 -81thru 9-30-81
Page
2A :
14 Carpenter 1st Pd. App. 553S 2nd Pd. App. 65% 3rd Pd. App. 70% 4th Pd. App. 75% 5th Pd. App. 80% 6th Pd. App. 85% 7th Pd. App. 90% 8th Pd. App. 95% Saw Operator or Filer
19 General Foreman 13 Foreman
Straight Time
$13,145 7.76 8.96 9.555
10.145 10.755 11.35 11.945 12.55 13.315 15.17 13.82
Time and One Half
Double Time
$18,245
$23,345
10.565
13.37
12.275
15.59
13.125
16.69
13.97
17.79
14.835
18.92
15.685
20.02
16.535
21.12
17.395 " 22.245
18.485
23.66
21.13
27.095
19.205
24.595
-------------------------------------------------------------------------------O------------------------------------------------------------------ -----------
The above rates include wages, benefits, applicable payroll burdens such as F.I.C.A., Withholding Tax, and the premiums on insur ance, overhead and profit. These rates do not include any other costs or contingencies such as rework or uninsured losses.
CED0006566
EXHIBIT "A" BEEBY CONTRACTING. INC.
LABOR RATE SCHEDULE for
COASTAL STATFS PFTRQCHEMICAL COMPANY
Page 3A
Craft rrWFNT ftntchfpsEffective fl-i.flithru
9-30-81
MAINTENANCE RATES
Finisher Foreman Machine Operator 1st 6 mo. App. 60% 2nd 6 mo. App. 70% 3rd 6 mo. App. 80% 4th 6 mo. App. 90%
Straight Time
$15.32 15.945 15.66 9.195 10.73 12.26 13.795
Time and One Half $21,845
22.735 22.33 13.11 15.30 17.48 19.67
Double Time
$28.37 29.525 29.00 17.025 19.87 22.70 25.55
------------------------------------------------------------------------------- o------------------------------------------------------- ------------- -
The above rales include wages, beneiits, applicable payroll burdens such as FJ.C-A-. Withholding Tax, and the premiums on insur ance, overhead and prolil. These rates do not include any other costs or contingencies such as rework or uninsured losses.
CED0006567
EXHIBIT "A" BERRY CONTRACTING. INC,
LABOR RATE SCHEDULE for
COASTAL SIATFS PFTRflCHFM.I CAL,Jill
Craft
IRONMORKFRSEffective 4-1-81thru 5-31-81
Page____ 4A
Ironworker 1st Pd. App. 60% 2nd Pd. App. 70% 3rd Pd. App. 75% 4th Pd. App. 80% 5th Pd. App. 85% 6th Pd. App. 90% General Foreman Foreman .
Straight Time
$16,995 11.045 12.53 13.285 14.025 14.77 15.51 21.83 21.045
Time and One Half $23.33
14.845 16.695 18.04 19.095 20.155 21.215 30.225 29.105 -
Double Time
$29.67 18.645 21.395 22.795 24.17 25.545 26.92 38.62 37.17
-------------------------------------------------------------------------------o------------------------------------------------------------------------------
The above rates include wages, benefits, applicable payroll burdens such as FJ.C.A.. Withholding Tax, and the premiums on insur ance, overhead and prolit. These rates do not include any other coats or contingencies such as rework or uninsured losses.
CED0006568
EXHIBIT "A" BERRY CONTRACTING. INC
LABOR RATE SCHEDULE for
COASTAL STATES PETROCHEMICAL COMPANY
Page
5
CraftLABORERSEffective 4-1-81thru 3-31-82 MAINTENANCE RATES
10 Laborer Power Tool Operator Craft Tender or Helper
30 Labor Foreman Concrete Foreman General Labor Foreman
Straight Time
$10,255 10.525 10.66 11.605 11.74 11.945
Time and One Half $14.26
14.64 14.835 16.18 16.375 16.665
Double Time
$18,255 18.76 19.01 20.76 21.01 21.385
if
-------------------------------------------------------------------------------O------------------------------------------------------------------------- --
The above rales include wages, benefits, applicable payroll burdens such as FJ.C-A., Withholding Tax, and the premiums on insur ance, overhead and profit. These rates do not include any other costs or contingencies such as rework or uninsured losses.
CED0006569
EXHIBIT "A" BERRY CONTRACTING. INC.
LABOR BATE SCHEDULE for
COASTAL STATES PETROCHEMICAL COMPANY
Page
Craft OPERATING ENGINEERS
Effective
4-1-81
thru 9-30-81
Utility Operator If Heavy Equipment Operator 12 Light Equipment Operator
Light Equipment Driver 1st Year Oiler 2nd Year Oiler 29 Foreman
Straight Time
$18.13 17.96 15.90 15.90 14.82 15.025 18.635
Time and One Half $25,215
24.975 22.04 22.04 20.50 20.79 25.935
Double
m
Time _mml
$32,305
31.99 7-015
28.175 6>AM
28.175
26.175
26.555
33.24
The above rates include wages, benefits, applicable payroll burdens such as FJ,CA., Withholding Tax, and the premiums on insur ance, overhead and profit. These rates do not include any other costs or contingencies such as rework or uninsured losses.
CED0006570