Document a1Qg08zggY1VaDpab21QDg4EB

BID NO *0-7* purchasing oma prince george's count public schools am NUMDRO. MARYLAND MATO date or zsrai Mb. is, 7* INVITATION TOR BIO TOR TREATMENT OF ASBESTOS SURFACES AT VARIOUS SCHOOLS IN PRINCE GEORGE'S COUNT! DEADLINE FOR RETURN OF BIDSi MARCH 7, 1979 - 1.00 P.M,, E.S.T. BID OPENING WILL BE 00NDUC3E0 AT TGE HALL BUILDING UPPER MARLBORO, MARYLAND Contentsi OMIRAL PBDVIAIOWi (POCAE kMB lev, 9/14/TA) hM 1 through 7 of this invitation for bid plus certification of independent pries determination i APECXAL NOTV Name of firm aubmittin? bid SUBMIT IN DUPLICATE BID BOND REQUIRED PEBfORMMOl BOND REQUIRED POCBE 2Bs68 Revised 9/19/78 PURCHASING OFFICE PRINCE GEORGE'S COUNTY PUBLIC SCHOOLS UPPER MARLBORO, MARYLAND 2G870 IFB NOI 80-79 BRG 0474 CHANGES (Continued) B. Any change permitted or extension of contract completion data will b only aa authorized by the CONTRACTING OFFICER in the form of a contract amendment. SPECIFICATIONS XXII SCOPE A. Provide all materials, equipment, and labor required to treat asbestos ceiling surfaces and asbestos covered structural steel surfaces in the boiler rooms at various schools. XXIII DESCRIPTION OF WORK REQUIRED A. All asbestos ceiling surfaces and asbestos covered structural steel surfaces in the boiler rooms are to be treated with a sprayed on coating to prevent possible asbestos fall out by encapsulating the original material. B. Material to be used shall be: Hydro-Ban SOOE Polygard Asbestos Treatment manufactured by KRC Research Corporation, Moorestown, New Jersey Similar materials of other manufacturers may be used subject to the approval of the DIRECTOR OF PLANT MAINTENANCE. All materials are to be applied according to the manufacturer*e recommendations. The manufacturer's field engineer shall monitor the entire treatment. C. Area Preparation: All mechanical equipment, fans, piping, boilers, valves, etc., ere to be protected from possible asbestos fallout during application by ealing with plastic covers, tape, tech. All doorways leading to interior spaces shall be kept closed and sealed. D. Application: The material to be used shall be applied in accordance with all LOCAL, STATE ANE FEDERAL REGULATIONS concerning the protection of worker in an asbestos environment. E. Clean-Up: 1. Upon completion of the spraying, all wall and floor surfaces must be vacuumed to remove any possible asbestos residue. It ie recommended that an ultra-high vacuum cleaner with an appropriate filter be utilized to insure that any asbestos fibers are not dispersed IFB NO: 80-79 PAGE MO. 6 BRG 0475