Fr> >N*M# Ft lOC*l ,, E. E. Stewart - W. Q. Krummrich Plant
Mfl TO :
February 21, 1971* PROPOSED POLYCHLORINATED BIPHENYL STANDARD
P. E. Helsler
G. L. Bratscn A. E. Lelsy G. A. Hlppe W. C. Engman D. B. Hosmer - G.O. P. B. Hodges - G.O.
W. B. Papageorge - G.O.
Attached are the copies of the report covering the progress at W. G. Krummrich Plant In reducing PCB in the effluent lr. recent years. Also included are a status report of activities, presently being carried out and the plan to further reduce PC3's In the future.
Please forward copies to Paul Hodges and appropriate
people at General Offices for their preparation cf the
presentation for the Federal EPA.
_
<2
/ghw
E. E. Stewart
,
HONS 042701
I. PCB Loss Control Data
Page 1 WGK 2/21/7 "I
The following loss control data graphs reflect the trends In the PCB content In various major monitored streams within the
W. G. Krummrich Plant and at the Sauget Waste Treatment Plant.
Figure I - Depicts measured PCB losses at
A. Total Plant Losses were measured at the 24" and 30" sewers from the W. G. Krummrich Plant. 99* of the total WGK effluent flows from the plant at these two sewers.
Routine monitoring was discontinued In early 1971 when It became evident that more reliable and meaningful data could be obtained at other monitoring locations.
B. Manufacturing departments loss data represent continu ous stream analysis data from the Aroclor manufacturing department (Dept. 246) and from the Incinerator area (Dept. 831).
Information prior to June 1972 Is not Included because prior data related to a different monitoring system.
Figure II - Depicts measured PCB losses In the Influent and effluent at the Sauget Waste Treatment Plant.
Data points prior to July 1970 may represent from one to several samples taken during the respective month. All data after July 1970 are average monthly values taken from seml-contlnuous samplers.
The following Table I reflects average yearly data from the various monitoring locations.
Table I
Monitoring Location
1969
1210
12H
1972
1973
(All data In lbs/day)
Manufacturing Departments
No data
--
--
2 1-1/2
WOK Plant
No data
--
6~--
Sauget WTP Influent
1100-
217
<13
19
10
600
Sauget WTP Effluent
300 78 19 7 5
HONS 042 702
FIGURE I
Page 2 WOK
2/21/7^
II. WGK - Monsanto Village Sewer System
Page 3
WOK 2/21/74
The following sketch is a very simplified drawing of the sewer system where PCB contamination Is possible at present. Also noted on the sketch are points where previous contamination
could have occurred prior to advent of the current containment control program.
A. On the attached graph PCB's are present as PCB's and can
enter effluent streams from the following areas. Loss flows
are represented by a solid line.
1. Department 2^6
2. Incinerator
3. Repair Track
4. #11 Substation
5- #17 Substation
.
6. Laboratory
B. The failure of control devices could result in possible PCB
contamination from the Dept. 246 off-gas at Depts. 236 or
Dept. 217. Possible loss flows are represented by a dotted
line.
.
C. Past actual loss points within the plant boundary are spotted
by arrows on the sketch. These points represent some dozen sites where PCB's were at one time used as either a heat transfer media or a hydraulic fluid. Other miscellaneous previous contamination point sources are also identified.
Although PCB's have been removed by either substitution or by elimination of the practice at the various points, previou
losses prior to the current containment-control program will have and may be contributing to our present "background" pick up.
D. Past actual point sources from outside the plant boundary are also spotted by arrows on the sketch. These represent flows from surrounding industries and the Village of Sauget. It is estimated the drainage area covers about 1000 acres
outside the WGK boundary, (about 90 acres within plant)
Attached reference drawings are engineering drawings of the total sewer system.
Sheet D-465-G11
"WGK 1961 Block Plan & Monsanto Village Sewers".
TS-D-IO58O
"Plant Sewer Map"
MQNS 042704
iI -- <r cO t f fI
, -----------
Pape 4 - 2/21/71;
III. Manufacture of More Biodegradable PCB's
Page 5 WGK
2/21/7')
In 1971, we Installed a new distillation column In our manu facturing department at a cost of $970,000. This allows us to separate the higher chlorinated, less biodegradable compounds from the lower chlorinated, more biodegradable ones.
