Document a1aOy7ExGwz2mmVRdZaqEbwa
REPORT UPON SEPARATION OF SEWERS
IN THE
VILLAGE OF MONSANTO MONSANTO, ILLINOIS
FOR MONSANTO CHEMICAL COMPANY
March 15, 1962
Jos. W. Goldenberg --' L " Consulting Engineer East St. Louis, Illinois
PLAINTIFF'S DEPOSITION , EXHIBIT ,
- bcu)
VS0533 WATER PCB-SD0000005196
PENGAD*Byonne N. i.lt
JOSEPH W. GOLDENBERG
CONSULTING ENGINEER
INDUSTRIAL -- STRUCTURAL MUNICIPAL
PHONE BRidn 1-4337
March 15, 1962
Monsanto Chemical Company Engineering Department Organic Chemicals Division 1700 South Second Street St. Louis 77, Missouri Attention: Mr. R. 0. Nellums, Assistant Director Gentlemen:
Subject: Engineering Investigation of Monsanto Village Sewer System.
In accordance with our proposal of November 30, 1961 and your letter of authorization cf December 1, 1961, we are submitting herewith the copies of our report on the Proposed Dual Sewer System in the Village of Monsanto.
Very truly yours,
Jos. 1-7. Goldenberg
WATER PCB-SD0000005197
J 3SEPH W. GOLDENBERG
CONSULTING ENGINEER
PHONE BRidie 1-4337
INDUSTRIAL -- STRUCTURAL MUNICIPAL
EAST ST. LOUIS, ILLINOIS
March 15, 1962
Monsanto Chemical Company Engineering Department Organic Chemicals Division St. Louis 77, Missouri
Attention: Mr. R. 0. Nellums, Assistant Director
Gentlemen:
In accordance with our decussion, we have made a cost analysis of a minimum program of sewer construction which would only alleviate flooding conditions in the plant areas of both Lewin-Hathes Company and Mobil Oil Company. This program has been under consideration for
several years but has been deferred pending possible inte-ration into the overall Village of Monsanto Pollution Abatement Project.
Location M. H. to M. H.
Estimated Construction Cost
9-7-3-19
$ 279,000
28D - 23A
22,000
28C - 2h
92.500
Conn, to U.S.C.E. Station
51.500
Total Estimated Construction Cost $ Uii5,000
Engineering and Contingencies
89,000
Financing, Legal & Admin. Costs
16,000
Total Estimated Capital Cost
$ 550,000
Very truly yours
WATER PCB-SD0000005198
CONCLUSIONS AND RECOMMENDATIONS
The objective of tills report is the determination of methods and costs for converting the existing Village of Monsanto Sewer System to a dual system which would permit the separate collection of segregated wastes.
The nature of existing sewage facilities outside and within the respective industrial plant areas make it apparent that stormwater runoff will constitute a major factor in any recommended plan elected. Accordingly, various studies were made and several plans submitted together with the overall effects of an estimated 5 year frequency rainfall compared with the effects of an intermediate, less-intense rainfall.
As a result of this study, it appears that the present Village of Monsanto sewers can feasibly be converted into a dual system of sewers. With the exception of Plan "A", any of the remaining plans submitted may be adopted to achieve this result.
Unless extensive in-plant sewer changes are made, stormwater will materially affect the design of the sewers and treatment facilities. This is particularly true of the sewers serving Lewin-Mathes Co., Mobil Oil Co., and Monsanto Chemical Co., who are major contributors of treatable wastes. This can be observed by comparing the tables containing dry weather flows with those containing dry weather flows plus stormwater runoff. In general, sewers will flow part full during dry weather, but will be surcharged during periods of rainfall - varying with the intensity.
(ii)
WATER PCB-SD0000005199
The plan to be adopted depends upon the individual economy and willingness to accept certain inconveniences on the part of each industry* Plan "B"* This plan* while more costly than other plans submitted, seems more desirable for long range planning. The plus values include: Lower percentages of stormwater entering the treatable waste sewers; newer construction available for the more corrosive treatable wastes; Dead Creek ' not required for emergency ponding of treatable wastes during periods of heavy rainfall. The minus values include: Greater capital expenditure; construction and operation of a new punping station for treatable wastes; difficult segregation of treatable waste laterals in Monsanto Chemical Company main plant area.
The adoption of Alternate No. 1 would be a desirable variation to Plan "B". This alternate involves a change in location of the treatable waste sewer serving Mobil Oil Co. and a probable reduction in capital ejp enditure
The adoption of Alternate No. 2. would also be a desirable variation to Plan "B". This alternate involves a change in location of the clear water sewer serving Mobil Oil Co. - similar to Alternate No. 1 above. Plan "B-IA". This plan is based on a rainfall of lni per hour as compared to 1.8" per hour in Plan HB", other than this the plan is quite similar to Plan "BB except that only one new 36" treatable waste sewer is proposed through the Main Plant area of Monsanto Chemical Co., rather than two. The clear water systems are the same in both plans mentioned above*
(ill)
WATER PCB-SD0000005200
While this plan involves less treatable waste sewer construction to achieve a dual system, its capacity for stormwater is greatly reduced and will result in periodic flooding of the areas served by the sewer which include Monsanto Chemical Co, and Lewin-Mathes Co..
We do not feel that the saving to be realized in this plan is warranted, and do not recommend its consideration. Flan wCn. A basic difference between Plan "C" and Plan "B" lies in the designation of existing sewers for treatable wastes under this plan, and the construction of new sewers for clear water; this is contrary to Plan "B".
This plan, while requiring a lower capital expenditure than Plan "B", does not appear to be as desirable for long range planning. The plus values include; lower capital expenditure; no pumping station for treatable wastes required - as in Plan "B"; simpler reconnections of existing sewers in Monsanto Chemical Co, main plant area. The minus values include: Use of Dead Creek as an emergency pond for treatable wastes plus stormwater; larger percentages of stormwater would enter the treatable waste sewers.
The effect of greater quantities of stormwater in the treatable waste sewers would have to be investigated in the treatment plant study. Flan "C-l". This plan is based on a rainfall of 1" per hour - as compared to 1,8" per hour in Plan "C"; accordingly, fewer and smaller
(iv)
WATER PCB-SD0000005201
sewers are required. This is particularly true in the clear water system which in this plan constitute the sewers to be constructed.
The additional sewers along Monsanto Avenue for clear water have not been proposed in this plan because the basis for runoff has been taken at 1" per hour. However, it may be desirable to construct these sewers to improve the flooding condition which would occur during varying periods of rainfall.
(v)
WATER PCB-SD0000005202
TABLE OF CONTENTS.
Letter of Transmittal
Conclusions and Recommendations
Table of Contents
Purpose and Scope of Study
Summary of Plans
List of Abbreviations
Basic Information and Data
General Information Related to All Plans:.
Proposed Plans
Plan "A" Flan B
Alternate No. 1 "B-Al"
Alternate No. 2 uB"A2n
Plan "B-1A"
--
Plan C" -
Plan "C-ln
General Information Related to Tables
List of Tables
Tables
List of Plans
Plans
Cost Data Acknowledgements
Page No. i ii -v vi 1 2 3 h 17
18 20 23 2h 25 26 29 30 32 . 33 -
^
(vi) WATER PCB-SD0000005203
PURPOSE AND SCOPE OF STOUT
Purpose of Study. The purpose of this study is to detennine the feasibility and estimated cost for providing a dual sewer system to serve the industries in the Village of Monsanto. One portion of this system would be designated for the collection of foul water wastes and would convey these to a new Village Treatment Plantj the other portion would collect such clean water wastes not requiring treatment and convey these to a new pumping station proposed by the U.S. Corps of Engineers.
The new pumping station would also receive the effluent from the Village Treatment Plant and discharge the combined wastes to the Mississippi River.
Scope of Study. The study covers an investigation of the present Village of Monsanto sewer system which serves the entire developed area of the Village including the industries and will determine:
(a) Additional sewers required to establish a dual system where the present system is not suitable or adequate for this purpose.
(b) Changes required to convert the present combined single system to a dual system.
The original criteria for this study were supplied by Mr. C. N. Stutz of Monsanto Chemical Company and contained estimated flows of both foul water wastes and clean water wastes from each of the Industries within the Village.
(1)
WATER PCB-SD0000005204
SUMMAHZ OF PLANS
Report. This report was prepared to submit several plans for accompli shins the dual system of sewers and Indicate the factors, both physical and economic, related to each plan. The following plans and alternates were investigated and reported:
Plan nAn This plan entails the separation of existing multiple sewers with the addition of a minimum of new construction, as required to create a dual system. Plan "B" This plan in general designates a major portion of the existing sewers, for clean water wastes and includes the construction of new sewers for foul water wastes. This plan takes into account the effect of a 5 year frequency rainfall or Itfjj inches per hour for 15 minute duration which is couparable to a rainfall intensity of 1.8 inches per hour. There are two alternates to this plan - Alternate No. 1 & Alternate No. 2. Plan ^B-IA" This plan is the same as Plan "B" except that the ' rainfall effect is arbitrarily based on an intensity of 1.0 inches per hour, and Alternate No. 1 having been adopted. Plan nCn This plan designates, the existing trunk sewers in the south plant area of Monsanto Chemical Company for foul water wastes, taking into account the effect of a rainfall intensity of 1.8 inches per hour - as in Plan "BM. Flan "C'-l* This plan is the same as Plan "C" except that the rainfall effect is arbitrarily based on an intensity of 1.0 inches per hour.
(2)
WATER PCB-SD0000005205
M.H. In. Hr. F L. Elev. cfs Vel. fps FT2R.O. Coef. gpm gph mgd gpd
LIST OF ABBREVIATIONS
Manhole or Interceptor Inches Hour Flow line Elevation Cubic feet per second Velocity Feet per second Square feet Runoff Coefficient Gallons per minute Gallons per hour Million gallons per day Gallons per day
(3)
WATER PCB-SD0000005206
BASIC INFORMATION & DATA
Initially a review was made of all existing plans and reports to correlate any possible discrepancies between the Village maps, Metcalf & Eddy Report of I960 and the Horner & Shifrin Report of 1952* Some questions were resolved by actual field checking - including the location of certain inlet structures not heretofore indicated. Conferences were held with representatives of industry for the purpose of determining the following:
1* The extent of in-plant change and any quantitative change in the sewage flow,
2, The extent of in-plant separation of wastes completed and/or contemplated,
3, Projected future expansion, lu Stormwater drainage facilities and relationship to the
sewer system. Following are the conditions and information tabulated for each of the industries: American Zinc Co,: According to the I960 M&E Report the average daily flow from American Zinc Plant into the Village sewers is about 5.U2 mgd. However, American Zinc Company is planning a separation of wastes aaiside the plant, and the future flow into the sewers would be sanitary flow, approximated at 20,000 gpd* (to obtain peak hourly flow for sewer design this is multiplied by 1,35), the remaining waste would be clear water which could by-pass, the proposed treatment facilities*
(U)
WATER PCB-SD0000005207
The amount of clear waste as given by Hr. C. N. Stutz-. of Monsanto Chemical
Conpany is B.h mgd., but according to Mr. R. K. Carpenter of American
Zinc Company the figure after the separation would be h.S mgd.. However,
the planned expansions within the next 3 to $ years would bring this
figure back up to about
mgd. - so the latter figure is used in this
report. Since this flow is constant, the maximum hourly flow is assumed
equal to the average hourly flow for sewer design.
According to Mr. Carpenter all storm water inside the American
Zinc Plant flows northward and is ponded in an area North of the Plant
and East of Route 3 - (see Ponding Map). There are no stormwater
connections to the Village sewers, and none are contemplated.
It should be mentioned that, since the sewer connections from
American Zinc are about l\ ft. above the Village sewers, the plant has
not experienced any difficulty due to surcharge of sewers during heavy
rainfall.
Darling Fertilizer Co.: The status of sewers at Darling remains the same as previously reported in the i960 M&E Report and no changes are contenplated. The wastes are essentially sanitary and the quantity is given as 1;2,000 gpd. The maximum hourly rate used in design is 3h gpm in north sewer and 11 gpm from east sewer - these figures are based on M&E Report,
According to Mr. H. L. Stangel of Darling, all storm water is ponded west of the buildings as shown on the Ponding Map. The parking lot adjacent to Route 3 has a yard drain, which may drain into the sewers, accordingly a nominal amount of runoff has been added for this area.
(5) WATER PCB-SD0000005208
Lewin-Mathes Co.: The total sewage flow from Lewin-Mathes Co. is given as 2.98 mgd. However, they are planning water conservation and separation inside the plant which would reduce the average sewage flow1 to about 2 mgd.
Approximately 1.0 mgd. of this would go through their present lift station, thence to the Route 3 sewersj this flow to Route 3 would ultimately be clear water even though at the present time there are some sanitary sewers connected to this line. These will be disconnected and directed to the treatable waste sewer inside the plant. There is a fluctuation of flow in this line. The maximum hourly flow of 96,500 gph is the figure used as the basis for design.
Approximately 300,000 gpd of clear waste will be discharged into the 2V* sewer going to Dead Creek and the flow is expected to remain constant.
Approximately 700,000 gpd of treatable waste from Lewin will be discharged toward Dead Creek. The 15" sewer (called Control Building Sewer in M&E Report) will have a maximum hourly flow of approximately 1*3,100 gph and the 15" sewer designated as Village Lift Station sewer in the MSE Report will have a maximum hourly flow- of approximately 73* 1*00 gph. These maximum values are used in this study. Information relative to flows was supplied by Hr. K. Guth of the Lewin-Mathes Company.
(6)
WATER PCB-SD0000005209
The stormwater drainage at Lewin presents a problem. Each of their sewers carries a certain amount of runoff water. The separation of inlets and drains from the treatable waste sewers inside the plant is not feasible. Since the potential amount of stormwater in the treatable waste sewer is substantial, the size of sewers serving Lewin is governed by stormwater flow. The areas and runoff tributary to each sewer are shown on a separate sheet.
A large area of the plant drains into a ponding area as shown on Ponding Map. The strictly storm sewers from Lewin along Dead Creek are not int .:.'c ..ptea and Dead Creek is presumed to act as drainage ditch and/or ponding reservoir.
Vf I
(7) WATER PCB-SD0000005210
Lewin-Mathes Company
Stormwater Distribution and Runoff into the Sewers (From data supplied by K. Guth)
Line
Size
Area
.
in Ac. I(R.O.Coef) R(In/hr) Q(cfs) R(In/hr) Q(cfs)
Mississippi
Ave.
2i|"
5.0
0.7 1.8 6.2 1.0 3.4
Control Building 15"'
iu6
0.7 1.8 5.8 1.0 3.2
Village Pump Sta. 15"
2.5
South of ,
Plant Road
to Dead
Creek
30" & 8"' 2.3
C3XI
H CXI3
Dead Creek
0.9
Dead Creek 2it"
3.1
Dead Creek 12"
1.2
0.7
1.8 _3.i
S\
\- '
1.0
1.7
'i. 1
0.7 1.8 2.9* 1.0 1.6*
0.7 1.8 1.1 * 1.0 0.6*
0.7 1.8 3.9 * 1.0 2.2*
*
CoO.
0.3 1.8
1.0 o.5*
Q. " AIR (Basic runoff formula)
* Denotes discharge of stormwater into Dead Creek - not included in sewer design.
(8) WATER PCB-SD0000005211
Midwest Rubber Co : According to the I960 M&E Report the average flow of sewage from Midwest is about 3.6 ingd. and according to the information given by Mr. Stilts of Monsanto Chemical Company this flow would be reduced to 0,6 mgd. clear waste and 20,000 gpd of sanitary waste. However, in conference with Messres. H. R. Erwin and C. D. Smith of Midwest Rubber, it was established that so far the flow has been reduced by 1*0 percent which would decrease the flow to about 2.1 mgd. (this is constant and maximum is equal to average) and there are no plans for further reduction. This quantity would be clear waste which could by-pass the Treatment Plant. In addition there would be a flow of 15,000 gpd of sanitary waste, and the possibility that 60,000 gpd of treatable waste would be added. This total of 75,000 gpd is assumed to enter the treatable waste line to obtain maximum hourly flow for sewer design - a factor of 1.35 was used.
Much of the stormwater from Midwest goes to the ponding area west of the Darling Plant as shown on the Ponding Map, however an estimated area of 5 acres of roof and paved areas is assumed tributary to the exist ing sewers. The storm runoff is computed as follows (Using Q ** Air):
Rainfall A(Area in Acres) I (R.O. Coefficient) (Inch/hr) Q.(cfs)
l8n/hr
5
x 0.7
x 1.8 - 6.3
M
o
l,On/hr
5
x
1.0 - 3.5
(9) WATER PCB-SD0000005212
Mobil Oil Company: Mobil Oil Company sewer conditions remain the same as reported in the I960 M&E Report and the company does not plan any appreciable changes. Most of the sewage is collected in Plant Sump No. I4. which is equipped with 1-1500 gpm pump and 1-5000 gpm pump. The smaller pump is apparently adequate for dry weather flow - and both pumps discharge through the A.P.I. separators into the Village sewers. Another 200 gpm from lime sludge, cooling tower and steam blow downs which is considered clean by-passes the pump and the separators and is discharged directly to the sewers. During periods of rainfall the 5,000 gpm pump supplements the smaller pump. In addition to this approximately 800 gpm of storm water can by-pass the sump to the discharge side of the pumps. Areas tributary to the sewers in the Mobil Refinery are appreciable and estimated at 65 acres of roof and paved areas by the Plant engineers. A slight rainfall will result in a runoff equal to the capacity of the larger pump. Since Mobil Oil does not plan to increase the pumping capacity for stormwater runoff the sewer design is based on 6000 gpm of clear waste.
