Document ZnxxkorVO0GOpGnv5Qrxq48dO
ABD00080031
I. VINYL TANKFARM A. Hookup Stations Location a. South b. South Middle c. North Middle d. North
Drawing (ABER-VTF-H) (ABER-VTF-G) (ABER-VTF-G) (ABER-VTF-F)
Compressor Shed Location
a. Piping b. #5 Compressor c. 04 Compressor d. 03 Compressor e. 02 Compressor f. 01 Compressor
_
Drawing ('Aee* yrp ^ (ABER-VTF-I) (ABER-VTF-I1) (ABER-VTF-J) (ABER-VTF-K) (ABER-VTF-L)
g- S.ERS Collection
Pot/Plping
(ABER-VTF-A)
h. ERS Collection Pot/Piping
(ABER-VTF-B)
i. Piping Between Compressor Shed & Bullets (ABER-VTF-2)
Tag No.(s)
58 V0
59 61 62 U-64
60 63 65 ^
66 67 U-68 1-- 69 70 C-
71 ^ 72 u73 1--' 74 75
Tag No.(s)
1 t--- 3 2 u- 4 16 17 ^
14 15 ^
12 13 ^
10 v-* 11 ^
5 L**" 8 6 l*-" 9 ^
23 25 24
22_
18 S 21 ^
19 26 20 27 ^
NoTf/. C?a>
--$?* fiLL PorH
ABD00080032
I. VINYL TANKFARM (continued)
C. Piping to Sphere
Location
Drawing
a. Between
Compressor Shed
& Sphere to Road (ABER-VTF-4)
Piping on the
Bottom of the
Sphere
(ABER-VTF-5)
Piping on top of the Sphere
(ABER-VTF-E)
D Transfer Pumps
Location
Drawing
a. Sphere VCM transfer pumps
(ABER-VTF-6)
Tag No.(s) 28 29
30 32 ^
31_ 39_^.
40 42 41 43
Tag No.(s) 33 36___^ 34 37 35 38 ^
ABD00080033
OLD MODULE
A. Reactors
Location
Drawing
Tag No.(s)
a. D-300 reactor head/piping (ABER-LRS-7) 270 v*5 279 271 280 277 *^281 278 ^ 282_____
D-300 Bottom
361 362
b. D-400 reactor/piping head (ABER-LRS-7) 294 v** 302
295 ^ 303
300 es 305 ts
301 306
D-400 Bottom
c. D-500 reactor head/piping (ABER-LRS-8) 307
312 ^
308 ^ 313
309 314
310 ^ 328
311 ^
D-500 Bottom
359 ^ 360 ^
d. D-600 reactor/head piping (ABER-LRS-8) 315 ^ 321 v^* 316 o' 322
317 o- 323 is
318 ^ 324
319 ^ 325 320 ^
D-600 Bottom
357 358 ^
e. D-700 reactor/head piping (ABER-LRS-24) 329 330
331 ^ 332
D-700 Condensor
333
D-700 Bottom Piping
354 ^ 356 ^ 355 ^
f. VCM charge line between D-300 A D-400
(ABER-LRS-7A) 288
289 ^
g. VCM charge line to D-400
(ABER-LRS-8) 284
ABD00080034
U. CO) MXIUUg (continued)
B. VO! Piping Fran Tank Rum to Old and New Module Receivers
Lorarinn
Drawing
Tag No.(s)
a. TO1 charge line
(ABER-lFtS-17)
44372 ^
b. Pipe rack between D^00/D-500
(including rack to the new module)
(AEER-iRS-17)
290^293J^98J^66369372_^ 291^96299^367^370_373_^
292^97^365 *3&*371js
C. VCM Receivers
Iocaftm
Drawing
Tag No. (a)
a. S RWM/piping/piiipe (ABER-lIS-3)
87_j^91__c95J
88 92 yf 96 89 93 ^ 97 ^ 9094 ^ 98 ^
b. N KVCM/piping
(ABBHHS-2)
76 ^80 ^84 77^81^85^ 78 82 ^ 86 ^
79____83 "
c. FVtM/piping/pujps (ABER-LRS-4)