Our PCB's are known by the trade name Aroclor. We manufacture different grades of Aroclor (1016, 1292, 1251), for example).
The lower the grade number, the less chlorinated and more blodegradable is the product.
The current production of the lower grade Aroclor (1016) totaled more than 50$ of our PCB production In 1973. Production of the higher chlorinated products (Aroclor 121(8 and above) has decreased more than 50$ since 1969.
The chart on the next page Illustrates how our production mix has changed during the past five years.
MOMS qj,270(>
AROCLOR PRODUCTION
Page 6 2/21/7H
AT THE Wm. G. KRUMMRICH PLANT
KEY Aroclor
1016 1242
2226o?oso2S56oS5oo
t
More biodegradable
1248
1254 1260 1262
m
Less biodegradable
\
H POUNDS
HUNS 042707
IV. Contain -- Control - Monitor PCB's
Page 7 WGK
2/21/74
Efforts to contain, control and monitor PCB's started in 1969 and continue at present via a dynamic action control program.
Numerous programs were established and Implemented, projects
were completed, extensive educational/housekeeping programs were developed and Initiated and sophisticated analytical sampling techniques were developed to CONTAIN - CONTROL and MONITOR PCB's within the W. Q. Krummrlch Plant.
A chronological listing of activities can best depict plant efforts in this area.
CONTAIN:
iiii
First action taken to contain PCB's within the department was to Install weirs in the departmental trench sewers to retain liquid PCB's within the manufacturing department.
CONTROL:
Plant edict-established to discontinue sewering used PCB's within the plant. Aimed primarily at Thermlnol change-outs in heat transfer units within plant.
MONITOR:
An electron capture gas chromatographic method was developed by Research to detect PCB's in departmental and plant effluent streams. All analyses done at Research facilities outside plant.
CONTAIN:
1970
2000 gallon settling basin installed in manufacturing department to collect and contain PCB's in the event of an accidental spill or equipment failure. Also serves as collection point from major departmental ewer trenches. The heavier and virtually insoluble PCB's will settle to the bottom of the basin.
CONTROL: Demister and catch tank installed In aeration step in process prior to discharging to sewer.
Miscellaneous piping alteration made to effect reduced losses and containment within curbed and sumped area.
Began removal of contaminated chat In operating and
loading areas.
-
Began storage of used and returned PCB's for eventual reworking or destruction by incineration.
Began change-out of Thermlnol heat transfer units in the plant.
MONITOR:
Purchased and installed laboratory equipment to perform analyses In plant. Began routine plant analyses late in 1970.
MONS 042708
1971
Page 8
WGK 2/21/79
CONTAIN: Completed paving, cubing and Installation of trenches In tank storage to contain accidental spills.
CONTROL:
Completed the conversion of 16 Thermlnol heat transfer systems and 3 Pydraul hydraulic systems to non-PCB type fluids.
Discontinued transfer of department off-gas to Muriatic Acid operations where the carbon used to remove organics from the acid was discharged to the sewer after absorp tion of organics.
Installed facilities and started the manufacture of Aroclor 1016, a lower chlorinated more biodegradable Aroclor.
Equipment was Installed to permit the Incineration of
liquid waste Aroclors. Complete Incineration of the liquid waste is affected by incineration at 2000P. Facilities are available for handling waste Aroclors
from tank cars, tank trucks and drums.
Effluent streams from the disposal facilities are closely monitored to assure that knowing losses are controlled.
An Installation permit has been received from the
Illinois EPA for the Aroclor Incinerator. The unit meets all requirements specified by the EPA, and the operations are monitored on a routine basis and reports sent to the EPA.
The Incinerator area Is paved, curbed and sloped such that all drainage within the area is directed to trenches and piping that flows to a 10,000 gallon settling basin. Recovered PCB's that are collected in the basin are periodically pumped to storage and subsequently inciner
ated.
In conjunction with the Incinerator, a program was Implemented with the Evans Steel Barrel Company to properly cleanse and dispose of used drums that had
once contained Aroclor. The Initial procedure was
to wash the Incoming drums with kerosene to remove Aroclors, prior to additional washing and cleansing activities and resultant reconditioning. The spent kerosene and Aroclors were returned to WOK for in cineration. This procedure was subsequently altered
such that all drumB pass through an Incinerator to remove Aroclor prior to reconditioning.