Plant conditions do not allow the separation of storm water run off from treatable waste. Sump No. k is arranged so that 1-1500 gpm pimp will operate at all times and will discharge to the treatable waste systen? as the quantity of wastes exceed the smaller pump capacity because of stormwater runoff, the 5000 gpm pump will start operating and discharge into the proposed clear water system. It is believed that the treatable waste will be diluted to the point that the portion
(10) WATER PCB-SD0000005213
going through clear water system can by-pass the treatment plant. This will be explored farther by Metcalf & Edcfy. It should be stated that the present sewer proposal is based on a flow of 6000 gpm in clear water system and 2000 gpm in treatable waste which is the inaxiraum expected in the future. Should future qualitative study show that additional pumps: for treatable wastes must be installed to insure sufficient dilution, the proposed sewers will have to be modified to provide adequate capacity.
Monsanto Chemical Co.: Monsanto Chemical Co. plans substantial revisions in their internal plant sewer system which will result in a separation of treatable from clear wastes within their plant. The quantity and nature of waste flow at each point is given in the accompanying table. All values for process wastes were provided by Mr. C. N. Stutz and R. H. Young of Monsanto Chemical Co.. The values given are average values and apparently do not vary appreciably from maximum - so they were used in the sewer design. Most of the sewer outlets carry storm water as well as clear or treatable wastes. According to the information available from Monsanto Chemical Co. engineers, conplete separation is not feasible; as a result, the storm water flow governs the design of most of the sewers - as indicated in the tables. There are substantial areas in North Plant from which the stormwater does not enter the sewers but flows northward to the ponding area as shown on the Ponding Map.
(n)
WATER PCB-SD0000005214
Monsanto Chemical Company
Stormwater Distribution and Runoff into the Sewers (From data supplied by R. H. Young)
Pipe Area Location Size (Acres) l(R.0.Coef.) R(ln/hr) Q(cfs) R(In/hr) Q(cfs)
CD CD
y M.H. h-& 18" 1.0 0.U6
0.7 0.15
tH
H
1.1*
1.0) 1.0)
0.8
J M.H. 5 -^
J M.H. 5
2h" 0.18 0.23
18" 1.68 U.6o
0.7 0.15
0.7 0.15
1.8) 1.8)
1.8) 1.8)
0.3 3.U
1.0) 1.0)
1.0) 1.0)
0.2 1.9 *
. r*cM-H-6
^M.H. 8 0-T ' M.H. 20
18" -
2-12"
15" Sc 18"
1.3 2.3
U.U8
2.06 0.92
0.7 0.15
0.7
0.7 0.15
1.8) 1.8)
1.8
1.8) 1.8)
2.2 5.7 2.Q
1.0) 1.0)
1.0
1.0) 1.0)
1.2 3.2 1.6
M.H. 21
15"
Sc 2k"
2.13 1.38
0.7 0.15
1.8) 1.8)
3.1
1.0) 1.0)
1.7
M.H. 22
2k" 0.35 1.15
0.7 0.15
1.8) 1.8)
0-7
1.0) 1.0)
o.U
M.H. 23
18" 0.69
o.i5
1.8 0.2 1.0 0.1
M.H. 23-A M.H. 2k
18" 8"'
0.02 0.01
0.7 0.7
1.8 0.02 1.0 1.8 0.01 1.0
-
M.H.r 26
2k" 9.U - 5.18
0.7 0.15
1.8) 13.3 1.8)
1.0) 1.0)
7Ji
M.H. 26-A 30"
2.8 3.U5
0.7 0.15
1.8) 1.8)
U.5
1.0) 1.0)
2.5
Q " AIR (Basic runoff formula)
(12) WATER PCB-SD0000005215
Monsanto Chemical Company
Distribution of Treatable and Clear Water Wastes in Various Areas Derived from data furnished by Monsanto Chemical Company
location
Pipe Size
M.H. ii-A
18":
M.H. 5
2U"
M.H. 5
18"
M.H. 6
2U"
M.H. 6
18"
M.H. 8
2-12"
M.H. 20 15"&18" ,
M.H. 21 l5"&2li"
M.H. 22
2ii"
M.H. 23
18"
M.H. 23-A 18"
M.H. 2U
8"
M.H. 26
2lp
M.H. 26-A 30"
Clean Waste (cfs)
0.22 -
2.01 -
3.8 -
li.0 -
11.5
Treatable Waste (cfs)
0.95
1.3U
1.73 1.0 0.11 0.22 9.80 -
Runoff 1.8 In/h
0.3 3.2+
2.2 5.7 2.9 3.1 0.7 0.2 0.02 0.01 13.3 iu5
(cfs) 1.0 In/h
0.8 0.2 1.9 *
1.2 3.2 1 6 1.7 0.I4. 0.1
7.U 2.5
The above 1data is used as the basis for design in Plan "B". In Plan "C" the clear waste flow-from manholes 22, 23-A and 26-A is diverted Northward by Monsanto Chemical Company and intercepted at manholes 38* 37 and 36 respectively.
(13) WATER PCB-SD0000005216
* As this report was being completed, we were informed by Mr. R. H. Young of Monsanto Chemical Company that the 18" sewer from the North Area entering M.H. #5 carries treatable waste as well as stormwater - not just storm water as we were originally informed. Accordingly, this line must be intercepted and brought into the treatable waste system, as indicated on the Plans - but not carried into the tables. Proper flow adjustment must be made in the tables to correct the hydraulic gradients for this revision.
(Hi) WATER PCB-SD0000005217
T. J. Moss Tie Co,
Moss Tie Co. has no sewer connection at this time,
and none is planned in the foreseeable future. There is an extention of
the Village sewer into the Company*s yard but there have been no connections
made. All the sanitary and process wastes as well as stormwater are ponded
inside the Plant Area as shown on the Ponding Map.
Sterling Steel Co.r The status of sewers at Sterling Steel Co, is the same as described in Metcalf & Eddy Report of I960. There are no con templated changes which would materially affect the maximum sewer flow of 100,000 gpd. This consists of sanitaiy wastes and some cooling water. There is an area approximately 0.57 Acre of roof and paved area which drains into the Treatable Sewer System.
A (Area in Acres)
I(R.O. Coefficient)
R.0. (In/h)
Q(cfs)
1.8
In/hr
0.57
X
0.7
X 1.8 - 0.73
1.0
Ih/hr
0.57
X
0.7
X 1.0 o.U
The remainder of the stormwater from Sterling Steel Co. plant is ponded inside the plant in the areas shown on the map. There are no plans for future stormwater connections to the sewer system. .
Q = AIR (Basic runoff formula)
(15) WATER PCB-SD0000005218
Village Residential Area - School & Village Hall: There is a flow of sanitary waste from this area into the existing sewer system which will discharge into the treatable waste system. The population of this area is estimated at 2l|.0. Based on 100 gpd/Capita, the sanitary waste will amount to approximately 0.05 cfs.
There are stormwater inlets on Little Avenue, Queeny Avenue and Nickle Street. In addition, the Village Hall parking area is paved and a portion drains into the sewer system. Total runoff from this area is estimated at 7.0 cfs. No storm sewers are proposed for this area since the amount of runoff is small compared to the overall figure for the entire village. The cost of new sewers and the separation of stormwater runoff from sanitary waste would not be feasible at this time.
Monsanto Avenue; There are a number of street inlets along Monsanto Avenue connected to the existing sewer. The total runoff between 19th Street and Route 3 is estimated at I4..2 cfs. This amount is divided between about 15 inlets.
Manchester Subdivision? Estimating the population of this area at 110 - and a per capita flow of 100 gpd - the sanitary wastes win amount to approximately 0.02 cfs. Stormwater runoff is estimated to be 2.0 cfs and win enter the sanitary sewer.
The existing connection to the sewer is quite low - accordingly a portion of sewer will be replaced to provide a connection to the proposed treatable waste sewer as indicated in the tables.
(16)
WATER PCB-SD0000005219
General Information Related to All Flans
All plans include the utilization of the existing Village Pimping
Station as a lift station for wastes to be treated in the proposed new
treatment plant and the construction of a new pumping station by the
U. S. Corp. of Engineers of sufficient capacity to handle both the
effluent from the treatment plant and the clear water wastes** The
proposed location of U.S.C.E. Puu$> Station is to the North and the
treatment plant to the South of existing pumping station*
Source
Treatable Clear
Runoff
Waste (cfs) Waste (cfs) 1*8 in/hr 1.0 in/hr
American Zinc Co.
0*03 (O.Oil Max.)
8.U
--
Darling Fertilizer Co,
0.06 (0.1 Max.)
-
1.8 1.0
Lewin-Mathes Co.
1.1
(ii.3 t Max.)
2.0 (il.O Max.)
13.9 *
8.8 *
Midwest Rubber Co.
0.12
.
(0.16 Max.)
3.3
6.3 3.U
Mobil Oil Co.
iu3
-
13.ii
13.ii (+)
Monsanto Chemical Co. Sterling Steel Co.
19.2 0.16
21.3 -
37.6 0.7
21.0 O.ii
Village Residential Area 0.0li
- 7.0 3.9
Monsanto Ave.
-
Manchester Subdivision 0.02 Total 2iu3
-
-
37.2.
i|.2 2.0 89.0
2.3 1*1 33.3
Not including 7.9 cfs for 1.8 inch per hour or t3.ii cfs for 1.0 inch per
hour draining into
Dead Creek.
(*) Approximately
(*) See page 29
All discharge values for process waste are average unless noted otherwise*
(17) WATER PCB-SD0000005220
PLAN "A" (Tables No. 1 and 2)
This plan consists of converting the existing system of sewers into a dual system with a minimum of new sewer construction. The dual system would provide separate collection of wastes to be treated at the new Village Treatment Plant and those clear water wastes which could by-pass treatment and be discharged directly into the river.
Revisions at junction box (2) can be made to separate flows entering and leaving - designating the northerly sewers for clear wastes and Connecting into the new U.S.C.E. Pumping Station, while the southerly sewers would convey the wastes to be treated into the present Village Pumping Station - thence into the new treatment plant.
It will be necessary to construct certain new sewers along Monsanto Avenue between State Route 3 and the main plant entrance of Monsanto Chemical Company - as indicated on the plan (due to the fact that a single line serves this area now). Since there are a number of street inlets connected into the existing sewers, and the wastes to be treated are appreciably less than the clear water wastes, it is more feasible to designate the new sewer for wastes to be treated - making the necessary reconnections indicated on the Plan. , (As may be seen in the tables, the new sewer is at higher elevation and the connection can cross over the existing sewer).
It will also be necessary to construct: A new 36" sewer between (2) and (10) for treatable wastes; an inverted siphon in the clear water line around interceptor (10); two new sewers along Dead Creek to provide
(18)
WATER PCB-SD0000005221
both a clear water and a treatable waste outlet for Lewin-Mathes Company. Certain existing sewers have been designated for use based on
geographic location rather than size, to facilitate separation of wastes without the construction of inverted siphons or complex structures.
In referring to Tables No. 1 and 2 it will be apparent that this minimum plan will result in a system subject to substantial surcharges in the treatable waste sewers - and to a lesser extent in the clear water sewers. Since this plan is inadequate for dry weather flows it doesn't seem prudent to investigate the effect of stormwater and no cost study was made.
(19) WATER PCB-SD0000005222
PLAN "B" (Tables 3* U> 5 and 6)
This plan consists of designating a major part of the existing sewers for clear water collection and constructing the necessary new sewers for the collection of wastes to be treated. This plan concept was investigated for the following reasons:
1. The existing sewers and structures have been in use for a number of years and their overall condition relative to corrosion resistance - particularly in the structures - is not well known.
2. This system is not dependent upon Dead Creek as an emergency ponding reservoir of combined runoff and wastes to be treated
during a $ year frequency storm. (Emergency ponding in Dead
Creek during heavy rainfall is essential to Plans WC" and "C-l"). Dead Creek will have to be available as a drainage ditch for Lewin-Mathes Company in all plans.
3. Approximately bh percent of total stormwater runoff will enter the treatable waste system compared with $0% in Plan "CH (see Tables U, 6, 9 and 11 - Col. 12).
Treatable Waste Systems Junction box (2) can be revised to separate flows entering and leaving - designating the existing U - 36" sewers for clear water wastes and constructing 2 - 36"- sewers between (2) and the pumping station for treatable wastes - (see Plan).
(20) WATER PCB-SD0000005223
To avoid crossing interference, the two new sewers through the main plant area of Monsanto Chemical Company have been indicated at a lower elevation than the existing sewers. This necessitates construction of a Lift Station near (10). The sewers from Sterling Steel Company and the residential area of the Village as well as a new sewer for treatable wastes from Lewin-Mathes Co. would be re-directed into these new sewers.
New sewers are to be constructed to both Midwest Rubber Co. and the northern Village area which includes Manchester Subdivision, American Zinc Company, Monsanto Chemical Company*s - North Area, and Mobil Oil Company. This new sewer is at a higher elevation than the existing sewer to permit reconnecting without interference. The 12** sewer to Midwest Rubber is necessary due to reduced amount of treatable waste and low velocityj which is also true for the subsequent plans with lower rainfall intensities. Clear Water System; The I; - 36" sewers between (2) and the pumping station are designated for clear water wastes. Actually only 3 lines are required, but it is felt that the cost of diverting one of those multiple lines to the treatable waste system would offset any saving which might be realized by constructing only one new treatable waste sewer between (2) and the pimping station.
From (2) to (9) all existing sewers are designated for clear water wastes. The hydraulic gradient shown in Table 6 (See lines U to 13 of Table 6) is hypothetical - since the sewer between (2) and (9) has little additional capacity available for stormwater - (see Table 5, Lines Ij. and 5).
(21)
WATER PCB-SD0000005224
Any appreciable rainfall results in ponding due to inadequate sewer capacity, Heavy rainfall results in flooding on the North side of Monsanto Avenue in the Monsanto Chemical Co, parking area, to some extent in the North Plant Area of Monsanto Chemical Company and in the Mobil Oil Company ditch along 19th Street, This last is a condition with which the affected industries are familiar. Some relief will be realized by the construction of the new sewer for wastes to be treated. To provide a system adequate for a E> year frequency rainfall, optional Alternate No, 2 is submitted,
A box will be provided at the 12n! clear water sewer along Dead Creek to divert the stormwater from the Lewin 214.*' outfall into Dead Creek, A total of approximately 8 cfs of stormwater may be discharged from the Lewin-Mathes Company plant area storm sewers due to a 5 year frequency storm into Dead Creek, This will not enter the sewer system and should flow south in Dead Creek,
(22) WATER PCB-SD0000005225
PUN "B-Al" - ALTERNATE NO. 1 (Table U-A)
This plan is identical with Plan "BM - Treatable Waste System, with the following exceptions:
1 The North branch stops at H.H. (6) and the pipe size is reduced between (6) and (10).
2, For the treatable waste from Mobil Oil Co. a new treatable waste line has been added along State Aid Route 10 connecting into the proposed treatable waste system through the southern portion of Monsanto Chemical Conpany main plant area.
3. See Table U-A - Change in hydraulic gradient* Should Plan "B" be adopted. Alternate No. 1 would definitely be economically desirable and should also be incorporated into the plan.
(23) WATER PCB-SD0000005226
PLAN "B-A2" - ALTERNATE NO. 2 (Table 6-A)
This optional plan may be adopted to provide relief in the north branch of the clear water system during periods of storm runoff.
The plan is identical with Plan "BM| - clear water system except for the construction of 1 - 30'" line to divert most of the stormwater from Mobil Oil Co. along State Aid Route 10 into the designated clear water system through the southern portion of Monsanto Chemical Company main plant area.
By referring to Table 6-A - hydraulic gradient it is apparent that this flow can be accommodated without surcharging the sewers.
(210 WATER PCB-SD0000005227
HAN "B-1A" (Table 7 - For 1" Rainfall) This plan is similar to Plan "B" except that investigations were made on the basis of a rainfall of 1M per hour. The change in the treatable waste system involves the deletion of 1 36" sewer through the Main Plant area of Monsanto Chemical Company, The adoption of Alternate No, 1 would be desirable and should be in cluded in this plan. The clear water system is the same as for Plan "B" which was found to be generally adequate for a rainfall of 1,8" per hour. The conditions in the north branch would be somewhat improved over Plan "B" being based on a rainfall of 1"' per hour rather than 1,8"' per hour. However, to make this branch completely adequate, it would be desirable to adopt an alternate similar to Alternate No. 2 (Plan "B-A2").