99^104^109^114J^* 100^105^110^115 101^106^111_^dl6 102_^07^112_^136j^ 103^108^113^
d. KTO Filter
(ABSHSS-5)
I28^l33l35^ 132^134^/
e. IVCM Filters
(ABHH*St5)
117^21_^125l30_^'
118_^122^126131jg n9^123j427j^ 12DjA2AjA29j*
f. Piping in front of receivers
(ABEWPS-6)
45^51_^57^267_^ 46^2^157^68^ 47_^53j^l58_^269^ 48^54_^263_^ 49^55^264^ 50^^66^
ABD00080035
n. cm? mxxz (continued)
D. Piping Between Receivers, Collect Tank & Recovery ftrMH-tng
Drawing
Tag No,(s)
CAHER-Ufi-1)
137^139_^60j^* 138*^159
E. Piping Nest to Old Control Boom Going to the Pipe B^k Between D-400 & D-500
Drawing
Tag No.(s)
(ABER-UtS-16)
265-^274_v'785_*-^* 272/275*286 273^276 */287
F. Batch Water Strippers
Tnratlm Drawing
Tag No.(8)
a. North BUS CABHKrU?S-22) b. South BUS (AHER-1PS-23)
147_^50j/J53_^ ItojASljAX'S 149U52jg35*
156^
150/}42*145j^ 140^143_J46J^ 141^144
MOTS/.
PLU6660 Po^t
no vi^Nve.
ABD00080036
H. CUD MOTE
G. Incinerators
locatim
Drawing
Tag No.(s)
a. Piping to Flame (ABEHrtfS-25) 344j/346j^349j/351t^
Arrestor
(ABER-IilS-26) 345^347_^650v^
b. Flame Arrestor rABE&US-26) 348 to the Incinerator Piping
c. West Incinerator (ABBHDS-27) 33SL-34L340__342__
d. East Incinerator (ABHHitS-27) 334^36^38^-
335*^337
Recovery Svstan
Locatrfm
Dewing
'fag No. (8)
a. Lead H) Pot
CABER-IitS-15) 171/173 (ABHHBS-15A) 17V174_i>
b. 2nd K) Pot/Piping (ABQKPS-15) !76Kl78v/198tx (ABHHBS-15A) 177^97
c. KD Ptcpe/Piping
(ABHWBS-12) 199202j^
201_2Q3j/
d. Vacuun pints/
CAB0HDS-14) 179/}82^85/L88*X
Ccnpressora/Piping
180^/18386189^'
181v484^87^
e. Seal water
(ABER-LRS-14) I90j^93_^96j^
Separators/Piping
191_j^94^200^-
192^95 '
f. Seel water
(ABER-LRS-13) 204^208^12 ^343
Sibcoolezs/Piping
2Q5j^09_c^3ix
aKj^lO^Hj^
207^1^15jr
g. VCM Omdgwora
h. Collect tank. HD Pot heat Bg7hnwgpr
CAHHHBS-11) 216 283^-
(ABER-UtS-10) 161^164^167^170^
162^165*^168_r-- 163^166^169
ABD00080037
m. EMISSION RBCXMKy SyggM Incfitinn
a. KD Pot/Piping/Head Exchanger b. Seal Water Separators/Heat
Bcchanger on Hoof
c. Seal Water Punps/Fllters
d. KD Inlet Piping e. CcapiesaozsA^acuxa Punps/Piping
F. Seal Water Heat Exchangers
Drawing fABER-LRS-19) (ABER-LPS-20)
(ABHMitS-20) (ABER-LRS-18) (ABER-LRS-2J)
(ABER-US-21)
Tag No. (s) 220^221<^222^
247 **250 S253 ts
248^251^45 ^ 249 *252j/246
254^257 ^260 255 ^58^61*^
256s259jS^
217218219_cX
223 ^229 ,^35^ 224 ^230^236^ 225^231 X237 ^ 226*232,/238.^
227^233^239^
2284^234^240^ 241*243^ 242^244^
262
ABD00080038
IV. NEW MXCLE fcanrinipH) B. VCM Receivers Location
a. East KVCM/piping