O^T- IQ**
CONTROL: (cont'd)
1971 (oont'd)
Page 9 WQK
2/21/7H
Discontinued washing tank trailers outside plant con fines where resultant trailer washes containing PCB's could get Into outside effluent streams. Required
that all trailers be washed at Repair Track under controlled conditions. Tank trailer washes along with tank car washes were stored in tank cars for subsequent proper water decantation and Incineration of the waste PCB's.
MONITOR: Started intensive study to perfect the best sampling technique to monitor effluent streams for PCB's.
Operated continuous sewer samplers In Erriuent streams
from the plant and in the influent and effluent streams at the Sauget Waste Treatment Plant.
A plant Task Force was established to Implement an errectlve loss control program to get PCB losses to below 1 pound per day from the manufacturing-incinera tion and repair track areas. Engineers from the
Technical Services Department, the Maintenance Department and the Production Department made up the Task Force.
1972
CONTAIN:
Completed Installation of a second 3000 gallon settling basin and enlargement of an existing basin in the manu facturing department to insure PCB contaiment In case of accidental spill or equipment failure. All recovered PCB'b are pumped into drums -and subsequently Incinerated
Replaced major underground sewers with above-ground sewers and made major sewer repairs and replacements to eliminate build-up and cross flows of underground PCB contaminated waters.
Tank car wash facilities were Installed at the Repair Track Area to permit settling of liquid Aroclors from the wash water before discharging the wash water to the sewer. This permitted discontinuing the previous practice of collecting, storing and recovery of material
from the washing facilities. Reduced loss potential resulted from the loss handling required.
CONTROL:
Production operations between the chlorosulfonlc oper ations and the Aroclor operations were coordinated to minimize sewering HC1 off-gas containing PCB's.
Provided nitrogen blanketing on storage tanks to elimi nate any "breathing" of the tanks and resultant PCB escape.
HONS
1972 (eont'd)
Page 10
CONTROL: (eont'd)
A process amendment was demonstrated to permit dis continuing the aeration step In the process by sub stituting more lime for neutralizing acidic process streams. This will permit reduction of a water scrubbed gas stream containing PCB and discharged to the sewer. Equipment has been purchased and the pro ject Is currently being Installed in February, 1974 to permit Implementation of the process amendment.
Facilities were Installed within the manufacturing area for repairing contamination equipment. All equipment can be cleaned within padded and sumped areas where PCB's can be controlled within departmental limits.
An HC1 off-gas scrubber design was completed to permit a major reduction In PCB's In the scrubbed gas. Departmental facilities were later installed and will be started in the first quarter of 1979.
MONITOR:
A specially designed isokinetic continuous sewer sampler was Installed In the manufacturing department for
accurate monitoring of the effluent stream.
All process waters from the department plus the over flow from the settling basins enter the plant sewer system at one point. The entire stream (200 to 300 GPM)
passes through a Parshall flume where the quantity is totalized by related Installed Instrumentation. Continu
ous flow recording Is provided. A continuous sample of the department effluent Is taken at the Parshall flume. The effluent sample is analyzed twice a week and PCB
losses are calculated from the flow measurements and laboratory analyses. The loss data trends are reviewed
by the Technical Services Department, the Environmental Control Croup and department supervision to determine
what corrective actions need be taken. If any, to restrict knowing losses to the lowest achievable level.
Within the Incinerator area all process waters from the area plus the overflow from the settling basin enter the plant sewer system. A continuous sample Is taken from the effluent stream from the incinerator area. The effluent sample Is analyzed twice a week and PCB knowing losses are calculated from an estimated flow rate and laboratory analysis. The loss data is reviewed
to determine what corrective action need be taken, if any to restrict knowing losses to-the lowest achievable level
MGNS 042711
CONTROL:
1973
Page 12
WOK 2/21/7
Extensive education and housekeeping effort Is a "way-of-llfe" In the operating area. We have conducted an extensive education program with our operating personnel to emphasize - and re-emphaslze the need for control and containment of PCB's within the department.