(25) WATER PCB-SD0000005228
PLAN "0" (Tables 8, 9, 10 and 11)
This plan is basically different from the other plans in that the existing sewers in the main plant area of Monsanto Chemical Co. are designated for treatable wastes and the new sewers to be con structed through the approximate center of this area would collect clear water wastes. According to information supplied regarding the in-plant sewers, it does not seem to be economical to divert the treatable wastes from the existing trunk sewers into a new sewer regardless of location and alignment. Treatable Waste System. All existing sewers extending eastward from the present Village Pumping Station through interceptor (2) and junction box (10), thence through the main plant area of Monsanto Chemical Co.,are designated as treatable waste sewers (see Plan).
As indicated in Plan "B", the following new treatable waste
sewers are requireds k. 12" sewer southward from (10) to Midwest Rubber Co.; a 2h" sewer northward from interceptor (19); and a 30"
sewer along Dead Creek to serve Lewin-Mathes Co. The treatable wastes from the southern residential area and from Sterling Steel Co. will continue in the present sewers.
Referring to Table 9 - (lines 23 to 30), it is apparent that the two existing sewers through the Monsanto Chemical Co. main plant area are inadequate for both the treatable wastes and the tributary
runoff from a $ year frequency storm unless emergency ponding is
(26) WATER PCB-SD0000005229
provided in Dead Creek, The tabulated hydraulic gradient is hypo thetical in that any substantial stormwater runoff null result in over flow through the 36 C.I. under the Alton & Southern R.R. right-of-way into Dead Creek,
Dead Creek serves as a drainage ditch for Lewin-Mathes Co, in that area. It is also essential to this plan as an emergency ponding reservoir for the treatable waste system mentioned above during periods of heavy rainfall, A certain amount of stormwater from Lewin-Mathes Co, storm sewers will undoubtedly enter the treatable sewer system (unlike Plan "BMl where this stormwater is assumed to be flowing south). However, this was not taken into account in computing the hydraulic gradient, since the Stormwater can enter the sewers only after the flow has subsided and not at the time of peak flow.
Because of surcharge conditions in the existing trunk sewers in the Monsanto Chemical Co, main plant area, it is impossible to consider Alternate No, 1 in this plan. Clear Water System, Two new 36" sewers are proposed from the eastern side of State Route 3 to the new U.S.C.E, pumping station. The existing 30* sewer serving the north area of the Village is designated for clear water and would be intercepted around junction box (2), It would be possible to utilize one of the 36" sewers between (2) and the pimping station, but, it is felt that the new structures required to achieve this would offset any saving to be realized.
(27) WATER PCB-SD0000005230
Since the capacity of the sewers between (2) and the pumping station has been somewhat reduced, new sewers will be required in the North area as shown on the plan.
An inverted siphon around junction box (10) will be required to permit crossing existing sewers in that area - (see Plan). The 30" sewer extending eastward from (39) through the Monsanto Chemical Co. main plant area will in all probability be engineered and constructed by that company. The collection of clear wastes from Lewin-Mathes Co. - amounting to 300,000 gpd - will be provided for by the installation of a small pumping station and a-6M pressure line discharging into an existing sewer as indicated on the plan.
(28) WATER PCB-SD0000005231
PUN "C-l"' (Tables 12. and 13) This plan is similar to Plan "C11 except for the followings Treatable Waste System. Fewer treatable waste sewexsare required due to lower storm runoff and the situation at Dead Creek is less critical during periods of intense rainfall. Clear Water System. Most of the new sewers indicated are smaller than those in Plan "C" due to a smaller amount of rainfall. The addition of new sewers to make the North area sewers double does not seem to be essential, although they may be desirable. The stormwater from Mobil Oil Co. is the same in this case as in Plan "C" due to the factor of pump capacity as described in Basic Informations and Data.
(29) WATER PCB-SD0000005232
GENERAL INFORMATION RELATED TO TABLES
1. Numbers for existing manholes are in general those shown in the Homer & Shifrin report of 1952 - plus new designations for manholes to be constructed, A. number refers to an area rather than a single manhole and usually refers to more than one manhole.
2. Elevations at top of manholes were taken from the Homer & Shifrin sewer profilesj others designated as () were taken from topographic maps and may be subject to variation*
3. Lengths of sewers are shown in Col. 6 of the tables. When followed by a plus (*) sign these lengths were taken from the Homer & Shifrin report - others were scaled from the maps.
U. Discharge values shown in Col. 11 are actual values given by the respective industries. The values shown are based on average daily flow with the exception of those indicated for Darling Fertilizer Company, Lewin-Mathes Company, Sterling Steel Casting Company and sanitary waste from residential areas - which are maximum values.
5. Where the flow is indicated as "Part FuH", capacities are shown as maximum with sewers flowing full - designated with the suffix (-*-).
6. In diy weather flow tables the velocities are shown only when suspected of being low.
(30) WATER PCB-SD0000005233
7. These tables should not be used for final design without certain field checking and adjustments.
8. No infiltration is assumed since all sewers are to be encased in concrete.
9. Sewer discharge was obtained as shown in Basic Information & Data. Time of flow in sewers was disregarded in this study because of trunk line branching*
10. Rutter's "n" for new sewers is assumed as 0.013 - for existing sewers assumed as 0.015. This should be reasonable unless there has been build-up, in which case the sewer can be cleaned.
(31) WATER PCB-SD0000005234
LIST OF TABLES
Table No.
Description
1 Plan "A" Treatable Waste System Without Stormwater
2 Plan "A" Clear Water System Without Stormwater
3 Plan MB Treatable Waste System Without Stormwater
k Plan nB" Treatable Waste System With Stormwater (1*8 inch per hour)
h-A Plan "B-A1" Treatable Waste System With Stormwater Alternate No* 1 (1*8 inch per hour)
5 ' Plan B* Clear Water System Without Stormwater
6 Plan DB" Clear Water System With Stormwater (1*8 inch per hour)
6--A Plan nB-A2a Clear Water System With Stormwater Alternate No. 2 (1.8 inch per hour)
7 Plan "B-1A" Treatable Waste System With Stormwater (1 inch per hour)
8 Plan "Cn Treatable Waste System Without Stormwater
9 Plan *C* Treatable Waste System With Stormwater (1.8 inch per hour)
10 Plan nCn Clear Water System Without Stormwater
11 Plan nC" Clear Water System With Stormwater (1.8 inch per hour)
12 Plan nC-ln Treatable Waste System With Stormwater (1 inch per hour)
13 Plan HC-ln Clear Water System with Stormwater (1 inch per hour)
(32) WATER PCB-SD0000005235
TABLE NO. I
PLAN "A" TREATABLE WASTE SYSTEM WITHOUT STORM WATER
LINE NO.
1 1 2
4
MANHOLES top or m.h.elev LENOTH UPPER LOWER UPPER LOWER IfT.i
2 34
36
SIZE <IN.>
7
2 2- A 10 10
1 2 2- A 2
425 42 5 4ia 4i a
417 425 4 25 4 25
9 63 4 2-36
1 ao
36
1 i 00
36
12 60
36
r.L. ELEVATION UPPER LOWER
69
r. l. SLOPE
10
QCCF3) KUTTER QlCFSI MAXIMUM
INDUSTRY tv
CAPACITY TOTAL
I
12 13
14
VEL. 1FPS.J
13
V2
29 (FT,*
16
397.30 39 6.30 0.001 0 24.5
400.26 40 1.36 40 1.36
397. 30 400.26 3 97.30
0.6018? 0.00 1 0 0.00327
~|
24.5
J
0.01 5 0.01 3 0.01 3 0.01 3
19 26
I9 35
3 6-4-
' 61 4-
J
------- ------
-- -- --
REQ SLOPE
17
-- _
ELEV. HYD GRAD. UPPER LOWER
16 19
PART PART PART PART
PULL FULL FULL FULL
PROPOSED PROPOSED
3
H
10 4 2 3
4 |6
6 934
2I
40647 4 02.06 O.00425
0.3 0.01 5
9
9 4 1. 6
00 3
PART
FULL
e
12
II 4 24
4 23
3 50
2i
407.64 4 0 6.4 7 0.00425
0.3 0.0 i 5
9
-+ 1.6
0.0 5
--
PART
FULL
?
13
12 42 1
4 24
7 80
21
4 | 1.25 4 0 7.64 0.00425
0.3 0.01 5
9
+ 1.6
0.0 5
PART
FULL
a
19
10 4 20
4 16
116 4 24
402.66 4 02.43 0.00 147 24.2 0.01 3
24
24
67
l.l 7
0016
406.55 404.43
9
39
19
4 1 tl
4 20
9 00
24 406.64 405.20 0.00049 6.9 D.O 1 3
7
7
1. 9
0.0 5
0.0009 3 407.40 406.55 PR0P03E0
to 3 ii 4
39 419 3 413
4 1 it 1000
4 19
1 OS
24 406.13 406.64 0.00049 24 406.19 406.13 0.0006
6-9 0.0 I 3 6.9 0.0 I 3
7 7
7
1.9
00 5
0.00093 4D6 35 407 40 PROPOSED
7
19
00 5
0.00093 406 43 406 35 PROPO 5ED
12
4- A
4
41a
4 13
2 00
24 40 6.50 406.19 0.00 15
6.9 0. 01 3
7
13 t
4- A 4 i 7
4 i a 4 05
24 400 76 406.50 0.00064 6.6 0 013
7
7
19
0.0 5
0 0009 5 406 64 4 08 4 5 PROPOSED
7
1.9
00 5
0.00D9S 409.03 406.64 PROPOSED
14 a IS 7 ia 9
t 4 1 3 4 1 7 4 40
24 40 7.04 406.76 Q.00064
5.0 0.01 3
6
6
17
00 4
0.00070 409 34 409.03 PRO PO SED
6
416
4 13
3 60
24 406.12 406.63 0.004 I
4. 5 001 3
12
12 + 4 0
02 5
--
PART
FULL
PROPOSED
7
41 7
4 1 a 16 32 4
24
40 9.30 406.65 0.00173
4. 5 0 0 15
6
+ 2 6
010
PART
FULL
17
4- B
4
416
4 13
1 20
24 406-35 40619 0 0030
0.1 0.0! 3
2
10
00 2
--
part
FULL
PROPOSED TO RE PLACE EXIST LINE
ia 21
19 4 i a
4 20
7 54 4
24
4037 1 4 0 2 .60 0.00147 1 7.3 0 015
17
17
36
0.52
0.0065 4 12.03 406 55
19
23
21 4 17
4 10
3 29 4 24
404.16 403 67 0.00095 14.6 0.01 3
15
15
46
033
0.0053 4 13. 66 412.05
20
24
23 4 1 5
4 1 7 2 314 24 404.40 4 04.16 0.00095 14.5 0.01 5
13
I5
4. 6
0 33
0.003 5 4 1 5.1 3 413-66
21
26 24 4 14
415
64 4
24
404.91 4 04.44 0.00 7
1 0.0 0.01 3
1o
I0
3. 2
0.1 6
0.0026 4 1 5.30 415.13
22
27
25 4 1 7
4 14
60
24 405.12 405.15 0.00037 9.6 O.Dl 3
10
10
32
01 6
0.0026 4 1 5.61 4 1 3.30
23
29
25 4 1 a
4 14
144 4
1 6 40 5.7 5 4 05.50 0.00174
0.2 0.01 5
0.2
0.2
0. 5
--
- 4 1 5.30 413.30
24
29- A
24
4 18- 4 1 5
3 00
2S
29- B
26-A 4 1 el 4 iel 4 50
26
26- C
26- 6 4 1 6 1 4i
a oo
24 403.16 404.40 0.0026 24 40 5.56 405.18 0.0009 24 406.12 4 05.36 0.000 9
4. 3 1.6 1. 6
0.013 0.013 o.oi a
4. 3 1. 6 1.6
4.3 1. 6 I. 6
1. 3 1. 0 1. 0
0.0 3 00 2 0.02
0.0005 --
4 1 6.26 413.13 4 1 3.26 416.26 4 1 3.26 4 13.26
PROPOSED PROPOSED PROPOSEO
WATER PCB-SD0000005236
TABLE NO. 2
LINE NO. 1
2
PLAN "A" CLEAR WATER SYSTEM WITHOUT STORM WATER
MANHOLES TOP OF M.H. ELEV LENGTH
UPPER LOWER UPPER 2 34
LOWER S
1 FT.* 6
SIZE
tlN.I 7
2
42 S
4 17
998 4- 36
2
42S
4 17
9 9ft 4 3 6
F.L. ELEVATION
UPPER 8
LOWER 9
F. L. SLOPE
10
QtCFSI KUTTER QtCFSI MAXIMUM
INDUSTRY rr 1 12
CAPACITY TOTAL 13 14
VEL. tFPS.I
15
400. 00 397.52 00025 397. 40 396.40 OOOIO
37.2
0.0 | 5 0.0 I 5
29 19
46 +
___
yL
LFTI 16 --
REQ. HYD. SLOPE
17
ELEV. HYD. GRAD. JPPER LOWER
16 19
PART PA RT
FULL FU LL
RL5IA R
S 4 5 6 7 e 9 10 11
3 4 4- A 5 e 7 S e-a 9
2 3 4 4- A 5 8 7 8 a
49 43 46 47 43 4a 45 47 47
4 25 4 19 4 13 4 1a 4 17 4 13 418 4 15 415
1 537 4* 105 4
30 30
200
30
405
30
440 2-24
360 4 24
400
18
880 350
1a 15
402.55 400.80 00012 5 402.68 402.55 0.0012 5 402. 93 402.66 0.00125 403.43 4 02.93 0.0012 5 404. 77 4 04.00 0.00 175 405.40 4 04.77 000175 40 6.58 4 0 5.90 000165 406. 62 408.58 VARIES 4 | 0. 00 406.62 0.00337
1 1. 1 1 1. 1 1 1. 1 10.9 2.5 0. 5 0. 5 O. 5 05
0.0 | 5 DO 1 5 0.0 1 5
0 0 15 00 t 5 0.0 1 5 0.0 1 5 0 0 | ft 0.0 1 5
13 13 13
13 6 6 4 4 6
1 3+ 1 3+ 1 3+ 1 3+ 1 B+
8-|4 -4448+
_
-- -- -- 1.9 1.3 1.4 14 17
_
-- -- -- 0. 05 0 03 0 04 0 04 0 05
___
-- -- -- -- -- -- --
PART PART PA RT PART PA RT PART PART PART PART
FULL FULL FULL FULL FULL FULL FULL FULL FULL
12
10
2
46
4 2 5 1 260 4 2-3 8
401 26 4 00 00 OOOIO
26. 1 0 0 15
19
3# +
--
_--
P ART FULL
t 3 10- A 14 10- A
0 4e 0 46
4 i8 418
1 00 1 00
_
12 402.40 401. 26 12 402.40 401.26 --
0.0 1 3 0.0 1 3
3.4 3.4
o.
4. 5 4.5
0.31 0.31
0.011 0.01 1
403.63 402.53 PROPOSEO 40363 402.53 INVERTED SIPHOf
15
11
10- A 4 23
4 t8
930
24
406.49 4 02.4 0 000447
6.6 0.0 1 5
13
1 3+
4. 3 0. 29
--
PART FULL
t fl 12 1 7 13
1
4 24
4 23
350
2 4 40 6.06 40849 0.00447
6.6 0.0 1 5
13
12
421
4 24
7 30
24
41 1.4 5 406.06 0.0044 7
3.3 0.0 1 5
13
' + 134-
4.3 3. 5
0.29 0. 19
--
PA RT PART
FULL FULL
1
19
10
420
4 16
1404 3 8
40 1. 83 40 1.56 O.OOiO
1 9.3 0.0 1 5
19
19
2.6
0. 10
0 0010 404.63 404i56
19
20
19
42 0
4 20
4 564 3 0
402. 83 402.02 00016
1 9.3 0 0 15
19
19
4.0
0.25
0.0030 4 10.21 406.63
20
2t
20
4e
4 20
265 4 30
403. t 2 402.68 0.00064 1 9.3 0.0 1 5
19
19
4.0
0 .25
0.Q030 4 11.07 4 1 0.21
21
22
21
47
4 |6
25 1 4 36
403 26 403.03 0.00099 1 9.3 0.0 1 5
19
19
2.6
0. |0
OOOIO 4 1 1.32 4 1 1.07
22
23- A
22
417
4 17
1 60 4 36
403 64 403 38 000155
1 6 0 0.0 1 5
16
t6
2.0
0. 06
0.00075 4 1 1.4 6 4| 1 32
23
2 6 23- A 4 7
4 17
2854 3 6
403 92 403.64 000090 t 1 5 0.0 1 5
1 1. 5
II. S
1.7 0 05 000040 4 115 6 4 1 1.4 6
+ 24 26-D 23- A 4 16. 4 1 7 1 000
1 2 4 1 0. 00 40&.00 0.0050
0.5 0.0 1 3 0. 5
0.5
1. 3
0.03
0.OOOIO 411. 56 411.46 PROPOSED
WATER PCB-SD0000005237
TABLE NO 3
LINE NO.
