SUMMARY
1 - Draft contingency plans as assigned at the October 9 meeting were reviewed for content and consistency.
2 - SPI staff and legal counsel will edit the draft contingency plans to provide uniform format and consistency.
These edited drafts will be reviewed by the Alternatives Committee in late January or early February prior to submission to the FVC Safety Group's Steering Committee.
it it it it
ATTENDEES:
William C. Becker - ACTING CHAIRMAN - B. F. Goodrich Company, 6100 Oak Tree Blvd. Cleveland, OH 44131
Gary H. Baise - Beveridge, Fairbanks & Diamond, 1333 New Hampshire Avenue, N.W. Washington, D.C. 20036
John T. Barr - Air Products & Chemicals, Box 538, Allentown, PA 18105 John Eldred - Keller & Heckman, 1150 17th Street, N.W. Washington, D.C. 20036 John E. Ertel - Pantasote Inc. 250 Hamburg Turnpike, Butler, NJ 07405 H. R. Flammer - Conoco Chemicals Company, 5 Greenway Plaza East, Houston, TX 77001 Terry Flannery - B. F. Goodrich Company, 6100 Oak Tree Blvd. Cleveland, OH 44131 John C. Floros - Great American Chemical Company, 650 Water Street, Fitchburg,
MASS 01420 Gary Ford - Stauffer Chemical Company, Westport, Ct 06880 Robert W. Fortenbach - Shell Chemical Company, One Shell Plaza, Box 4320
-- Houston, TX 77210 Jerome H. Heckman - Keller & Heckman, 1150 17th Street, N.W. Washington, D.C. 20036 Milton Kline - Borden Chemical Company, 511 Lancaster St. Leominster, MA 01453 Peter De LaCruz - Keller & Heckman, 1150 17th Street, Washington, D.C. 20036
John R. Lawrence - SPI, 355 Lexington Avenue, New York, NY 10017 P. E. Roggi - Stauffer Chemical Company, Westport, CT 06880
THE SOCIETY OF THE PLASTICS INDUSTRY, INC. 355 Lexington Avenue New York, N.Y. 10017 ....... (212)573-9400
gpj-11952
-2
.1 Mr. Becker, Acting Chairman, opened the meeting with self introductions
and suggested that each of the draft contingency plans be reviewed. 2. Clean Air Act -
After considerable discussion, it was agreed that the following three items be added to the original four Anticipatory Action Pnderway items:
-- Assessment of existing standard in terms of whether it is needed from a public health standpoint.
-- Determination of cost of continuing existing standard through 1986 in light of EPA's estimate.
-- Identify targets in government and congress to which industry views should be made known.
3. The Resource Conservation and Recovery Act (RCRA) Mr. Ford reviewed his RCRA contingency plan. He pointed out possible problems with respect to VCM appearing in mixture systems.
4. Clean Water Act (CWA) In discussing the CWA activities, the newly available EPA Vinyl Chloride Water Criteria Document was distributed. It was agreed that Keller & Heckman should attempt to determine how EPA plans to use this document and how comments and corrections can be submitted. It was further suggested that the PVC Health Committee should review this new criteria document.
5. General It appears that all of the contingency plans might be supplemented to present an action plan in the event that there is no regulatory action or a significant delay in the present review process. Mr. Becker suggested that some consideration be given to monitoring pre emption activities by states which would place additional compliance burdens on the industry. He also suggested special attention be given to alternatives in combustibility issues. Other suggested Issues that might be considered were cited as transportation and labeling.