Much of the success of our efforts depends on main taining a high housekeeping level In the department. Below Is a listing of the kinds of housekeeping
responsibilities our operators have assumed:
All pumps are cheeked for leakage on every
shift. Drip pans that collect leaks are emptied Into scrap Aroclor drums.
All leaks are reported and documented so that
corrections can be made and settling basins observed.
"Floor Dry" is used to absorb any liquid Aroclor that has spilled or leaked. If It becomes necessary to flush PCB's to the settling basin, a minimum amount of water Is used.
Sampling drums and scrap-Aroclor drums are
quickly palletized, labeled, and transferred to the incineration area.
A project was Installed to permit control of the HC1 off-gas system such that any gas that may contain PCB's are not inadvertently sewered at Dept. 236.
Major effort was directed to reduce the drum storage containing returned Aroclors for disposal by Incinera tion.
Off-gas scrubber Installation In progress.
MONITOR:
Intermittent sampling of various plant streams were conducted at various times to Identify other potential loss areas outside the manufacturing-incinerator areas Also, Intermittent sampling conducted to better define "background" losses.
"Background" losses are those losses that had occurred in the past and have since permeated Into the ground and are currently being leeched Into the plant sewer system and are measured along with current losses at the S&uget Waste Treatment Influent stream.
MOMS 042712
V. Development and Implementation of Automatic Stream Sampling Stations
Page 12
WGK 2/21/74
During the past three yearB the sampling technique to monitor effluent streams for PCB's has been under constant study and change. Monitoring effluent streams is not an easy effort. PCB'b have the tendency to absorb on any solid present and the
solubility of PCB In water is In the parts per billion range.
It is extremely difficult to obtain a continuous representative sample unless special facilities are Installed.
Efforts in the past have been related to:
A. Obtaining data profiles along lengths of sewer mains.
B. Obtaining data traverses at cross sectional areas in sewer lines and sewer boxes.
C. Effect of sampler speeds on data.
D. Isokinetic velocity studies in sampler lines and
stream flows.
'
E. Sewer sampling facilities and flow instrumentation provided.
We have learned that
A. Piltration of the sample will remove 70-90H of the PCB's present.
B. Sample data profiles along lengths of sewer mains can vary as much as 5:1 - 20:1 because of incomplete mixing in the line and the failure to get a representative sample.
C. Sample data traverses at cross sectional areas can vary as much as 2:1 - 400:1 for the same reason as listed above.
D. Of the four types of samplers we have studied, results can vary as follows:
1. Flow speed samplers 2. Fast speed Bampler
3* Isokinetic samplers 4. Orab sampler
Low results High results In between
Through exhaustive study, we feel we have Installed the best sampling facilities and flow instrumentation, so we can continu ously and accurately sample the effluent stream from the manu facturing area and determine any PCB content in it.
HONS 042 713
Page 13
wax
2/21/74
VI. Loading and Shipping Safeguards
A. In the Plant
During loading operations, we follow very specific
operating procedures, based on very specific written Instructions, to prevent accidental spills. The same Is true for filling drums.
All loading and drum-filling operations take place In
areas where drains and sewer systems are connected to
settling basins.
.
B. Aroclor In Transit
.
For additional Insurance, we have substituted a safer
%drum for shipping Aroclors. The metal thickness was
Increased by 26 (18-gauge drum to 16-gauge drum), and double chimes were added to give strength to the
heads.
In addition, we have added specific Instructions to our Aroclor labels, as follows:
This product contains POLYCHLORINATED BIPHENYLS (PCB's) which some studies have shown may be persistent, an environmental contaminant and, possibly. Injurious to certain forms of bird,
aquatic and animal life. PREVENT ANY ENTRY INTO THE ENVIRONMENT THROUGH SPILLS, LEAKAGE, DISPOSAL, VAPOURISATION, RE-USE OP CONTAINERS OR OTHERWISE. SPILLS, LEAKAGES AND WASTE PRODUCT MUST BE COLLECTED.