1
i 2 3 4
PLAN "B* TREATABLE WASTE
MANHOLES TOP OF M.H.ELEV. LENGTH
UPPER LOWER UPPER LOWER
FT
2 34 3 0
SIZE IN. 7
r.L. ELEVATION UPPER LOWER
09
F. L. SLOPE
10
SYSTEM WITHOUT t
q<crsi RUTTER Q'CFSt MAXIMUM
VEL.
INDUSTRY rv
CAPACITY TOTAL
FPS
11 12 13 1 4 IS
z 2- A IQ 10
. 2 2- A 2
425 423 41 0 4I0
4 17 423 423 423
eso too IOO 1230
2-36 SO 30 30
397.SO 390.30 0.00110 24.3 400. 20 397. 30 0.0107 ] 401. 30 400. 26 0. 0010 124. 5 401. 30 397. 30 0.00327
0.013 0 013 0.015 0 .013
23 46 + --
_29 bb4
21 loo
39
STORM
V,2 REQ.
*FT 1 16
SLOPE 17
--
--
-- ....... .
-- --
WATER
ELEV. HYD. GRAD. UPPER LOWER
10 19
PART PART PART PART
FULL FULL FULL FULL
PROPO SED PROP 0 SED
PROPOSED
S
It
to 23
4 10
930
6
12- A
It
420
423
tooo
7
13 12 - A 42 1
420
12 407. 0 3 404.9 5 0.0021
>2 407. 03 0.00406
12 411. 43
--
0. 3 0. 3 0.3
0.013 0.013 0.013
16 20 20
1.0 20 420 +
13 1. 9 1. 9
003 0.06 0.00
--
--
PART PART PART
FULL FULL FULL
PROPO SED PROPO SED PROPOSED
6
19
10 42 0
40
230
2- 3fl 399.40 399.00 0 0016
17. 3 0.013
27
--
--
--
PART FULL
PROPOSED
C PROPOSED P IMPtNO S TATION kT M.H. 10 TO PUMP T IE SEWA IE IN L INE 0 INTO LINE 36 4 1
9
19
10 120
4 10
2 30
24 404. 99 404 70 0.00116
0.9 0. 013
6.3
e.s + ____
_____
--
PART FULL
PR OPO S ED
C LINE 9 CO JNECTS TO the OISCHAROE SIDE OF LIT r 3TA7I m >
io 20 19 420 n 21 20 110 12 23 21 4 1 7 13 24 23 41 a 14 20- A 24 4 1 0 i a 20- a 20- A 41 0 tfl 20- C 20- a 4 1 0
420 420 410 4 17 4 15 410 40
4 00 290 130 230 250 430 000
2 * 30 2-36 2-30 2-30
24 24 24
399. 9S 399.40 0.0012 4 00. 30 39 9. 9 5 0.0012 400. 09 4 00. 4 2 0.0012 400.97 400. 09 0.0012 404.74 400 97 0.0131 4OS. 24 404. 74 O.OOII 400. 12 403.24 0.001 1
1 7.3 1 3- 0 14. 0 14. 3
4. 3 1. 0 1. 0
0.013 0.013 0.013 0.013
0.013 0.013 0.013
24 24 14 14
27 0 0
40 + ____ + --
20 -f --
28 427 +
-- 0. 3
0 + 2.0
! + 2.0
_____ -- --
-- 0.05 0.00 0.00
_____ --
-- -- -- --
PART PART PART PART PART PART PART
FULL FULL FULL FULL FULL FULL FULL
PROP 0 SED PROPO SED PROPO SED P ROPOSED PROPO SED PROPO SED P ROP 0 SED
17
25 24 414
413
too
2-24 401. 27 401. 10 0.00174 14.o 0.013
9S
19 +
PART FULL
PROP 0 SED
--10
27 23 417
414
130
2-24 401. 30 40 1. 27 0.00174
90 0.013
9.3
19 + --
--
PART FULL
PROP O SED
19
20
24 4 1 0
4 13
144
10 407. 75 402.00 0.0400
0.2 0 .013
20
20 + 3 9
0.23
--
PART FULL
PROPO SED
20 1 21 1 22 1
23 24 20 20
3 4 4- A 3 0 7
9
19 3 4 4- A 5 0
7
419 413 4t 6 41 7 413 410
41 7
420
4 19 4 13 4 16 4I7 4 13
4 IS
1900 103 200 40 a 440 300
10 30
24 400. 13 404.99 0.0000 24 400. 19 400. 13 0.0000 24 400.30 400. 19 0.0013 24 407. 70 4 0 0. 50 0.00064 24 407. 04 400. 70 0.00004 21 400.12 407. 12 0.0030
21 409.30 400. 12 0.00003
0.9 0.9 0. 9 0- 0 5.0 4.5 4. 5
0.013 0.013 0.013 0.013 0.013 0.013
0.013
S3 3.3 6.5 0 6 9.3
4.5
5.S + *5 +
85 + 6+
6 4-
9.5 + 8.5 +
2.2 2.2 22 22 1. 9 1. 9 1.9
0 07 0.00090 406.71 400.99 PROPO SED
0.07 0.07
0.00090 400.00 406.71 0.30090 406.BO 40 6.60
PROPO SED PROPO SED
0 07 0. 06
0.00090 409.30 40 6 .96
--
PART FULL
0. 00 . --
PART FULL
0.00
PART FULL
PROPOSED PROPO SED PROPO SED PROPO SED
27 4-0 4 4 1 5
413
120
24 400. 53 400. 19 0.0030
0. 1 0.013
2.0
2 0 4- 1. O
0 02
PART
FULL
PRDPO SED TO
IEPLACE EXIST. LINE
WATER PCB-SD0000005238
TABLE NO. 4
PLAN
0 3
TREATABLE WASTE SYSTEM WITH STORM WATER Cl & INCH PER HOUR >
LINE NO. 1
MANHOLES TOP OP M.H.CLCV LENGTH SIZE
UPPER LOWER UPPER LOWER <PT.)
(IN.)
23 4 5 6 7
P.L. ELEVATION
P.L.
UPPER LOWER SLOPE
6 9 10
TREAT 1f
QCP5
KUTTER
Qicrsi
STORM TOTAL
"IV
caaacitV total
12 13 14 15
16
VEL.
(FPS.) IFT.I 17 16
REQHtD.
ELEV. HYD.6RAD.
SLOPE UPPER LOWER
19 20 21
1
2
1 425
417
650
2- 16 397.30 396.30 0-00116 24.3 39.2
63.7 0.013
32
64
4 .4
0. 30 0.0022 401. 17 399.30 PRO P 0 5 E 0
2
2- A
2 425
*426
160
36 400.26 397.30 0.0167
0.013
29.7
42
0.27 0.001 9 401.46 401. 17 PROPOSED
3
10
2- A 41 6
425
1100
36 401.36 400.26 0.0010
24.3
39.2
637 0.01 5
29.7
63.7 4. 1
0.26 0.0025 404. 23 40 1.46
4 10
2 416
425
1250
36 40|. 36 397. 30 0.00327
0.013
34.0
*
0. 35 0.002 5 404.40 401. 17 PROPO SEO
S II
10 423
416
9 50
0
12- 'A
II
420
423
1 060
7
13 12 - A 421
4 20
12 407. 05 404.95 0.0021
03
12
--
407. 05
0.3
0.00406
12 411.45
--
0.3
-- --
03 0.013 0.3 0.013 0.3 0.013
IB 20 2.0
18 + 2.0 + 2.0 +
1. 3 1. 9 1. 9
0.03 0.06 0 06
PART
FULL
-- PART TULL
PART
FULL
PROPOSED PROPO SEO PROPO SED
B
19
10 420
4 16
250
2-36 399.40 399.00 0.0016
1 7.3
36.9
54.2 0.01 3
27
54 3.7
0.21 OOO 1 5 402.37 402.00 PROPO SEO
C PROPOSED *U MPINO STATIO 4 AT M.H. 10 TO PUMP TH E SEWAGE IN LINE 6 INTO L INES 3 34)
9
19
10 420
416
25D
24 404. 99 404. 70 0.001 16 6.9
2. 3
9.2 0013
9
C LI NE 9 COf 1NECT3 TO THE DISCHARGE SID : OP L FT STATION >
9
2.6
0.12 0 00 1 7 407. 12 406.70 PROPOSED
10 20
19 420
11 21 20 416
12 23 21 4 1 7
13 24
23 41 5
14 26- A 24 41 6
IS 26- B 26- A 41 6
16 26- C 26- 6 4 1 6
420 420 416 417 415 4 16 416
4 60 290 3 30 230 250 4 50 600
2-36 2-36 2-30 2-30
24 24 24
399.95 3 99 .4 0 0.0012 400. 30 399. 9 5 0.0012 400. 69 400.42 0.0012 400. 97 400. 69 0.0012 404. 74 400 97 0.0 151 405. 24 4 04 . 74 0.0011 406. 12 4 0 5.24 0.001 1
1 7. 3 1 5. 6 1 4. 6 1 4. 5
4. 3 1. 6 1. 6
36- 9 34.0 30.9 30. 7
9.7 66 5.6
54 .2 0.013 4 9.6 0013 35 5 0.013 35 2 0.013 14.0 0.0 13 6.2 0.0 13 T.4 00 13
27 25 16 16 27
6 6
54 50 36 36 27 +
6 6+
3. 7 3. 5 3. 7 37 S6 26 25
0.21 0. 19 0.21 0.21 1 20 0. 1 1 0. 10
0.001 S 403.06 402.37 0.00 14 403 46 403.06
0.001 6 404. 06 40 3-46 o 001 a 404.47 404 06
-- --
PART PART
FULL FULL
PAR T
FULL
PROP OSEO PROPO SED PROPO SED PROP OSEO PROP OSEO PROP O SEO PROPO SED
17
25 24 414
415
100
2-24 401.27 40|. 10 0.00174 1 0. 0
20 9
30.9 0.01 3
16
32
52
0 42 0.0 052 404.99 404 47
PROPO SEO
16
27 25 417
414
130
2-24 401. 50 401. 27 0-00174
9. 6
13. 3
23.1 0.013
12
24
3. 6
0. 22 0.0029 405.37 404-99 PROPO S EO
19 26
24 4 1 6
4 15
1444
16 407. 7 5 402. 00 0.0400
0. 2
7. 6
7.8 0.013
6
6
4.5
0.31 0-0060 405 05 404.99 PROPO S EO
20
3
19 419
420
1 400
21
4
3 413
4 19
105
22
4- A 4 4 1 6
4 13
200
23
5 4 - A 41 7
416
405
24
6
5 41 3
417
440
25
7
6 41 S
413
360
26
9
7 41 7
4 16
1 630
24 406. 13 404. 99 0.0006 24 406. 19 406. 13 0 0006 24 406. 50 406-19 0 0015 24 407. 76 406. 50 0.00064 24 407. 04 406. 76 0.00064 21 406. 12 407. 12 0 0036 21 409.50 406.12 0.00065
6. 9
6. 9 6. 9 6. 6 5. 6 4.5 4. 5
2. 3 2.3 -- 0. 2 -- --
9.2 0.013
9.2 0.013 7.0 0.013 7 0 0 013
5.6 4.5 4.5
0.0 13 0.013 . 0013
9 9 7 7 6 4.5 4.5
9 9 7 7 6 4.5 4.5
26
2. 6 2. 3 2. 3 1. 9 1. 6 1.6
0.12 0-001 7 410.35 40 7. 12
0 12 0.06 0. 06
0 001 7 410.53 4 | 0.33 0 0009 410.72 4 10.53 0 00095 411 10 41 0.72
0.06 0.04 0. 04
0.00070 411.41 41 1.10 0.00060 411. 70 41 1.41 0.00080 413.00 4| 1.70
PROPOS ED
PROPOSED PROPO 5 EO PROP OSEO PROPO 5 ED P RO POSED PROPO SED
27 4-6 4 415
413
120 4
24 406. 55 406. 19 0.0030
0. 1 2.0
2.1 0013
2.0
2.0
1.0
0.02 o.ooo ro 410.54 410.53
PROPO SEO TO REPLACE
EXIST. LINE
>wi niTiiu
JOS. W QOLDCNBEAO
WATER PCB-SD0000005239
TABLE NO. 4-A
PLAN 'B-AI' TREATABLE WASTE SYSTEM WITH STORM WATER (ALTERNATE
k ^ # \ * I inch NO. 1J PCRHOUR*
LINK NO. 1
MAN HO L(9 TOP OP M.H. (LEV. Ilenbth
upper LOWER UPPER LOWE ft iPt i
(8 4 9
6
1
*
ft B t
1 HO
SIZE (IN. *
7
P-L. ELEVATION
P. L.
UPPER LOWER SLOPE
B ft 10
TREAT 11
Q ICPS)
KUTTER
QICP3 *
STORM TOTAL
CAPACITY TOTAL
It 13 14 Ift
16
VEL.
v>
CPPft.) IPTI*
17 16
REO. ELEV. HYO. 0 RAD. slops UPPE R LOWER
it 20 21
REMARKS
4
ft |_
] SBC
7
..
1 0 420
419
2 50
2- 36 399 40 399.00 o.ooie
21 9 36 9
56 7 0 013
30
60
C PROPOSED f UMPtNO 3TATIO 1 AT M.H 10 TO PUMP T IE SEWAGE IN LINE ft NTO LI IE5 3 14)
9 tft
10 to 1 1 tl It 23 1 3 t4 14
L
JIfl
1 0 42 0
41 6
230
Ift 409. 10 4 04.9 5 0 0010
2.4
2.3
( LINE 9 CONN CTS Tl THE Dl CHARGE SIDE O LIFT ft. TATION
IB 420 20 416 21 4 1 7 t3 4 1 9
420 420 4t 6 417
460 290 330 230
2-36 2-36 2 -30 2- 30
399. ftft 5f9.40 a oou 400. 30 3BB. V5 0.00 If 400.4B 400.42 aooif 400. 7 400. 0.0012
2 1.6 20. 1 Ift. 1 1 ftft
36.ft 3 AO 30.ft 30.7
4.7 0. 013
ftft.7 54 J 50.0 48.5
0.013 0.013 0.01 3 0.013
ft
SO 27 25 ts
5
60 54 50 80
43
0. 29 0 0020 402 50 4 02 00
PROPOSCD
2.6
0. 12 a 0023 407. 17 406.35
PROPOSED
43 3.6 5.2 52
0 . 29 0 20 o 42 0. 42
0 0019 403.37 402.50 0.0019 403. SO 403.37 000375 403. 05 403 80 0.0 0375 403. 92 405.09 0.0040 406.92 4 05 92
PROPOSED PROPO SE 0 PROPOS E 0 PROPOSE 0
PROPOS E 0
0.00 11 408.34 4 0 7.46
PROP OS E 0
17 ! Ift-A
2ft n 1
14 4 14 2 9 417 2 7 417
41 9 41 4 4 17
100 ISO 1700
2- 24 2- 24
IB
401 . 27 401. 10 0.00174 401. 60 4 01. 2 7 000174 40 ft. 90 40 1. 70 0 0046
1 4. S 1 4.3
4. ft
25.4
13. 3 --
J-
*
to
IB 4 1 B
4 20
tl
1
3 41 3
4 IB
22 4 A
4 4 16
41 3
23
)
4-A
417
416
* 5 41 3
41 7
2ft
1 J 0 II 1 T T S 0
I BOO 109 ZOO 409 44C
IB 40ft. 24 409. 10 0.0006 Ift 40ft. 30 40ft. 24 0. 0006 IB 406. 80 409 .30 0. ooto u 406. 75 406. 90 0 00063 19 407. 06 406. 73 0.00063
Z.4 2.4 2. 4 2.2 1.3
2.3 2. 3 -- 0.2 --
3ft. 9 G 013 17.6 0. 013
4.S 0.013
4.7 4.7 2.4
z.4
1.3
0.0 13 0013 0.013 0-013 0.013
20 14 45
5 9 25 2.5 I.S
40 28 4.S
6. 0 4. 5 2.5
0 08 0. 3 1 0. 09
0.0085 40 6. 77 0.0040 407.29 0.0020 410.69
409.92 406.77 407.29
PROPOSEO PROPOSE 0 PROPOSEO
_____ j-
5
2.
0. 12 0.0023 4 1 1. 53 407. 1 7
PROPOSE 0
8
2. ft
0. 2 0.002 3 411. 77 4)1.53
PROPOSEO
2.5
1 .4
0. 03 0. 0005 411 97 411 77
PROPOSE 0
2.5
14
0. 03 0.0005 412. 10 411 .87
PROPOSED
1.5
1. 0
0. 02 OX)002 412. 20 4 12. 10
PROPOSE 0
27 3 s e E
TAB L E
NO.
