Document a1MYa72QOD4YVqjyozGJm95k9

6. CONCLUSIONS: - Relative to dust exposures from Graph, if1 6 Tables on Pages 8 6 9: 1. "Thermobestos" insulation blocks should not be fabricated when using only the original downdraft exhaust ventilation. 2. "Kaylo" insulation blocks could be fabricated safely when using only the original downdraft exhaust ventilation if existing leaks, observed on the #1 band saw, are corrected. 3. "Kaylo" insulation blocks definitely may be safely fabricated when using the entire exhaust ventilation facilities now available, i.e., hoods above the blocks as well as below. From Graph #2 Tables on Pages 8 6 9: 1. Methods of handling "Thermobestos" blocks (preparatory to sawing) and scraps (after sawing) contribute greatly to specific individual exposures as demonstrated by the following facts: . a. The fabrication process, which always begins at the if2 band saw with ' the simple cutting of each 18" x 36" x 4" block into three smaller blocks about 18" x 12" x 4", is normally the least dusty of all the fabrication operations as revealed by the samples taken on 24 Jan 1963. b. However, on 6 Mar 1963, this operation was revealed as being one of the dustiest, regardless of the ventilation being used. c. There was only one major variable between the samples taken on the two dates, i.e., the method of handling the blocks preparatory to sawing. Consideration of the procedure used on these dates reveals: (1) that on 24 Jan 1963, the blocks were rolled up to the saw after having been removed from their shipping cartons and stacked on a "dolly" for easy individual removal and (2) cn 5 .Mar 1953, the blocks were not removed from their shipping cartons until needed by the worker. A large amount of dust is produced when blocks are removed individually from the cartons as a result of the natural abrasion produced when one block is pulled over the surface of the other. Consequently, the dust concentrations cn this date at this location were greater than normal. 2. The supplementary overhead ventilation (added since the time of the preceding two reports) does successfully reduce the dust exposures. * However, it does not reduce "Thermobestos" dust exposures to within safe acceptable limits when cutting radii. From Graph #3 6 Table on Page 9: 1. "Carey-Tamp" dust concentrations for each exposure was substantially greater than the comparable "Thermobestos" dust concentrations and in excess of even the most lenient TLV established for human exposures, i.e., 50 mppcf of air. ' * UCC 017859 AU247C 7. 2. The existing exhaust ventilation system as installed on both band saws . is incapable of reducing the dust hazard, associated with the fabrication " of "Carey-Temp", to within safe acceptable limits, i.e., 20 mppcf of air. Relative to the exhaust ventilation system: 1. 'Hie duct velocity in the downdraft ventilation system on both band saws is far below the reconroended value of 4000 fpm. ` 2. The duct velocity in the overhead ventilation system on both band saws is equal to or more than the reconsnended value of 4000 fpm. 3. The velocity in the downdraft ventilation systems for both band saws could be increased by patching all holes, leaks, etc., now in existence. RECOMMENDATIONS: 1. Do not fabricate 18" x 36" x 4" "Carey-Temp" or "Thermobestos" insulation materials unless: , a. The atmospheric dust problem can be reduced to below 20 mppcf of air through the use of improved ventilation techniques or repairs to the existing system, or b. The manufacturers of the two makes of insulation materials are able to produce a product which will not release, upon fabrication with a band saw, dust concentrations in excess of 20 mppcf of air. C REP: hi 23 October 1963 UCC 017860 A0247 1 e . INDUSTRIAL HYGIENE SURVEY Evaluation of Atmospheric Dust Conditions at th Construction Insulation Shop Table #1. . Atmospheric Dust Concentration Data Collected When Using Only Partial Ventilation,,i.e., Only Below the Blocks Date 25 Feb 63 24 Jan 63 6 Mar 63 25 Feb 63 24 Jan 63 6 Mar 63 Cutting & Edging Insulation Blocks Type of Material Kaylo Thermobestos it Kaylo Thermobestos it Description of Location #1, i.e., South Side of the #2 Band Saw ^2. ii ii it it it ii it ii ^ it ii i ii ii ii it it #2, i.e., South Side of the ?1 Band Saw 02 H it ii >i H ii 02 u * ii *i it i * Concentration in mppcf 9.32 10.00 51.50 17.92 26.36 42.70 c Cutting a Radius on Insulation Blocks Date Mar 62 25 Feb 63 . Mar 62 24 Jan 63 6 Mar 63 Mar 62 25 Feb 63 Mar 62 24 Jan 63 ' 6 Mar 63 Type of