Use of this product must be restricted to applications In which It cannot come Into contact with food, animal feedstuffs or pharmaceuticals. HARMFUL SUBSTANCE IP TAKEN INTERNALLY OR IP IN PROLONGED CONTACT WITH THE SKIN, CAUSES IRRITATION OP SKIN AND EYES. ' DURING SHIPMENT AVOID SPILLS AND LEAKAGE INTO INLAND
WATERWAYS AND THE SEA. Store away from food, animal feedstuffs and pharmaceuticals. Keep container tightly closed. Do not eat or smoke when using. Avoid breathing vapours, mist or fumes. Do not wear contaminated clothing. Wash product from skin with soap and water. Wash eyes by flushing with water.
MGNS 042 714
VI. Loading and Shipping Safeguards (cont'd) B. Aroclor in Transit (cont'd) Aroclor labels (cont'd)
Page 14 WQK
2/21/7 <1
WASTE DISPOSAL
With prior Monsanto notification used polychlorinated biphenyl fluids may be returned freight prepaid for proper incineration at 3* per pound.
Ship to: Supervisor Dept. 831 MONSANTO COMPANY SAUOET, ILLINOIS 62201
VII. Current Known and Unknown Losses
A. Department 246 (Aroclor Manufacturing)
1. Aeration step In process contributes on the average about 0.8#/day. This will vary considerably depending on ambient temperature and the type of Aroclor being produced. Calculated losses range from 0.5 - 1.5#/day.
2. Settling basin losses are normally under 0.1#/day. At 3 QPM and 540 ppb solubility the loss can be as low as 0.02#/day.
3. The HC1 off-gas from the Aroclor operations can contain from 15-30#/day PCB's. These losses are calculated losses and measured losses are somewhat less. When operating In conjunction with the chlorosulfonic acid department all PCB's are converted to a sulfonated compound In the chlorosulfonic acid scrubber. Consequently, the PCB's are changed to a different
- chemical compound which Is subsequently sewered.
Intermittent discharge of HC1 off-gas to the sewer at the Aroclor Department or inadvertently at Dept. 236 can result In losses to the sewer.
(Projects are being or have been Installed to sub stantially reduce the possibility of losses from this area).
MONS 042715
' . VII. Current Known and Unknown Losses (cont'd)
Page 15 WQK
2/21/71!
B. Incinerator
1. Scrubber water discharge from the combustion gas clean-up can result In the discharge of about 0.02 0.15#/day. Would normally expect about 10 ppb In 150 gpm water flow ( *0.02#/day).
2. Settling basin losses are essentially nil. Should be under 0.1#/day.
C. Repair Track - Whereas losses In the past could range from 0.02 - 1+ lb/day per tank car wash, we have since discon tinued washing tank cars and tank trucks at the repair track. Past losses from this area were significant In that we may have washed a dozen or more cars per month.
D. Background - Represents losses In the entire sewage system that by some way enter the effluent streams from the plant and are present In the Waste Treatment Plant Influent
and are above those we know are entering the system at known or suspected locations. Aroclors have been produced at the W. 0. Krummrleh Plant since the early 1930's and
losses that have saturated the plant areas contribute to
todays "background". It Is guesstimated these losses to be the equivalent of 5#/day. A gradual decrease with time Is expected.
VIII. Present Levels In our Environment
A. The EPA has obtained samples at the Sauget Waste Treatment Plant Influent and effluent streams. On all occasions the samples that are obtained are split and we receive a similar sample for our analysis.
Tabulated below are our analyses of these samples. We do not have any Information with regard to the EPA analysis of
similar samples.
1/25/72 2/1/72 9/20/72
Waste Treatment n If
nn n it
- i n it
Influent Effluent
Influent Effluent
Influent Effluent
471 ppb 122
Equivalent 60#/day
16
373 48 191 25
117 20 24 4
10/4/72
n
n
Effluent
34
6
HONS 042716
.VIII. Present Levels In our Environment (cont'd)
Page 16 WOK
a/zim
Unfortunately the early samples were atypical because normal results are much below these values. However, during the 2/1/72 period we were producinga short run
of a mono chlorinated product and during this time It had been necessary to sewer all the off-gas from the manufacturing department.
B. Well Water - Past results vary from <1 - 33 ppb.
C. Cooling Tower - None detected by our routine laboratory method that will detect down to 10 ppb.
D. City Water
- None detected by our routine laboratory method.
0.05 - 0.08 ppb by special analysis using a recently developed laboratory technique to measure low values.