4
--c 0.00010 411.76 411.77
PROPOSED
WATER PCB-SD0000005240
TABLE NO. S
LINE NO 1
1 2 S
PLAN "B" CLEAR WATER SYSTEM WITHOUT STORM WATER
MANHOLES TOP OF M.H. ELEV. LENGTH
UPPER LOWER UPPER LOWER (FT j
2 34
3a
SIZE (IN.)
7
2
1 423
47
996 4
36
2
1 42 3
47
993 4
36
2
1 42 5 417
963 4 2-36
F.L. ELEVATION UPPER LOWER
69
F. L. SLOPE
10
Qf CFS> KUTTER' QCCF31 MAXIMUM
INDUSTRY *rr
CAPACITY TOTAL
1
12 13
14
VEL. CFP3.)
15
Z REQ. -- HYD.
IFT
SLOPE
16 17
400.00 397 52 0.0023 397. 40 39640 0.0010
37.2
0.015 0.01 5
29 19
--
.A 4- --
-- --
-- --
397. 30 39 6 30 0.0010
0.01 3
36
ELEV. HYD. GRAD. UPPER LOWER
16 19
PART PART PART
FULL FULL FULL
4
3
2 41 9
423
1337 4
30 402. 33 40 0 63 0.00125 1 1. 1 0.013
13
1 3 4-
PART FU LL
--5
4
3 41 3
49
103 4
30 402. 66 402. 53 0 00125 1 1. 1 0.01 5
13
114-
--
--
PART FULL
6
5
4 41 7
413
605 4
30 403 43 40 2.66 0 00123 1 0.9 0.01 5
13
134- --
--
--
PART FULL
--7
6
5 41 3
417
440 4 2- 24 404. 77 404. 00 0.00175
2.3 0 01 3
6
H> + 2.3
0.0 6
PART FULL
4-6
7
6 41 6
4| 3
360 4
24 403. 40 404 77 0 00163
0.3 0. 01 5
6
1. 3
0.0 2
--
PART FULL
9
a
7 41 5
416
400
16 407. 22 40 5 90 0.00173
0.01 3
4
03
12 -- -- --10
6
7 41 5
416
4 00
24 407. 35 406.63 0.00173
0 01 5
6
1.4 4-
0.0 3
PART PART
FULL FULL
DIVERTED TO THIS LINE
ASSUMING FLOW
11
6- A
6 41 7
4| 3
660
16 406.6 2 407. 33 VARIES
0.01 5
]J- :12
9 6- A 41 7 41 7 330
16 409.50 406.62 0.00337
0 0(3
13
9
6 41 7
41 3
1232 4
24 4 1 0. 00 40 7. 35 0- 0QI75
0.013
1.4 2. 1
0.03 0.0 7
_
PART PART PART
FULL FULL FULL
DIVERTED TO THIS
PROPOSED TO REPLACE EXIST. 13" LINE
-- --14
10
2 41 6
425
1260 4 2-36 401. 26 400.00 0.00 1 0
26 1 0 01 3
19
38 4- --
PART FULL
il15
10 42 3 416
937 4
24 406.49 402.40 0.00447
6 6 001 5
13
22 4-
PART FULL
ie II
10 423
4|6
693 4
21 406. 47 402.66 0.0042S
0.01 5
9
--
--
--
PART FULL
17
12
II 424
423
350
24 406. 06 406.49 0 0044 7
5 1 0 01 5
13
22 4-16
12
II 424
4 23
3 30
21 407. 64 406 47 0.004 2 5
1 6 0.01 5
9
-- 2.6
-- 0.12
-- --
PART PA RT
FULL FULL
19
13
12 42 1
424
730
24 411.45 406 06 0 00447
1. 3 0 01 3
13
2. 6
0. 10
--
PART FULL
4-22
20
13
12 42 1
424
760
21 4 1 1.25 40 7. 64 0.00423
1.6 001 5
9
2. 6
0. 12
PART FULL
21
19
10 420
4| 6
140 4
36 401. 63 40 |. 56 0.00 160
0 01 3
16
19.6
23
_
PART FULL
22
19
10 420
41 6
116 4
24 402 60 402.43 0.00147
O.'OIS
7
--
--
--
PART FULL
23
21
19 4 1 6
420
754 4
24 403. 71 402.60 0 00147
0.01 3
*i
--
--
--
PART FULL
24
20
19 420
420
4 36 4
30 402.63 402.02 0.0016
1.3 0. 01 3
i.
2 34- --
--
--
PART FULL
J25
21
20 41 6
420
263 4
30 403. 12 402.66 0 00064
0.015
16 J
--
--
--
part
FULL
26
22
21 4 I 7
41 6
251 4
36 403. 26 403.03 0.00099 1 1. 6 0.01 5
20
--
--
--
PART FULL
27
23- A
22
41 7
4| 7
I 80 4
36 403.64 403.36 0.00 1 35
6.0 0.01 5
13
2 5+ --
--
--
PART FULL
26
26 23- A 41 7
417
266 4
36 403. 62 403.64 0.00060
6.0 0.01 3
11
29
27
21 41 7
416
704 4
24 403. 12 403.67 VARIES
3.5 0013
3
30
26 27 41 7 41 7 100
24 403. 62 405. 12 VARIES
0. 01 5
-- --
-- --
-- --
PART PA RT
FULL FULL
NO FLOW WITH DRY WEATHER
CONDITION.
3}
26-0 24 41 6
41 3
1000
12 410. 00 40 5. 00 0 >0050
0. 3 0. 013
2. 5
2. 3+ 2.3
0.06
--
PA RT FULL PROPOSED
WATER PCB-SD0000005241
TABLE NO. S
PLAN 'B' CLEAR WATER SYSTEM WITH STORM WATER
LINE NO. 1
M ANHOLES TOP OP M. H.ELEV. LENOTH
UPPER LOWER UPPER LOWER IPT. J
234
34
4IZE UN. >
7
P.L. ELEVATION
r.L.
UPPER LOWER SLOPE
4 9 10
2
1 423
417
994 4
34 400.00 397. 32 0.0023
2
1 42 3
417
994 4
34 397.40 396.40 0.0010
3
2
1 42 3 417
943 4 2' 30 397. 30 394.30 0.0010
ZNO. 11
q tcrsi STORM TOTAL
12 13
KUTTER
Qtcrsi
n- CAPACITY TOTAL
14 1.3
16
VEL (PP3.)
17
v~~ REQ. HYD.
ELCV. HtO.ORAO.
PT.f
SLOPE UPPER LOWER
16 19 20 21
37.2
49.6
87. 0
0.01 3 0.013 0.01 3
22 22 44
4.7
0.34
____
PA ITT
FULL
66
3.0
0. 14 0.0013 401. Bl 400. 32
3.0
0. 14 0.0013 401.61 400 62
4
3
2 41 9
42 3
1337 4
30 402.33 400.43 0.00125 1 1. 1
30. |
41.2 0.013
42
42
ft. 7
1 . 17 0.013 426.23 403.13
&4
j! 4 1 3
419
103 4
30 402. 00 402. 55 0.0012 3 II. 1
29.5
40.6 0.01 3
41
41
a. 5
1. 12 0.014 4E7. 70 426.23
6
S
4 41 7
413
405 4
30 403. 43 402.66 0.00125 10.9
26.3
39.0 0.01 3
39
39
60
0.99 0.0123 435 .20 427. 70
7
6
5 41 S
41 7
440 4 2-24 404. 77 404.00 0. 00173
2. 3
24. 2
26. 7 O.OI 3
14
2a
4.5
O. 31 0.0052 437. 49 435.20
Zi
aca*j
6
7
4 4 1 ft
4 13
340 4
24 405. 40 404.77 0.00143
0.5
21.4
21.9 0.01 3
22
22
71
0.76 0 0 130 442. 17 437.49
9
a
7 41 3
415
4 00
1 ft 407. 22 40 3. 90 0.0017 3
0.01 3
7
39
0.24 0 0060 444.47 442.17
0.3
21 .4
21 .9
22
10
6
7 41 5
41ft
400
24 407. 35 404. 63 0 00 17 3
0.01 5
13
4.6
0.35 0 0060 444.47 442.17
j*-eg qOU
J J J1 1
ft- A
ft 41 7
41 5
440
12 9 ft- A 4 1 7 41 7 3 30
16 406 62 407. 35 VARIES *11 05 *1
"11 ,5.,
IB 409.50 404.62 0.00337
14. 6
OOIS O.OI 3
53 15
30 26
0.14 0. 12
0.0026 446. 93 444.47
0.0023
447.
73
446.93
PROPOSED TO REPLACE EYIST. 15- LINE.
IS
9
6 417
415
1232 4
24 4 10 . 00 407. 33 0 00175
0.01 3
10 _
3. 1
O.IS 0-0025 447.36 444.47
14 10
2 41 ft
42 5
1240 4 2-36 40 1. 26 400.00 0 0010
26.1
19.7
45.6 O.OI 3
23
46
3.2
0. 16 0.001 3 406.05 403. 1 3
IS
II
10 42 3
414
937 4
24 404.49 402.40 0.00447
0.015
13
-f-6.6
14.4
21.2
22
ie II
10 423
41 4
693 4
21 406. 47 402. 44 0.00425
0.013
17
12
II 424
423
350
24 406.06 406.49 0.00447
3. 1
O.OI 3
14.0
22 +21. 2
* **12
424
423
3 30
21 407. 64
' 0.00423
4.7
O.OI 3
U. J
_19
IS
12 42 1
424
730
24 41 1.43 406.06 0.00447
,
11. 6 0-015
13
8 22 -+20
13
12 42 1
424
740
21 411.25 407. 44 0 00425
4.7
O.OIS
g
0.27 0.21 0. 29
0.24 0. 1 1
PART PART PART PART PART PART
FULL FULL FULL FULL FULL FULL
21 19 10 42 0
22 19 10 420
23 21
14 41 4
24 20 19 420
25 21 20 414
24 22 21 41 7
27
29- A
22
417
* 29 2S> A 417 29 27 21
24 27 41 7
414 414 420 420 420 414
4|7 415 417
140 4
1 IS 4 754 4 434 4 243 4 231 4 140 4 243 4 704 4
too
36 401. 63 40 1.36 0.00140 24 402.60 402.43 000147
193
3.3
124 403. 71 402. 40 0.00147
so J30 402.43 402.02 0.0016 119.3
403. 12 402. 66 0.00064
J
36 403. 24 40 3. 03 0.00099 30 403. 04 403 36 U 00 133
lie
_7 6
34 403. ft2 403. 64 00C090
24 405.12 403. 67 VAR in
3.3
24 403. 42 405.12 VARIES
24. 6
24. 6 19.6 II
O.OI 3 O.OI 5 0.013 O.OI 5 O.OI 3 0.0)3 0.013 0.015 O.OIS 0.013
10 23
7
9I
18
23
J
20 -i
23
_1 1
2. 6 2. 2 2.7 3.2 3.2 2.0
0.10 0.06 0.1 I 0.16 0.16 0.12 0.06 0.05 0.03
0.00095 403. 13 403.C5
0 00 125 403. 19 40 3.0 3 0.0021 406. 77 40 5.19
00021 406 16 403.IE 0.002 1 406 16 40 6. | 6 0.0012 407. 07 406. 77
PART FULL PART FULL
PART PART
FULL FULL
SI
26-0
24
414
4 IS
1000
12 410 00 403.00 0.0050
0. 3
--
0. 5 0.013
2.3
2.5-4- 2.3
0.06 --
PART FULL
PROP03EO
WATER PCB-SD0000005242
TABLE NO. 8-A
PLAN "B-A2" CLEAR WATER SYSTEM WITH STORM WATER (ALT. NO
LINE NO.
MANHOLES TOP OPM.H.ELCV LENOTH size
UPPER 2
LOWER UPPER 34
LOWER 5
iPT.j
(IN.) 7
1
2
t 42 5
417
990 4
30
2
2
1 42 5
417
995 4
30
&
2
1 42 5 4 17
903 * 2-36
F.L. ELEVATION
r. l.
UPPER 0'
LOWER 9
SLOPE to
400.00 397. 52 0.0025
397. 40 397. 30
390.40 0.0010 39 0.30 0.00 10
XNO. 11
37. 2
Q (CP 51 STORM TOTAL
12 13
RUTTER
Qfcrs*
n" CAPACITY TOTAL
14 13
10
49.S
67. 0
0.01 3 0.01 3 0.01 5
22 22 44
00
VEL ipps.i
17 4.7 3. 0 3.0
xL f"t.j
REQ, HYO.
ELEV. HYD.GRAD.
SLOPE UPPER LOWER
10 19 20 21
0. 34 --
PART PULL
0. 14 0.0013 401.01 400.32
0. 14 0.0013 401. 61 400. 32
4
3
2 4 19
42 5
1537 4
30 402.55 400. 03 0.00125 10. 0
10.0
27. 2 0.01 3
27
27 5.7
0.31 0.0000 412. 33 40 3.13
ft 4
3 413
419
105 4
30 4 02. 00 402. 55 0.00 125 10. 6
10.0
20. ft 0.01 3
27
27 5. 7
0.31 0.00 60 412. 9ft 4 I 2 33
e
5
4 41 7
413
60 5 4
30 403.4 3 402 00 0.00125 10. 4
15 0
25.4 0.01 3
20
26 3.3
0.47 0.0033 410. 29 41 2. 96
ft7 6
413
4 17
44 0 4 2- 24 404.77 404 .00 0. 0017 5
2. 0
10.7
12. 7 0.01 3
0.3
1 3 2.1
0.07 O.OOtI 410. 77 410. 29
e
7
0 4t 0
413
300 4-
24 40 5. 40 404.77 O.OOI6 5
--
7.9
7 9 0.01 3
0
0 2.3
0. 10 0-0010 417. 34 416. 77
9
0
7 41 5
410
4 00
to
0
7 415
4 10
400
11
6- tl
0 41 7
41 5
000
t 0 400 02 40 5 90 0.0017 5
--
0.01 3
2.3
t .4 0 .03 0.000 70 417 62 417. 34
7.9 7.9
7.9
24 407. 35 400. 05 0.0017 5
------
0.01 3
3.4
1.7 0.03 0.00070 417.62 4 17. 34
to 406.02 407 35 VARIES
--
1.2
1.2 O.OI 3
t. 2
I.2
1.4
0 03 0.000 10 417. 71 4 17. 02
12
9
0- A 4 1 7
417
350
15
V A C A T EO
13
9
0 4t 7
415
1232 4
24
ft14
to
2 41 0
42
1200 4 2- 30 40| 20 400. 00 0 0010
20.0
33 2
39.0 0.0 1 3
30
00
4.2
0.27 0.0025 406.33 403.13
15 ie
17 TABLE
te
19 20
21 19
22 19 23 21 24 20
25 21 20 22 27 23- A 20 20 29 27
30 30- A
27 9
to 10 19 19 20 21 22 23- A 20
21 27
42 0 420 4t0 420 410 417 4 17 417 417 417 417
4 1 ft 41 ft 420 420 420 419 417 417 417 410 41 7
140 4 118 4 7 54 4 4 50 4 205 4 25 1 4 1 00 4 2054 too 704 4 1 700
30 401. 63 40 1 . 50 0.00150 24 402. 00 402 43 0.00147
19 0
10.ft
300
0.01 3 0.01 3
24 403. 71 40 2. 60 0.00147 1 ] n
J J J30 402. 03 402. 02 O.OOlft
I 19. 0 1 16 ft (30. 0
30 403. 12 402. 00 0.00084
0.013 0.01 3 0.01 3
30 403.20 403 03 0 00099 19.3
10. 3 29.0 0 015
30 4 03. 04 403 36 0.00155 15.5
9. 5
25. 0 0.013
39 403 82 403. 64 0.00090 24 405. 12 403. 02 VARIES
11.3
--
9.S 5
21.0 3
0.01 5 0.0 IS
24 40 5. u 403.07 VARIES
0. 5
6S
9 0.01 3
30 409.SO 403. 70 0.0034
0. 3
13.3
14 0.013
26. e 10. 0
30. ft
13. 0 -
23. 0
30. ft
23. 0 -
-j29.6
23.0 21.0
30.0
3
9 -J
14.0
14.0
4. 1 3.2 4 .4 3. 2 3. 2 4. t 3.7 3.0 1.7 2.9 2.0
0.20 o. ie 0.30 0.42 0. 42 0.2ft 0.21 0. 14 0.03 0. 1 3 0.12
0.0022 400. 04 400. 33 0.0020 400.04 406.33
0.0030 410.41 400. 04 0.0030 40ft 93 40ft. 04 0.0030 410 .37 40 6.9 3 0.0023 411.02 410.4 1 0.0019 41 1. 30 41 t. 02 0.0013 41 1. 70 4 11. 3ft 0.0007 41 1 77 411.70 0.0021 411. Oft 410.41 0 0012 413.92 411.06 PROPOSED
31 ,
20-0
24
41 0
415
1000
12 410 .00 40 5. 00 0.00 so
0. 3
--
0. 3 0.01 3
1. 3
1.S+ 2.3
0.00
PART PULL
PROPOSED
WATER PCB-SD0000005243
TABLE NO. 7
PLAN-B-IA* TREATABLE WASTE SYSTEM WITH STORM WATER
m inch per hour)
-4 O Tl O *8
LINE NO. 1
MANHOLES UPPER LOWER
23
UPPER 4
MH. ELEV LENOTH LOWER IFT. ) 88
SIZE (IN.)
