Document ZymODmRrejr1Y9E73axQmQJJ

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 5 77 WEST JACKSON BOULEVARD CHICAGO, ILLINOIS 60604 SUBJECT: FROM: THRU: TO: CLEAN AIR ACT INSPECTION REPORT Eagle Metal Finishing LLC, Milwaukee, WI Brittany Cobb, Environmental Engineer AECAB (MI/WI) Sarah Marshall, Section Supervisor AECAB (MI/WI) File BASIC INFORMATION Facility Name: Eagle Metal Finishing, LLC Facility Location: 919 W Pierce St, Milwaukee, WI 53204 Date of Inspection: 3/15/2022 EPA Inspector(s): 1. Brittany Cobb, Environmental Engineer 2. Emma Leeds, Environmental Engineer 3. Laura Steel, Environmental Engineer Other Attendees: 1. Lee Williams, President 2. Danielle Williams, Director of Operations Contact Email Address: lee@eaglefinishing.com Purpose of Inspection: Determine compliance with the Clean Air Act and 40 CFR Part 63 Subpart WWWWWW applicability Facility Type: Metal finishing Arrival Time: 1:45 PM CT Departure Time: 3:00 PM CT Page 1 of 3 Inspection Type: Unannounced Inspection Announced Inspection OPENING CONFERENCE Presented Credentials Stated authority and purpose of inspection Provided Small Business Resource Information Sheet via email Small Business Resource Information Sheet not provided. Provided CBI warning to facility The following information was obtained verbally from Lee and Danielle Williams unless otherwise noted. Process Description: Eagle Metal Finishing LLC (Eagle Metal Finishing) polishes and buffs steel, stainless steel, aluminum, and zinc dicast. There are 8 buffers and 15 polishers. The buffers use cotton wheels and animal grease compounds as a lubricant. The buffers are controlled by 2 dust collectors. The polishers use aluminum oxide pads, and the grit ranges from 180 to 600. There are approximately 5 dust collectors that control emissions from the polishers. The facility changes the bags once every 2 to 4 weeks and inspects the ducting system approximately once every 2 months. Staff Interview: Eagle Metal Finishing operates 5:00 AM to 2:00 PM, Monday through Friday, and there are 38 employees. The facility does not perform electroplating and does not polish any plated parts. Eagle Metal Finishing also do not record maintenance/bag replacements. The facility also does not have an air permit through WDNR. TOUR INFORMATION EPA Tour of the Facility: Yes Data Collected and Observations: The polishers, buffers, and dust collectors were not operating during the tour. EPA noticed that the dust collectors for the polishers exhaust outdoors. Photos and/or Videos: were not taken during the inspection. Field Measurements: were not taken during this inspection. Page 2 of 3 CLOSING CONFERENCE Provided U.S. EPA point of contact to the facility Compliance Assistance: EPA suggested Eagle Metal Finishing record maintenance/bag replacements for the dust collectors. DIGITAL SIGNATURES Digitally signed by Brittany Cobb Date: 2022.05.12 Brittany Cobb Report Author: _________________1_1:_29_:5_1 _-05_'0_0'_________ Section Supervisor: SARAH Digitally signed by SARAH MARSHALL _____M__A_R__S_H_A__L_L___11_:4_3:0_1_-0_5'_00_' _________ Date: 2022.05.12 Page 3 of 3