E. Mississippi River -
At Chain of Rocks Above confluence of Illinois Missouri at St. Charles Illinois River At J.B. Bridge
0.22ppb 0.19 <0.05 <0.25 <0.07
Sample taken In 1972 at various times and sample sizes. Would need much more data to draw conclusions. However, some values are above one time goal of EPA Task Force of 0.01 ppb in water.
F. Fish Data (1972)
1. Two each of four species of fish were taken from the
Mississippi River about 15 miles south of the WOK plant. The PCB content in the edible portion ranged from 3 to 34 ppm.
2. Four fish of one species were taken from the Mississippi
- River about 100 miles north of the WOK plant. The PCB content in the edible portion ranged from 0.07 to 0.3 ppm.
Downstream fish are above the FDA guidelines of 5 ppm. How ever, the fish we obtained are not unlike fish taken throughout the United States with regard to PCB content.
The Interdepartmental Task Force on PCB's report "Polychlori
nated Biphenyls and the Environment" report fish data as follows:
1. Fish taken from 47 of 50 sampling stations in 1969 ranged from <0.1 to 15 ppm.
2. Of 40 fish analyzed from several rivers in 1970, the top 20 averaged 38 ppm with range of 10 to 213 ppm. Only 1 of the 40 was <1 ppm.
MONS 042717
VIII. Present Levels In our Environment (eont'd)
Page 17 WOK 2/21/74
F. Kish Data (1972) (eont'd)
3. Samples from 317 fish taken from 13 metropolitan areas (not St. Louis) taken from Nov., 1969 to June, 1971 were In the general range of 1 to 10 ppm. Varied from trace quantities to 35 ppm.
4. Catfish from commercial fish farms at 3 ppm.
IX. Future Activities
A. Ooals and timing can be expressed In the following table.
Sources
Present
Ooal I
Ooal 11
Department Losses Dept. 246 Incinerator
1.5#/clay . <l#/day
<l#/day
Other Plant Losses (
) 0#/day
0#/day
Background Losses
(
)(
)
2#/day
Total Losses to Sauget Waste Treatment Plant
101/day
()
3#/day
Total Losses to River
5#/day
( ) <l#/day
EDC
--
1/1/75
4th Qtr '75
(Dependent on
completion oi Chemical Treatment
Plant)
Actions required to attain goals as follows:
1. Ooal I (Department losses <l#/day)
CONTAIN:
Upgrade sump at Incinerator area to better recover PCB's that collect in the 10,000 gallon sump.
Expand existing drum pad and provide addltlonal curbs In Incinerator Area.
CONTROL:
Start and demonstrate off-gas scrubber in Aroclor Department.
Eliminate aeration step In the continuous process In Aroclor Dept. Project being Installed at present.
MONS 042718
Page 18 WOK 2/21/711
B. Actions required to attain goals as follows: (cont'd)
1. Ooal I (cont'd)
MONITOR:
Improve sampling pick-up and facilities at Incinerator area.
Monitor cooling water systems in Aroclor department to discover equipment failure with possible resultant discharge of
PCB to department effluent streams.
Develop statistical data analysis technique to better spot out-of-control condition in
Aroclor and Incinerator area.
2. Ooal II (Other Plant Losses - 0#/day)
CONTROL:
Institute a procedure.to control handling
of returned drums to eliminate losses within the plant.
Discontinue tank car and tank trailer washing operations at Repair Track area.
Continue present housekeeping practices In
department and throughout the plant with regard to containment of PCB's.
Determine effect of PCB's that are presently sulfonated in the chlorosulfonlc acid scrubber.
MONITOR:
Develop statistical data analysis technique to better detect loss trends and assist in defini tion of "background" losses.
Continue the HC1 off-gas header control to virtually eliminate possibility of Inadvertently sewering gas at Dept. 236.
3. Ooal III (Losses to River - <l#/day)
A. Background losses must be identified.
B. Laboratory experiments must be performed to predict the expected reduction in PCB's that will be possible in the soon-to-be installed Chemical Treatment Plant at the Sauget Waste Treatment Plant.
C. Develope and Implement required additional actions. 1. Clean sewers 2. Repair and replace portions of plant sewer system where necessary. 3. Remove contaminated chat and soil throughout the plant where necessary.