7
FL.ELEVATION
F L.
UPPER 9
LOWER SLOPE B 10
TREAT 11
Q ICFSI STORM TOTAL
12 IS
KUTTER
QICFSI
"rr
CAPACITY TOTAL
14 IS
16
VEL. lFPS.7
17
vl
[FT} 3 16
REQ. ELEV. HYD. ORAO.
9 LOPE UPPER 19 SO
LOWER 2
REMARKS
12
i 425
47
50
2 39 597.SO 399.30 0. 001 18 2 4.8
21.8
4 9.3 D.OI 3
23
46
33
0.17 0.0012 400.32 399.30
PROPOSED
t
2-A
2 428
428
18 0
39 4 00.28 397.30 0.0187
0.01 S
30 -i
44
0 30
--
PART FULL
PROP 0 S C 0
3
10 2 - A 4 1 8
428
1 1 00
39 401. 38 4 00.28 0.0010
2 4.5
21 .8
4 8.3 0.013
21
70 + 3.0
0 140 --
PART FULL
4 10
2 418
428
1280
39 4DI. 36 397. 30 0.00327
0 01 3
40 -*
8. 0
0 58
PART FULL
PROPOSED
5 11 10 423
6
12- A
II
420
7 13 12 -- A 42 1
418 423 420
950 i oeo
12 407. 08 4 04 95 0.0 021
03
12
--
407 03 0. 00408 0.3
12 4 11. 45
_
03
-- --
03 0 013 03 00 13 0.3 0.01 3
t8 20 20
t 8 -f ! 0-f 2 Q +
13 19 19
0 03 0.06 0 06
-- --
PART PART PART
FULL FULL FULL
PROPOSED PROPOSED PROPOSEO
6 19
zUJ
Zi
o
O
o
N
10 420
418
250
30 399 40 399 00 0 00 15
2 1.6
41 6 0 013
42
42
( PROPOSED P JMPlNO 51ATI ON AT M H 10 T 0 PUMP TH E SEWAGE IN LINE 8 IN
3A4 >
56
0 49 0 0035 402.86 402 00
PROPO SED
9 19
10 420
4 16
230
18 403 10 404 83 OOOIO
24
13
< LINE 9 CON IECTS T D THE 0 SCHARGE SIDE OF LIF' STATION)
3 7 0 0 13
4
4
22
0 08 0 0014 406 32 40 6 33
PROPOSEO
10 20
19 420
42o
460
II 2 1
20 4 1 6
420
290
12 23
21 4 1 7
4 16
330
13 24
23 4 15
4 17
2 20
14
28- A
24
41 6 +
4 15
230
13
28 - 8 28 - A 4 18 +
4|6 +
4 SO
16
28- C 28- B I6 t
< ia 1
600
36 39 9 93 39 9 40 0 0012 36 400 30 399 95 0.0012 36 4 D 0. 37 400. 30 0.0012 38 40 0. 83 400 37 0 0012 21 404. 74 401 10 0 01 46 21 403. 24 404. 74 0.00 II 21 406.12 4 05 24 0. 0011
21 8 2 0. < 19 1 18 8
43 I6 1.6
20.5 18.9 17 1 I70
34 3 3.2
423 39 0 36.2 338
9.7
S3 48
0.013 0. 013 0 013 0 013 0.013 0 013 0 013
42 39 36 36 10
5 3
42
56
0 49 0 0 033 4 04 47 402.86
PROPOSED
39
5S
0 47 0 0033 403. 41 404 47
PRO POS ED
36
50
0 39 0 0027 406 30 403 31
PROPOSE 0
36
50
0 39 0 0027 406.93 40 6 3 0
PROPOSED
t0
42
0 27 0. 00 40 407. 93 406.93
PROPOSED
a 21
0 07 0 001 0 406.38 407 93
PROPOSE 0
5
21
0 07 0 0010 409. 16 408 36
PRO POSE 0
17 It le-A
25 27
9
IB 25
24 414 25 41 7 27 4 1 7
24 4 1 6
45 4 14 41 7
100 130 1700
2-24 2-24
.a
401. 27 40 t. 10 0 00174 401 SO 401 27 0 00174 409 30 4 0 1 . 70 0. 0046
14.5 14 3
4. 8
14. 1
--7 4
418
1 44
18 407. 23 402.0 0 0- 0400
O 2 4.2
26.6 217
4.5
0.013 0 01 3 0013
4.4 0013
1 4.3 11
7+
29 22
7+
46 35 43
4 3 4.8 2 5
0. 33 0.0042 407. 33
0. 19 0.0024 407. 66 0 29 0.0046 --
406.93 407 33 407 86
PROPOSEO PROPOSED PRDPDSE 0
0 10 0 0019 407.6 i 407.33
PROPOSEO
20
3
19 419
420
1900
21
4
3 4 13
4 19
108
22 4-A
4 41 8
413
200
23
8
4-A
417
418
409
24 8
5 413
417
440
23 0 M 1 T T E D t 0 M 1 T T E 0
18 406.24 4 OS- 10 0 0006 16 408. 30 406 24 0 0006 18 4 0 0.80 406.30 O.ODIO 18 409.78 4 0 6.30 Q00063 16 4 0 7. 0 9 406.78 0.00093
24 2. 4 2. 4 2. 2 1.3
1. 3 1.3 -- 0-1 --
3 7 001 3 3.7 0.013 2.4 0.013 2 3 0 013 IS 0- 013
4 4 23 2.3 1.3
4
2.2
0 08 O.OOt 4 409 18 408.32
PROPOSEO
4
22
0 06 0.0014 40 9-3 3 409.18
PROPOSEO
2.5
15
0 0 3 0.0003 409.43 409. 33
PROPOSEO
25
15
0 0 3 0 0003 409.63 4 0 9. 43
PROPOSEO
1.3
i0
0 02 0 0002 409. 7 3 409.63
PROPOSEO
2 7 4 8 4 418
4 i3
120
24 406.88 408. 1 9 0.0030 0. 1 1.2
1. 3 0.0 13
1.8
1.3 1.0 0 02 a 0002 4 09. 36 409.33 PROPOSED TO REPLACE EXI5TINO LINE
WATER PCB-SD0000005244
TABLE NO. 8
LINE NO. 1 1 2 3 4 5
PLAN 'C" TREATABLE
MANHOLE 3
TOP OF MH ELEV LENGTH
UPPER LOWER UPPER LOWER CFT.7
23 4 5
6
5IZE (IN.1
7
2
1
425
417
996 4-
36
2
i
425
417
9954-
36
2
i
42 5
417
9634- 2 -36
to
2
416
425
12804 2-36
to
2
416
425
1262 4
36
WASTE SYSTEM WITHOUT STORM
FL.ELEVATION
UPPER 6
LOWER 9
F.L. SLOPE
to
QCCF53 KUTTER QCCFS 3 MAXIMUM VEL. _xf
TREAT. II
*n* 12
CAPACITY TOTAL 13 14
(FP3.1 FTV
13 16
400.00 397.52 0.0025
0.015
29
----
397.40 396.40 0.0010
24.5 0.015
19
66 -4"
--
--
39 7 30 396.30 0 0010
0.015
38
----
401.26 400.00 0 0010
0.015
38
--
--
24. 5
" +
401.38 400.12 0.0010
0.015
19
WATER
REQ. SLOPE
17 -- -- --
-- __
ELEV. HYD. GRAD UPPER LOWER
16 19
PART PART PART PART PART
FULL FULL FULL FULL FULL
6
n
10
423
416
950
7 12- A II
420
423
1060
13
12- A
421
420
12 407.05 404 95 0.0021
0.3 0.013
12 ------------ 407.05
0.3
0.013
0.00406
12
f.6 2
1.6 +* 2+
1. 3 1. 9
0.03 0.0 6
--
PART PART PART
FULL PROPOSEO
FULL FULL
PROPOSED PROPOSED
9
19
10
420
416
140 4
36 401.63 401.56 0.0016
0015
19
--
--
--
PART
FULL
24.2
26 +
10
19
10 420 416
lie 4
24 402 60 40243 0.00147
0.019
7
PART
FULL.
1n
39
19
415
420
900
24 404.73 402.66 0.00226 6.9
0 013
10
t12
3
39
419
415
1000
24 406.13 404.73 0.001 4
6.9 0 013
9
i3
4
3
413
4 19
105
24 406. 19 406. 13 0.0006
6.9 0 013
6
14
4-A
4
4 16
4 13
200
24 406.50 406. 19 0.00 15
66 0 013
6
IS
a
4-A
417
4 16
405
24 406.76 406 50 0.00064 66 0 013
7
16
a
5
413
4 17
440
24 40704 406.76 0. 00064 59
0 013
6
17
7
6 416 4 13 360
21 406 12 407 |2 0.00 27
4 5 0 013
6
16
9
7
417
4 16
1630
21
409 50 406 12 0 00085
45
0 013
6
10 -f 9 48 4 47 4 4-
4a +
-- -- -- -- 1.9 1.9 1. 9
-- --
-- -- 0 06 0.06 0. 06
-- -- -- -- -- --
PART PART PART PART PART PART PART PART
FULL PROPOSED FULL PROPOSED
FULL PROPOSED FULL PROPOSED FULL PROPOSED FULL PROPOSED FULL PROPQSEO FULL PROPOSED
19
4-B 4 415 413
120 4 24 406 55 406. 1 9 0.0030 0 i 0.013
2
2 4- 1.0
0.05
PART
FULL
PROPOSED TO REPLACE EXI5T
LINE
20
21
19
416
420
754 4-
24 403. 7i 402 60 0.00147
5 9 0 015
2<
20
19
420
420
436 4
30 402 63 402 02 OOOI6
11.5
0 015
22
21
20
416
420
265 4
30 403 12 402 66 0.00064
96 0 015
23
26
21
4 15
418
696 4
36 403 92 403 03 0 00090
9.6 0. 015
24
23
2i
417
4 16
329 4
24 404 16 403 87 0 00095 4.9 0 015
25
2A
23
4(5
4 17
231 4
24 404 40 404 16 0.00095'
46
0. 015
26 25 24 414 415
27
26 - A
24-
416 1 414
64 4 300
24 404 91 404 4 4 0 0071 30 405.21 404.91 0.0010
4 6 0.015 4.4 0. OQ
26
26-B
28-A
416 - 416 I 450
29
28 -C
26-B
410 Z 410 Z 600
30 405.66 405 21 0.0010 30 406 12 405.66 0.00077
i. 6 0 013 1 6 0 013
7
<s
--
3-* --
10 --
17 <7 4- --
6 4- -- 6 *+ -- 16 16 4- --
13 134- 2.4
13 13 4- 1. 6
13 114 1.6
-- -- --
-- -- --
-- 0.09 0.05 0 05
--
-------
--
-- --
--
--
-- --
PART PART PART
PART PART PART PART PART PART PART
FULL FULL FULL
FULL
FULL
FULL
FULL FULL
PROPOSED
FULL PROPOSED
FULL PROPOSED
30
26 25 416
414
144 f
16 405 75 405 50 0 00174
02 ooi a
4
. 4- 1. 1
0 02
--
PART
FULL
MPI4PUI4 n*Tll*4
' '
'
ion W OOI flfNBFBfl
WATER PCB-SD0000005245
TABLE NO. 0
LINE HO. 1
1 2 3 4 3
PLAN 'C' TREATABLE WASTE SYSTEM WITH
MANHOLE*
TOP OF M.H CLEV. LENOTH 3iZE
UPPER 2
LOWER UPPER 34
LOWER 3
* FT. 1 6
MN. i 7
2
1
423
4 17
996 4- 36
2
1
423
417
9934- 3 6
2
1
423
417
963 4 2-36
10
2
46
423
1260 4 2-36
10
2
46
423
12 624
36
FL ELEVATION
F.L.
UPPER LOWER SLOPE
6 9 10
Q (CF51
TREAT. STORM II 12
TOTAL f3
RUTTER
QICFS)
TV CAPACITY TOTAL 14 13 16
400.00 397. 52 0. 0023
0.013
29
397 40 397 30
396 40 0 00 10 396.30 0. 00 10
24. 3
44.3
66 6
00 13 0.01 5
i 9 ts436
401. 26 400 00 0 00 10
0 013
46
24. 3 44. 3
66 6
69
40 i. 36 400 12 0 0 0 10
0 01 S
23
STORM WATER i i.i* INCH PER HOUR >
VEL. IFPS.i
17
r4S
l FT* 16
REQ HYO. SLOPE
19
ELEV. HYO. ORAO UPPER LOWER
20 21
REMARKS
--
-- -- PAR T FULL
-- -- -- PART TULL
--
-- -- PART FULL
2.7 2.7
0.11 0. 11
0.00142 404.64 403 00 0 00142 404.64 403 OO
6
II
10
423
416
930
12 407. 03 404 95 0 0021 0- 3
--
0 3 0.013
i.a
1 8-f-
13
0 03
-
PART FULL
PROPOSED
12- A
12-A
420 42 i
423
1060
407 03
0 00406
12 4 1 1 .4 3
03
0 3 0 0 13
2-f *+
PAR T PAR T
FULL FULL
PROPOSE0 PROPOSED
9
19
10
420
416
140 4
36
40 i 63 40 1. 38 0 00 16
0.01 S
so
3.3
0.19 0.0073 403. 66404.64
24. 2 44. 3
66. 3
66
10
19
10
420
416
116 4 24 402.60 402.43 0 00147
00 13
1a
2.4 0.09 0.0095 405.77 404.64
li 39 19 4 5 - 420 900
12
3
39
419
413 2 i 000
13 4
3
43
419
103
M 4 -A
4
416
413
200
13
3
4- A
417
416
403
ie
e
3
413
417
440
17
7
6
46
413
360
la
9
7
47
416
r 630
24 404 7 3 402 66 0 0C226 e g 24 406 I 3 404 73 0 .00 14 6 9 24 406 19 406 13 0 0006 6 9 24 4u8 50 406 |9 0 0013 6 6 24 406 76 406 30 0 00064 6. 6 24 407 04 406.76 0 00064 3.9 21 406 12 407 12 0.0036 4 3 21 409 50 406 12 0 00085 4 5
23 2.3 2.3 03 03 -- --
92 9.2 92 7. 7. 59 5. 9 39
0.013 0. 0 13 0- 01 3 0.013 0. 0 1 3 0 0 13 0 0 13 0 013
92 9 2 92 9 2 92 9 2 7 1 7.1 I1 7 3.9 5.9 5.9 3.9 5.9 39
3.0 3.0 30 2.3 2.3 i9 19 1. 9
0 14 0.0017 407.30 403.77
0. 14 0 001 7 409.00 40 7 30
0. 14 0 001 7 409 16 40 9 00
0.06 0.06
0.00093 409.37 409 16 0.00093 409 73 409 37
0.06 0-0007 4 1006 409-73
0.06 0.0014 4 10 37 410 06
0.06 0 0014 4 12.63 410 37
PROPOSEO PR OPOSEO PROPOSED PROPOSER PROPOSEO PROPOSED PROPOSED PROPOSED
19 4-B
4
413
413
120 24 406. 53 406.19 0 0030 0.1
2.0 2 i 0 0 13 2.0 2.0 1. 0
0.02 0 000 i 409 19 409 16
PROPOSED TO REPLACE EXISTING LINE
20 21
19
21 20 19
22 21
20
23 26 21
24 23 21
23 24 26 1 23
23 24
27
28- A
a-
26 26- B 28 - A
29 26- C 26- B
416 420
420 420
754 4 24 403 71 402.60 0 00147 3.9
4 38 4
30
402.63 402.02 0. 00 16 11.3
4 16
42D
2634 30 403 12 402.66 0 00084 9.6
41 3 4|7
416 416
6 96 4 36
403. 92 40 3 03 D 00090 9.6
329 4 24 404.16 403 67 0 00093 4 9
4i3
417
23 i 4 24 404 40 404.16 0 00095 4 7
4 14
413
64 4 24 404.91 404.44 0.0071 4 5
4162 414
300
30 405 21 404 91 0 00 10 4 3
416 t 416 t
4 50
30 405. 66 4 0 3.21 0 00 10 1.6
4IB t 4ie t
600
30 406. 12 403.66 0. 0 0071 1.6
30 1 26
23
416
414
144 4
16
403- 75 405. SO 0. 00174 0.2
14.2 27.7 24 a
23 2 10 8 10 6 10.0
97
68 3.6
20 1 39 2 34.6
33 0 1 3.7 1 5.3 1 S.l 14.0
6.2 7.4
0 015 0.01 3 0. 9 1 5 0 0 15 0013 0.0 i 5 0.0 1 3 001 3
0.01 3 0.01 3
7. 6
7. 6 0.01 3
20 1 392 34 6
]}!,s
rMT .
