To(NiBiTiei Division Location
Tea
Mr. D. K. Garrett Building 264 Institute Plant
copyeo
Dr. B. H, Avasliia Mr. J. T. Young Mr. F. Williams
n.,,. July 30, 1982
.............. ..
^strial Hygiene
RECEIVED
AUG 0 5 1982
^
A* iv-
ovtitr-ct.
Monitoring for Personal Exposure to ASBESTOS During Pipeline Demolition
Arrangements were made to monitor for personal exposure to asbestos fibers during a major job of demolition of asbestos containing insulation from old piping. Personnel from the Central Insulating Group were involved in a typical demolition project in an area along E street between 3rd and 5th Avenues during the first week of July.
Eight personal samples were collected during this time period, together with an area sample at the MCB Unit. Kaylo asbestos insulation with double application and protective covering was being removed from a 4" pipeline. Proper plant guidline procedures were observed to be followed throughout the course of the job. Personnel involved wore adequate respiratory protection while the old insulation material was wetted with a fire hose, dropped to a plastic lined truck bed and covered for transport to the landfill.
Samples were collected for 15 minute time periods on filter cassettes while employees were actively engaged in specific job tasks. Fiber counting by phase contrast microscopy was performed by the R & D Industrial Hygiene Group. Results were as follows:
Date
Name
6/28/82 M. R. Fisher T. B. Kugel
7/1/82
J. I.. Valen M. R. Fisher
T. C, White M. E. Johnson
7/2/82
T. C. White J. L. Vaten Area
Air Cone., Fibers/cc
1.4 <0.1
<0.1 0.2 0.9
<0.1
0.3 1.7 <0.1
Job Task
Stripping & Bagging Transfer filled bags to truck
Stripped protective covering Removing vetted insulation Stripped protective covering Ricked up scrap & bagged
Stripped protective covering Stripped and removed wetted insulation Pipeline valve replacement where demolition was completed
UCASB01639882 WV-17936