Material Description of Lo zat: cn Kaylo ti Thermobestos it it Kaylo ii Thermobestos ii it . #3, #3, i.e., n Soiut th Sidite of II the tl *2 M Band tl Saw If #3, ii ii it H it it H It #3, ii n ii it ti it ti ti #3, it it it H ti ti VI If #4, #4, X6 f ii South Side H it of the II it ?1 it Band it Saw it #4, it #4, ii #4, ii ii it II ti ii H it H it II it it If If ii it II it ii it ti Concentration in mppcf 17.10 3.39 101.40 69.59 36.82 3.06 ' 29.35 83.30 66.69 70.00 ' UCC 017861 A02472 Date 6 to`63 26 Feb 63 6 to 63 26 Feb 63 Table 02 Atmospheric Dust Concentration Data Collected When Using All Available Ventilation, i.e., Both Above 6 Below the Blocks Cutting 5. Edging Insulation Blocks 9. Type of Material Thermobestos Carey-Temp Thermobestos Carey-Temp Description of Location i 01a, i.e.. South Side of the 02 Band Saw * . ' n M i ii 02a, i.e., South Side of the 01 Band Saw " ' * M M * 'i Concentration in mppcf 30.20 51.70 17.59 58.20 Cutting a Radius on Insulation Blocks Date ' Type of Material 6 to 63 6 to 63 26 Feb 63 26 Feb 63 Thermobestos Thermobestos Carey-Temp Carey-Temp Description of Location 03a, i.e., South Side of the 02 Band Saw 04a, i.e., South Sice of the 01 Band Saw 11 II H II II II II II 05a, i.e., North Side of the 01 Band Saw Concentration in mppcf 22.42 51.70 85.40 100.90 Index for Graphs #1, 02 03 01 = South Side 02 Band Saw - Cutting 31ocks - Ventilation Only Below 02 = it " 01 ii ii - Edging "- ii ii ii 03 = it " 02 it ii - Cutting a Radius -- ii ii ii 04 z ii " 01 ti ti - it ii it -- ii it ii 01a = ii " 02 it ii - Cutting Blocks - " Both Above Eelow 02a = ti " 01 ti it - Edging "- ti ti it ii it 03a = ii " 02 ii it - Cutting a Radius _ ii it it ii it 04a s it " 01 it it - w ii it _ ii it ii ii i 05a = North Side 01 Band Saw - Cutting a Radius - Ventilation Both Above Below ( A02473 UCC 017862 Trial # 1 2 3 #. Table #3 Determination of Percentage Crystalline Free Silica Present in "Thermobestos", "Kaylo" 6 "Carey-Temp" as Quartz by the "Talvitie" Method 10 'Thermo be stos'' (As Contained in Report 62-IH-l-G-l) Wi in Grams W2 in Grams W3 in Grains % Free S1O2 0.5002 0.5000 0.5002 0.0390 0.0347 0.0396 0.0059 0.0068 0.0082 Average Percentage Crystalline Free Sj.02 = 6.4 6.42 5.58 6.28 "Kaylo" (As Contained in Report 62-IH-l-G-l) Trial # 1 2 3 in Grains W2 in Grams W3 in Grams % Free St_02 0.5000 0.5000 0.5000 0.0807 0.0730 0.0553 0.0433 w wW w 0.0133 7.48 7.32 ' 7.46 Average Percentage Crystalline Free SvC'2 = 7.4 . "Carey-Tam?" (As Reported by Mr. Thomas M. Durkan) 4 October 1363 Components Soluble in Hcl Other Components Soluble in Phosphoric Acid Percentage Crystalline Free S^02 as Quartz 10.3'$ w 3 '4 99.5% 00.4% UCC 017863 A02474 11 c . . Table 04 Ventilation Rates on Two Band Saws Date Hood Being Band Saw Checked Description of Condition Ventilation Rate in fpm ' 25 Feb 63 6 tor 63 25 Feb 63 6 Mar 63 25 Feb 63 6 Mar 63 25 Feb 63 ' Mar 63 25 Feb 63 6 Mar 63 02 02 n 02 n 02 02 02 02 02 Downdraft it u tt it Only Downdraft System in Operation it it ti it H Downdraft 6 Overhead System in Operation ii it it it it Every Hood in the System Open ti. --it -ii, i it ii Overhead ------ it--..-- -- ti it Downdraft Overhead System in Coeration ___ ii,. ii ii it it ii Every Hood in the System Open ii it ti ii it ti 1500 1450 1200 1200 950 900 650Q1 4800 4000 - 25 Feb 63 6 Mar 63 25 Feb 63 6 Mar 63 25 Feb 63 6 Mar 63 25 Feb 63 6 Mar 63 25 Feb 63 6 Mar 63 01 01 01 0i #i #i 01 #i 01 01 Downdraft it it it it tt Overhead ti ti tt i Only Downdraft System in Operation ii ii ii ti ti Downdraft 6 Overhead System in Operation it tt it nH ii Every Hood in the System Open it it it ii it it Downdraft 5 Overhead System in Operation it ii ii it ii ii Every Hood in the System Open ti it it it it ii 2100 1500 1600 1150 1100 ^c;n^n 4500 4200 UCC 017864 A U2 4 7b DUST EXPOSURES W HILE FA B R IC A TIN G KAYLO & THERMOBESTOS IN SU LATIO N BLOCKS W IT H ONLY DO W NDRAFT VENTILAT oc* JLJV JO jodclui UT nUOTlRJlUOOUCr) UCC 017865 > 1 nI I I I Au2476 #9 I u 4 Saw #1 Baud Saw #2 Band Saw #1 Band Saw GRAPH NO. 2 o z I/I 3 oz c< u < o 01 Zo < D < >uzci oUu X i/i I/I z Ui* * a.I/I >UJ I/I ooc D i/i o fiu X UJ E C9 vewt fz c ii -- C9 wr *2 29 9 -rW 9 'r i 19 9 i l 1 1 1 J9 -"M 9 #1 B*nd Saw #2 &*nd S* #2 Band Sw #1 ftu id Sw oo g C9 9 s *o 2t 2** N ^ rrv jo joddm trr uoiVMauaouoo A02477 UCC 017866 o : u o c zo- 5< <y zz at ~ 5CO Q. a r*> ui 111 *7 zo 1 < <E x o u UJ (Ut T6 2o * 2ofe R 2S -9 3S O ui Z c > 4 9 * vt 1 I I wITV JO jocidui UT uot^pjausouoo UCC 017867 AU2478