33 0 13 7 133 15 1 140
35 0 13 7 13.3 1 3. 1 14.0
6 2 6.2 7.4 7 4
6.3 6.0 71
4.6 5.0 4. 6 46 2. 9 i. a i. 7
7.6 7.6 4.4
0.63 0.99 0.76
0 Oil 0.012 0.010
0.33 0.39
0.0033 0 007 3
0.33 0.0065 0.33 0.006 5 0. 13 0.0012
0.03 0. 0004 0.04 0.0003
0.30 0.0060
414.07 403.77 411.27 40 3.7 7 414. 12 411.27 416. 36 414. 12 416.39 414. 12 416.09 416.39 416.30 416 09 41 6.66 416.30 419.04 41666 41 9 22 419. 04
416.39 416.50
f
>N PROPOSED -- 2"
*$
PROPOSEO -- ae * PROPOSED -- U
SS <n K O-
*
-1 O DlI < OU o* >- Ok *1-0
WATER PCB-SD0000005246
TABLE NO. 10
LAN 'C" CLEAR
LINK NO. 1
1
MANHOLES TOP or M.H.ELEV LENOTH UPPER LOWER UPPER LOWER *FT. *
2 34 3
SIZE 11 Ml
7
12
423
417
1200
2-28
WATER SYSTEM WITHOUT STORM WATER
P.L. ELEVATION UPPER LOWER
69
P.L. SLOPE
10
QCCP8) RUTTER QlCFS> MAXIMUM
INDUSTRY rr
CAPACITY TOTAL
11 12 12 14
VEL. CFPS.I
13
400.6 296.30 0.0033 37.2 0.013
22
ee +
v/ ft!
16
REQ. HY0. SLOPE
17
ELEV. HYD.6RAD. UPPER LOWER
IS 19
PART
FULL
PROPOSED
22
2 419
423
1337 4 30
402. S3 400.00 0.00123 7. 3
0.013
I3
13+
PART
FULL
2 40
2 413 4 428
8 00
2-36 401. 36 400.38 0.0010
29.3 0 .01 3
22
44-f --
--
--
PART
FULL
PROPOSEO
4
29
40
413 + 413 4 200
2-30 401. 36 401. 38 0.0010
23
0.01 3
13
28 + --
--
--
PART
FULL PROPOSED
t2
2
38
418
413
10 00
36 402.41 4 01. 38 0.00063
6.0 0.013
12
'2 +
PART
FULL
PROPOSED
04 74
3 413 3 413
419 419
1 03 4 1 03
30 30
402. 68 402.33 0.00123 402 68 4 02. 3 3 0.0012 3
1 1.1
0.013 0.013
13 14
27 +
--
----
_
PART PART
FULL FULL
PROPOSED
8
4- A
4 418 413
2 00
30 402. 93 4 0 2.88 0.00123
0.013
13
--
--
--
PART
FULL
II. 1
27 +
4- A 4 418 413
200
30 402.93 402.86 0.00125
0.013
14
--
--
--
PART
FULL
PROPOSED
10
3
4- A 417
418
4 05
30 403.43 402. 93 0.00125
0.013
10.9
I3
2* +
--
--
--
PART
FULL
--II
3
4- A 417
418
403
30 403.43 402.93 0.00 125
0.013
14
--
--
PART
FULL
PROPOSED
12 8
3 413 417
440 4 2-24 404. 7 7 404 .00 0.00173
2.3 0.01 5
8
18-4- 2.2
0.06
--
PART
FULL
13 7 14 7 13 8 18 8
e 418 413
3 80 4
24
40 3.4 0 404. 77 0.00173
0.3
0.015
8
1. 2
0.02
--
PART
FULL
+
8 418 413
360
24 403.40 4 04. 77 0.00173
0.013
9
1.2
0.02
--
PART
FULL
PROPOSED
-- --7 413 418 4 00
16 407. 22 405. 90 0.00165
0.013
4
1. 4
0.02
---
PART
ASSUMING FLOW FULL DryOTTED TO THIS
0.3
'2 +
7 415 418
4 00
24 407. 33 408.83 0.0017 3
0.013
6
_
PART
FULL
17 8- A
8 417 41 3
8 80
16 406.82 407.33 VARIES
1 0.013
18
9
8- A 417
417
330
16 410 00 4 08. 62 0.06337 I ts 0.01 3
Jo.ar
18 9
8
417
415
1232 4 24
409.30 407.33 0.00173
0.01 3
4
61 8.
1. 4 2. 1
0.03 0.07
-- --
PART PART PART
FULL FULL FU LL
rnmnw*
LINE PROPOSED
20 28
*39 413 413 + 1000
20
403. 00 401.70 0.0013
19.3 0.013
19
21
27
28 418 t 4.8t 230
30
403.33 403.00 0.00 |3
I 3.3 0.013
10
22 28 37 410 4 416 4 230
30 403. 68 403.33 0.0013 1 I. 3 0.013
12
19
4.0
0.23 0.0024 400. 80 404.20 PROPOSED
16
3-3
0.1 7 0.0013 408.97 408.80 PROPOSED
12
2.5
0.1 0 0.0006 407. 17 406. 97 PROPOSED
m A22
K>- A 40 418
4.3 t 860
28
402. 20 40 1.58 0.00084
6.6 0.013
21
21 + 2.4
0.09
PART
FULL
PROPOSED
to
10- A 418
t
120
^ 402.30
0 012
6.7
8.7
4. 0
0.23 0.0043 404.82 404.30 PROPOSED
0.6
25 10 10- A 418
24 402.40 402.20
0.013
INVERTED SIPHON
20 II 27 II
10 423 418 10 422 419
9 20 6 70
24 406.49 402.40 0.00447
0.013
6.6
21 40 6.67 402. 68 000423
0.013
13 9
22 4-
-- --
-- --
-- --
PART PART
FULL FULL
28 12 29 12
II 424 423 II 424 42 3
3 30 3 30
24 40 6.06 406.49 0.00447 3-1 0.013
21
407.64 406.47 0.00423
1.6 0.013
13 6
22 +
-- 2.6
-- 0. It
-- --
PART PART
FULL TULL
20 13 21 12
12 421 12 421
424 424
7 30 7 60
24 41 1. 4 5 408.06 0.00447 1.3 0.013
21
41 1.23 4 0 7.64 0.00423
1.6 0.013
13 9
22 +
2.6 2.8
0. 10 0. 12
-- --
PART PART
FULL FULL
32 28 -0
200,000 OPO INDUJTI IAL WA 1TE <0.488 era PUUPI E} IN A 1 - PIPE TO LEWIN MATh C8 244 SEWER
UFUPHIS DATUM
JOS. W. OOLOEMBEM
WATER PCB-SD0000005247
TABLE NO. I
PLAN "C CLEAR WATER SYSTEM WITH STORM VYATER u.a INCH PER HOUR)
6LINE manholes TOP OFM.H.ELEV. LENGTH IZE PL. ELEVATION
P.L.
NO. upper lower UPPER LOWER
1 >s4
0
fPT.I
0
(IN.) UPPER LOWER SLOPE XNO.
7 a 9 10 11
1 2 1 423 4IT 1200 2-36 400. S 3*9 .30 6.0033 37. 2
Q(CPS)
STORM TOTAL
12 18 44.S 61.7
RUTTER
Q( CPS)
TP CAPACITY TOTAL
14 13 16
0.013 41 62
VEL.
*PP3.) 17
3.7
CPT1 16 0.30
REQ ELEV. HTD. QRAD.
SLOPE UPPER LOWER
19 20 21 0.0033 403.50 399.30
REMARKS PROPOSED
21 3 40
2 410 423 13374 30 402. 3 a 400.90 0.0012 3 7.6 9.0 16. 5 0.013 11 2 41 3 * 423 066 2-36 401. 36 400.36 0.0010 29.6 33.7 63.2 9.013 31
i.i 2 O 0.06 0.0022 409. 66 403.30 62 4. 3 0.29 0-002 3 403. 34 403.50 PROPOSED
A 30 40
41 3 + 200 2-36 401. 36 401 *6 0.001Q 23 21 44 0.013 20 40 2. 9 0.13 o.ooio 405. 34 403.34 PROPOSED
5 3 30 410 415 i 1000 36 402.4 1 401. 36 0*00063 6.0 16.7 24. 7 0.013 11 22 1. 6 0.03 0.0013 408.64 403. 54 PR0P03 ED
7
4 4
3 413 3 41,3
410 410
103 4 103
30 30
402.66 402.35 0.00123 402. 66 402- 55 0.00123
II. 1
30.1
41.2
0.015 0.013
21
Zl
42
4.2 4. 3
0.27 0.0033 407.24 406.67 0.29 0.0026 407 . 1 7 406.67 PROPOSED
4-A 4 41 e 413 200 4-A 4 41 6 413 200
30 30
402.*3 402.66 0.00123 402.93 402. 66 0.0012 3
11.1
29.5
40. B
0.013 0.013
21 21
42
4. 2 4. 3
0.27 0.0033 407 .94 40 7.24 0.29 0.002 6 407 .94 407 .24 PROPO 3ED
to
11
a 4-A 417 416 403 3 4-A 417 416 403
30 30
403.4 3 402. 93 0.00123 403.4 3 402. 93 0.00123
10.9
26.1
39.0
0013 0.013
20 20
40
4. 1 4 .2
0.26 0 0034 409. 32 40 7.94 0.27 0 0027 409.32 407.94 PR0P03E0
12 e 5 413 417 440 4 2-24 404.77 404.00 0.00173 2.3 24.2 26.7 0.013 13 26 4. | 0.29 0.0043 411. 30 409.32
13 14
7 7
0 4 IB 6 41B
413 4t *
360 4 360
24 24
403.40 403.40
404.77 0.0017 5 404.77 0.00173
0.3
21. 4 21.9
0.0 13 0-0 1 3
ll ii
22
3. 3 6. 1
0.19 0.0027 412. 27 41 1.30 0.56 0.0024 412. 27 411.30 PROPOSED
13 16
0
7 413 A t 400 7 4 1 3 4 16 400
16 24
407. 22 407. 35
403.90 0.00165 406. 65 0.0017 3
0.5
21.4 21.9
0.01 5 0.01 3
7
13
22
3. 9 4. 8
0.24 o.ooeo 414. 67 412. 27 0.33 0.0060 414 67 412. 27
17
170- A
0
4
IB 0 B-A 417
IB 1 0
0 417
4 15 6B0 16 406. 8 2 407. 33 VARIES 1 ] 1
0.0 1 3 3 1
4 17 4 13
330 1232 4
16 24
410.00 409.30
406.62 407. 33
0.00337 0.00173
J
0.3
J1 14.6 J 15.1
0.013 0.0 IS
3 10
J IS
2.6 2. 6 63.
0.12 0. 0023 417 IS 414. 67
0.12 0. 20
0.0023 417 . 93 417.13 0. 0023 417 . 77 4 14.67
PROPOSED EXISTING
1T3O-
REPLACE LINE
20 30 30 4te + 416 * 1000 30 403.00 401.70 0 0013 19.3
19.3 0.013 19 19 4.0 0.23 0.0024 407.94 405.34 PROPOSED
21 37 SB 416 1 418 1 230 30 403.33 403.00 0.0013 13. 3 -- 13.3 0.013 16 16 3.3 0.17 0.0014 406.29 407.94 PROPOSED
22 30 37 416 t 4.8 1 250 30 403. 66 403.33 0.0013 11.5
11.3 0.013 12 12 2. 3 0.10 0.0006 400.74 400.29 P R0P03ED
1
j
23 4010-A 416 415 t 680 24 10 10- A 416 416 120 23 10 10-A 416 416 1 20 20 II 10 423 416 *20 27 II 10 423 416 670 20 12 II 424 423 330 2* 12 II 424 423 330 30 13 12 42 424 730 31 IS 12 421 424 760
36 402.30 401. 36 0.00064 6.6
16 402.40 402.30
24 402.40 402.30
24 21
406.49 409.67
402.40 0.00447 402.66 0.00423
6.6
24 406.06 406.49 0.00447 3. 1
21 407.64 406. 47 0.00426 1.6
24 411.43 406.06 0.00447 1. 3
21 411.23 407.84 0. 00423 1.6
14.4 21.2 14.4
14.4 21.2
9.6 4. 7
21.2
1.6
4.7
0.013 21
0.013 6.7
0.013 14. 3
0.013 12
0.013 6
0.013 16
0.013 8
0.013 6
O.Offr
6
21
21 21
3-0 0.14 0.00093 406.17 405.34 PROPOSED 6. 6 0.22 0.0043 406.69 400. 17 PROPOSED 4.6 033 0.0043 406.29 406. 17 INVERTED SIPHON 3.6 0.24 0.0040 410.36 406.09 3. 7 0.21 0.0042 410. 34 406. 39 4.6 0.33 0.0067 412. 36 410. 30 2. 3 0.09 0.00 24 4 11. 22 4 1 0. 38 2 .0 O.OB --- - PART PULL 2.3 0.10 0.0024 413.10 411.22
32 20-D
300.000 OPD INDUSTIj IAL WAS 't 10.488 era 1 8PUMPS 3 IN a t- rir TO LE| WIN MA HES---- WCR
WATER PCB-SD0000005248
TABLE NO. 12
PLAN "C-l'TREATABLE WASTE SYSTEM WITH STORM WATER
LINE NO 1
1 8 8 4 5
M AHHOLES TOP OP M.H.ELEV LENOTH SIZE
UPPER LOWER UPPER LOWER cm
ON.)
234
5 07
P.L. ELEVATION
P.L.
UPPER LOWER SLOPE
8 9 10
TREAT 11
Qtcrst
KUTTER
Qicrsi
STORM TOTAL TV CAPACITY total
12 13 14 15
18
2
1
425
41 7
903 4- 2-- 36 397. 30 395 30 0 0010
** 015
19
2 425
4i7
998 4-
30 400. 00 397. 52 0.0025
0.01 8
29
24.8
24.9
49.1
7-f
2
425
417
99 5 +
36 397.40 396.40 0.0010
0.0 13
19
10
2
40
425
1200 4- 2- 30 401.28 400.00 0.0010
0.015
30
24.3
24.0
49.1
57 +
10
2
40
425
>262 4.
30 401 . 30 400. 12 0.0010
0 015
I9
VEL.
