Document a143Bzg4Dr6j1rko18Nekx2kb
f l '
CHEMICAL COMPANY, INC.
CMCMCCL punt
JJF-005-83 --
Mr. Bill Stewart, P. E. Executive Director Texas Air Control Board 6330 Highway 290 East Austin, Texas 78723
*
January 12, 1983
CERTIFIED MAIL NO. 5561497
Dear Mr. Stewart:
g The Celanese Chemical Company, Inc., plant at Bishop, plans to I reclaim about 1 ,200 feet*,of steel pipe ranging in size from 1" to
18" in diameter. Also included in this reclamation work is a small vessel, approximately 6' long by 8* diameter. This reclama tion work will start January 31, 1983. The pipe and vessel are insulated with f'iable asbestos insulation, so insulation will be removed-as the first step, and landfill in the designated asbestos landfill located on the plant site. All precautions, outlined in / 40 CFR 61.20-61.25, will be observed.
r
This letter will serve as notification of this work, as required by 40 CFR 61.22 (d) (2). The attached data sheet lists all the pertinent data.
Please contact me if you have any questions or comments.
Very truly yours.
JJF/rgs Attachment bcc: J. Garza
J. F. Harper W. H. Meyer D. D. Siei-
Plant Manager Celanese Chemical Company
Juan Gonzalez, A.B.I. R. K. Golemon, Austin CCCTC Central Files (2)
BISHOP FILES: 202.1
CCUNCSC CHEMICAL COMPANY. INC. BOX 428. BISHOP. TX 78J43 TtUPHONC. 512-5*4-3511
009419