V2
trps.) <FT* 17 10
----- -- -- --
--
-- --
-- ' "L
< l-INCH PER HOUR I
REQ. ELEV. HYD.ORAD. SLOPE UPPER LOWER
19 20 21
---- --
PART PART PART
FULL FULL FULL
--
PART PART
FULL FULL
REMARKS
e
11
10
423
410
9 30
7
1 2- A
11
420
423
1000
8
13
12- A
42 1
420
12 407. 05 4 04. 93 0 0021
12
--
407.03 0 000401
12 411.45
0.3 0. 3 03
-- --
03 0. 3 0.3
0.01 3 O.OI 3 0 013
1.0 2.0 2.0
15 +
za 4-
20 4
1. 3 I. 9 1.9
003 OO 8 008
PART PART PART
FULL FULL FULL
PROPO SED PROPO 5EO PR OPO SED
9
19
10
420
410
140 4-
30 401 63 4 01 50 0.0018
0 015
30
50
0 39 0 0035 405 07 404. 50
24. 2
2 4.6 43 0
49
10 19
10
420
4 10
110-4
24 402.60 4 02 43 0 00147
0.015
13
4.2
0.27 O. 0048 405 12 404.50
11 39 12 3
*-
19
4 1 3 _ 420
900
39
419
4 1 3 t 1 ooo
t3 4 14 4- A
3 4
43 40
419 4 13
105 200
t3
3
4- A
4| 7
41 0
405
to a
3
413
41 7
440
17 7 t0 9
0
4 10
41 3
360
7
417
418
1030
2 1 404. 73 402.75 0 0022 2 1 406 1 3 4 04 7 3 0 0014 2 1 406 1 9 4 00 13 O 0006 2 1 400. 50 400 t9 0.0015 21 400 70 406.30 000064 21 407 04 4 06.76 0 00064 21 400 12 4 C7. 04 0 00 30 2 1 409 30 400 12 0 00003
69 69 69
6 6. 0 59 45 45
13 13 i3 0.2
0.2 -- --
32 6.2 02 70
7.0 59 45 45
0.013 0 013 0 013 0. 0 1 3 0 013 0 013 0 013 0 013
0 6 0 7 7 6 4.3 4.5
0 0 6 7 7 6 4.5 4.3
3.3 3. 3 3.3 29 29 25 1.9 1.9
07 0.1 7 0.1 7 0.1 3 013 0-0 9
0.0 0 00 8
0.0028 407.40 403 12 0 0026 409 06 407.40 0 0020 409.33 409-06 0.00 1 9 409-71 409.33 0 00 1 9 410 40 409- 7 t 0 0014 41 t.09 410.40 0 000 0 411. 30 4 11 09 O.DOOO 414. 69 411.30
PROPOSEO PROPO5E0 PROPOSED PR OPOSED PR OPO SED PR DP O SED
PROPOSED PROPO SEO
19 4 -8
4
45
4 13
120 4-
24 400.53 406 19 0 0030
0. 1
,,
1 .2 0.013
2
2
1. 3
DO 8
0 0001 409. 34 409.33 PROPOSED TD REPLACE EXISTING LINE
20 a 21 20 22 21 23 20
24 23
20 24
** . 20
25
20- A
20- B
28- C
19 19 20 21
21 23 24 24 20- A 28- B
40 420 4 18 43
417 413 414 4...1 4ie! I.i
420 420 420 410
4t 6 41 7
413 4 K4 *i! 4 10*
734 4 450 4 283 4 098 4
329 4 231 4
84 4 300 4 30 OOO
24 403 7 1 402.00 0 0014 7 30 402. 03 4 02.02 0.0018 30 403. !2 4 02 08 0 00084 38 403 92 4 03 03 000090
24 40i i a 4 03 07 0 00095 24 404.40 404. t6 0 00095 24 404. 91 404.44 0.0071 24 405. 18 404.91 0.0009 24 405. 58 4 0 5. 18 0.0009 24 400 12 403.55 0.0009
5. 9 tl. 3
90 9. 6
4.9 40
4. 6 4.4 1.0
10
7.0 13 3
13. 7 t4. 0
6.0
3- 9
39 34 3. 7 3. 2
13. 5 27.0 23 3 23. 0
>0.9 10 7 tO. 3
9.8 3-3 4.8
0.013 0.015 0015 O.OI 5
0.013 0.01 3 0 01 3 0.013 0.013 0.013
13. 5 27 23.3 24
II It 10. 3 to 3
3
j
24 t1 11 10.5 10
3 3
4.2 5. 7 4. 0 3.3
3.3 3. 3 3.4 32 1.0 10
0.27 0.80 0.33 0.1 7
0.1 9 0.1 9 0. to 0 16 0.04 0.04
0.0047 408. 87 40 5.12 0.0035 4D7. 02 403. 12 0. 0030 400. 72 407. 82 0- 0018 409. 97 408.72
0.0030 409 71 408 72 0.0030 410.40 409.71
0 0028 410. 55 410. 40
0.0028 4ll. 38 410.55 0.00083 411. 83 41 1.36 0.00083 412. 04 41 1 65
PROPOSCO PROPO SED PROPOSED
3 O 20
25
4 18
4 14
144 4
18 405.75 4 0 5.30 0.00174
0.2
4.2
4.4 0.013
4.5
4.5
24
0.09
0.0023 410.91 4 1 0. 58
ia
nrN*rnn
WATER PCB-SD0000005249
TABLE NO. 13
LINE NO.
PLAN X-r CLEAR WATER SYSTEM WITH STORM WATER 11 - INCH PER HOUR >
UPPER
TOP OPM.H.CLEV. LOWER UPPER LOWER
PT.
SIZE IN.
P.L. ELEVATION UPPER LOWER
r.L SLOPE
STORM
TOTAL
KUTTER -n* CAPACmr TOTAL
VEL.
FPS. *r2T9i
REQ. HYO. SLOPE
ELEV. HYO.ORAD
400.50 396.30
37.2 30.0 67. 2
62 +
PART FULL
PROPOSED
3
2
4I 9
423
13 374
30 402. 53400.60 0.0012 5 II . I
22.0 33. I 0.0 rs
33
33
4
3
4I 3
419
1054;
30 402.68402.35 0.0012 3 I I . I
2 1-6 32. 7 0. 01 5
33
33
4-A
4
4I 6
4IS
2 00
30 402.93402.66 0.0012 3 I 0.9 2 I. I 32. O 0. 0 1 5
32
32
3-A 4-A 4I 7
4I6
4 03
30 403.43 402.93 0 00123 10.9 21.1 32. O 0.013
32
32
6
3
4I 3
417
4 4 0 4) 2 -24 4 04.77 404.00 0 .0017 5
2. 3
16.6 21.3 0.01 3
II
22
7
6
4I 8
413
3 60
24 405.40 404.77 0.00175
05
I 7 2 17.7 0.01 5
I6
I6
5
7
4I 3
4 16
4 00
18 407. 22 40 5 90 0.00163
0 0 13
6
0. 5 17.2 17. 7
6
4I 3
4I6
4 00
24 407. 33 406.63 O 0017 3
0.015
I2
a- a
4I 7
4 13
880
II
a- a 4 I 7
4I7
3 30
I 8 406.62 407 3 3 VARIES
I 8 4 10 .00 406.62 0.00337
}0. O I 5
44
0. 01 3
44
12 32 4|12 8 4 I 5
24 409.60 407.33 O 00173
O. 0 I 5
9.3
7. 0 7. 0
6. 5
63 3.3 3. 9 33 3. 9 24 24 3.0
076 0.0063 4 i6.60 403.50
O 76 0.63
0.0063 0.00 60
4 17.50 419.10
416.60 417.50
0.6 3 O |7
0.0060 0 0026
422.33 419. 10 423.76 422 S3
0.34 O.OC 90 0|7 0 004 2 O .2 3 0 004 2
427.02 423 76 428.70 427. 02 426.70 427 02
O 09 000 2 3 430 73 426.70
O .0 9 0 002 3 O | 4 0.002 3
431 34 430 73 431 34 428 70
ZtJ
I- *4
uor <xO&.N
c f-v; o a/ y i$
ft
X 1>- IDf <
40 I. 30 400.30
a. 0 34. 1
40330 403.50
PRO PO SCO
14 39 40 4 16 4 I 3 _ 2 00
15 38 39 4 I 6 t 416 1 1000
2 3016 37 36 4 I fl 1 4 16 t
17 36 3a 41 6 1 416 2 50
0.00134 0 I . 70 401.44
4 0 3.00 4 0 1.70 0.0013 403. 33 403.00 0 001 3 403.66403.33 0 001 3
I 9. 3
19. 3
I 3- 3
11.3
I 9. 3 19 3 15. 5 I I. 3
0.013 0. 01 3 0. 01 3 0. 0 I 3
I9 I9 I 5. 5 I I. 5
I9
I9
I5 5 II 3
4.0 4.0 3.3
2.3
0.25 O .25 0. 17
0 0024 0 .0024 0.0014
0. 10 0.0006
403 96 4 03 50 407 66 4 0 3 4 6 406.06 407 66 406.26 4 06.06
P RO PO 3E0 P RO PO 5 ED P RO PO S ED P ROPO 3 EO
IS
40
4I 6
4I 5
19
10- A 4 I 8
4 I6
20
10
10- A 4 I 6
4I6
21 It 22 11 23 12 24 12
10
42 3
4I6
10
42 3
4t6
It
424
423
tl
424
423
25 13 12 42 t 424
26 13
12 42 t 424
660
120
12 0
920 870 3 50 350
7 30
7 60
30 402 30 401.30 1 5 402.40 402 30 t a 402.40 402.30 24 406.49 402.40 0.00447 2 I 406.67 402.66 0.0042 3| 24 4 0 6.06 4 0 6.49 0.00447 2 I 407.64 406.47 0.00423
24 4 t 1.43 406.06 0.0044 71 21 4 I I. 23 407. 84 0.0042s|
6. 6 6.6
6. 6
5. I I. 6 1.5 I. 6
6. 0 6. 0
6.0
5.3 2.6 1. 9
2. 6
14.6 | 4. 6 14.8 14. 6
7. 6
0.013
0.013
0. 01 3
0 013
0.013
0.01 3
0.015 0. 0 I 3
0 013
I5 5.7
9.3
I3 I3
6.5
6 n-
10.6
4.4
I3
9
3.1 4. 7 3.4 2.6 2.7 3.3
1.6
1.2 1.6
0.13 0.34 0.43 O. 12
O II
O. 17 0.03
0.02 0.03
0.0014 0.0060
406.73 403 SO 407.69 406. 73
O 0060 407 69 406 73
00020 4 11.67 407. 69 0.002 3 411.67 407. 69 0.002 9 412.70 4 11.67 0.00 11 4 12.03 4 I I. 67
PART FULL
PART FULL
P RO PO 3ED PROPO 3 EO INVERTED SIPHON
300.000 OPD INDUSTRIUL WASTE (0.465 CPS J
IN A 6' PIPE TO LEWIN BIATHE3 24' 8EWER
m* w nni nrNMRA
WATER PCB-SD0000005250
LIST OF PLANS Existing Sewer System Plan "A* Plan "B11, "B-Al"' and nB-A2n Plan "B-la" Plan "C Plan "C-l" Ponding Plan
(33) WATER PCB-SD0000005251
BASIS OF COST ESTIMATES
The cost estimates used in this report are based on bids submitted for similar construction in the Village of Monsanto in 1953 - adjusted for the differential in labor and material costs to date.
Estimated construction costs include allowances for contractor's overhead and profit.
Total capital costs include allowances for construction contingen cies and engineering costs, and financing, legal and administrative costs.
Annual operating costs for the pumping stations include only general maintenance and power.
Debt- service has been calculated on the basis of h% - 20 year General Obligation Bonds in the amount of $ 1,650,000. This amount was established on the premise that $ 600,000 would be forthcoming as a federal grant, and that the proposed project would have a total estim ated capital cost of $ 2,250,000. Any variation from these amounts would reflect accordingly in the estimated annual cost. (See Flan MB-A2n)
We suggest that the following percentages be used to approximate the annual cost to each of the respective industries (these have been determined from the I960 valuation as set by the Department of Revenue total assessed valuation of $ 58,1*89,1*97) : -
l
(3U)
WATER PCB-SD0000005252
1. Monsanto Chemical Company
.2 Union Electric Company
-
3. Mobil Oil Company
-
U. Midwest Rubber Company
-
3. Lewin Mathes Company
.6 Darling Company
-
7. American Zinc Company 8* Sterling Steel Casting Company
-
9.' Moss Tie Company
.10 Home Owners and Miscellaneous Property owners
-
.
30.uo k3.$k 15.22.
1.80 1.70
6It i.5o
.25 .hi
k.$k
(3U.) WATER PCB-SD0000005253
Estimated Capital Costs
Plan "A"
Location-M.H* to M.H*.
Estimated Construction Cost
Interceptor and Conn* to U.S.C.E. Station
$51,600
2.-10 Inverted Siphon
$ll;6,700
$21;, 000
Reconnections along Rt. 3
$3,000
19-6
$171,000
6-7 7-9 (Revise K.Hs.)
$20,700 $3,000
Replace bad 15": with 18"
$17,000
19-21; Reconnect Plant Sewers
w/3 Siphons + 2 M.H.
$72,000
2i;-28c
$92,500
2U-28D
$22,000
Total Estimated Construction Cost Engineering and Contingencies Financing, Legal & Admin. Cost
$623,500 $121;, 500
$22,000
Total Estimated Capital Cost
$770,000
(35)
WATER PCB-SD0000005254
ESTIMATED CAPITAL COSTS PLAN "Bn
Location - M.H. to M.H.
Estimated Construction Cost
1-10
$1+27*000
10 - 13
66,000
Lift Station - 10
350,000
10 - 19
51+,ooo
10 - 19
2l+,500
19 - 21+ 21+ - 28C
367,000 92,500
2h - 28D 21+ - 2?
22,000
I+I+,000
28 - 21+
13,500
19-3-7-9
279,000
i|B - 1+
3,500
Total Estimated Construction Cost
$1,71+3,000
Engineering and Contingencies
31+9,000
Financing, Legal & Administrative Cost
63,000
Total Estimated Capital Cost
$2,155,000
ESTIMATED ANNUAL COST
Debt Service Operating Cost
-$ - $6,900
(36)
WATER PCB-SD0000005255
ESTIMATED CAPITAL COSTS PLAN "B-A1"! .
(Alternate No. l)
Location -M.H. to M.H.
Estimated Construction Cost
1-10
$1427,000
10 - 13
66,000
Lift Station - 10
350,000
10 - 19
5U,000
10 - 19
22., 000
19 - 21*
367,000
2I4 - 28C
92,500
2lj. - 28D
22,000
2I4 - 27
lil).,000
28 - 2h
13,500
27-9
88,000
19-3-6
Hi0,500
IjB - k
3,500
Total Estimated Construction Cost
$1,690,000
Engineering and Contingencies
338,000
Financing, Legal and Administrative Costs
61,000
Total Estimated Capital Cost
$2,089,000
ESTIMATED ANNUAL COST
Debt Service
- $117,000
Operating Cost - $ 8,600
(37)
WATER PCB-SD0000005256
ESTIMATED CAPITAL COSTS PLAN "B-&Zn
(Alternate No. 2)
Location - MH. to M.H.
Estimated Construction Cost
1-10
$1*27,000
10 - 13
66,000
Lift Station - 10
350,000
10 - 19
51*, 000
10 - 19
22,000
19 - 21*
367,000
2'1* - 28C
92,500
21* - 28D
22,000
2i* - 27
UU, 000
28 - 2k
13,500
27-9
217,500
19-3-6
li*0,500
kB - k
3,500
Total Estimated Construction Cost
$1,819,500
Engineering and Contingencies
361*,000
Financing, Legal andAdministrative Costs
65,500
Total Estimated Capital Cost
$2,21*9,000
ESTIMATED ANNUAL COST
Debt Service
-
Operating Cost - $8,600
(38)
WATER PCB-SD0000005257
ESTIMATED CAPITAL COSTS PUN nB--1AW
H 1
HO
Location - M*H. to M.H.
10 - 13 Lift Station - 10 10 - 19 10 - 19 19 - 21* 21* - 28C 2k - 28D 2k - 27 27-9 19-3-6
liB - h
28 - 2k Total Estimated Construction Cost Engineering & Contingencies Financing, Legal & Administrative
Total Estimated Capital Cost
Estimated Construction Cost $1*27*000 66,000 320,000 29,000 22,000 233,000 81,500 22,000 1*1*, 000 88,000
il*o,5oo
3,5oo 13,500 $1,1*90,000 298,000 53,5oo $1,81*1,500
ESTIMATED ANNUAL COST
Debt Service Operating Cost
-- -- $8,1*00
(39)
WATER PCB-SD0000005258
ESTIMATED CAPITAL COSTS HAN "C"
Location - M.H. to M.H.
Estimated Construction
1-2
$250,500
2-39
227,000
39-3 3-5 and 6-7
8A - 9 19-39-3-5-6
110,000 137,000
17,000 171,000
39 - 17M - 6M - 2M 6-7-9
Ub - h 10 - 13
'
372.*000 81^,000 3,500 66,000
0
CO CM
1
CM
99,500
10A - UO Inverted Siphon
79,500 26,000
Dead Creek Plumping Station and Force Main
Total Estimated Construction Cost
Engineering and Contingencies
2k,000
$1,667,000 333,000
Financing, Legal & Administrative Cost Total Estimated Capital Cost
60,000 $2,060,000
ESTIMATED AHNUAL COST
Debt Service
-
Operating Cost - $51j.O
(Uo)
WATER PCB-SD0000005259
ESTIMATED- CAPITAL COSTPLAN C-1*
Location - M.H. to M.H.
Estimated Construction Cost
1-2
$230,300
2-39
i3i,ooo
8A. - 9 19-39-3-5-6
17,000 118,300
39 - 17M - && - 2M
372,000
6-7-9 Ub - k
81*, 000 3,500
10 - 13
66,000
2k - 28C 10A - 1*0
92,300 61,000
Inverted Siphon
21*,000
Dead Creek Pumping Station and
Force Main
_
2i*,00Q
Total Estimated Construction Cost
$1,261*, 000
Engineering & Contingencies
233,000
Financing, Legal & Administrative Cost
1*3,000
Total Estimated Capital Cost
$1,362,000
ESTIMATED ANNUAL COST
Debt Service
-
Operating Cost - $3ii-0
(la)
WATER PCB-SD0000005260
ACKNOWLEDGEMENTS This report involved the help and cooperation of the Village of Monsanto industries and their representatives. We wish to thank' them collectively for their consideration in supplying information related to their individual companies. We wish to extend special thanks to Mr. C. N. Stutz and Mr. R. H. Young of Monsanto Chemical Company for their helpful suggestions. We are- indebted to the firm of Metcalf & Eddy, Engineers, for their review and advice in the preparation of this report. Finally, we wish to express our appreciation to Mayor Leo Sauget and the officials of the Village of Monsanto for their cooperation.
Eespectfully submitted.
Illinois Registration - 238?
Yusef Hakimian Illinois Registration - 22l|l6
m
WATER PCB-SD0000005261