Drawing (ABER-12A)
b. West HVCM/pipiiig c. FWM/piping
(ABER-12A) (ABER-12A)
d. Pipe rack North of VCM Receivers (ABER-12)
e. KWM pmps/filter piping
(ABER-11)
f. EVCM pusps/fllters piping
(AEER-11)
Tag No(s)
443_^450_^59 444_*457_^ 445^458
446 ^449 ^460 447_455461_^ 448^456*^462
451^454 <>465 .y^ 452c^463t^466 ^ 453j/464j_467__
468^ 475^478^ 469jA76j^79__w474^77^480^ 481^ 483 482^484^
485_M93^498_^503^ 489494_^499_^511 490^95^500^491^496^01^492^497^502_;
54^512_e519_f^ 505^512^520
507^15^22^ 508_^516_523__ 509517_^ 510J/518J;;
Mots:
f.% ;> ^-6*
MfttAie orJ *!Kt
ABD00080039
TV. NEWMXWIB AREA
A. Reactors Locatim
a. RE 745 reactor head/piping
HX 745 coodensor RX 745 bottcm piping
b. RX 744 reactor head/piplng
RX 744 condenser RX 744 bottom piping c. RX 743 reactor head/piplng
Drawing (ABER-24)
(ABER-4)
(ABER-3)
RX 743 ondanfior RX 743 bottcm piping d. RX 742 reactor head/piplng
(ABER-2)
RX 742 conriawor
RX 742 bottcm piping e. RX 741 reactor head/piplng
(ABER-1)
RX 741 condenser RX 741 bottom piping
Tag No.(s)
598*'"bQ0 599^601
602/603
604^606^608^ 605j*607
591/593 ^595^ 592j^594
5%j^597_j/
614
546^589^ 547*^363 ** 548_^
587/588j^90J^'
611/612j/
577 '$80 w/ 578 ^581 */
579jS3Slj/
583/585 584_^586j^*
567^570 ^573^ 568^571^ 569_r^72_i;r
574/"576 575
613y616 ^
ABD00080040
NEW HxxJLE (continued)
C. Blowdown Task
Location a* Pumps
b. Filters/piping
c. Blowndc**n tank/piping Recovery System
Locatlm a. KD Pots/piping - lead
- 2nd
b. Vacuun Punps/plping
Drawing (ABER-20) (ABER-20) (ABER-20)
Drawing (ABER-23)
(ABER-22)
c. Ccnpressors/piping d. Seal Water Separators/piping
(ABER-22) (ABER-22)
e. Relief Valve Line from SWS
(ABER-22)
f. Recovery Ccodensors
(ABER-21)
g. Seal Water pmps/filters/piping (ABER-18)
h. Seal water heat exchangers 1. KD Pot punps/plping
(AHER-18) (ABER-18)
j. KD Pot heat exchange
(ABER-17)
A
Tag No. (s)
5351/537 *639 r*
536^_538_540^
530^532 ^534^556^ 53l533^555_^
524^526 528^1 w 525^527_^529^542_?
Tag No*(s)
374^376^378 ^380 375^77^379^81^.
382 1^384 383_^385_t^
386*688 &&*&**
387^89^04^-.
39l392^393_^f
394*696(698^400 *^ 395_^397_^_399'
401 '403 402^406^
407^409^11^12^ 408^410^-
4281/431 /434t^437^440 t486^ 429^432 >35^438 >41 =487 t430>33^_436>39_>42>88J-
423 t/425^427 ^ 424_>26_^
416^419^422^ 417 >20 ^ 418j421_^
413%/414 ^415
ABD00080041
NEW M3XJLE (continued) E. Pipe Racks Location
a. Piping from receivers (North direction to West direction towards reactors)
Drawing (AEER-13)
b. Piping from #E.a. towards reactors
(ABER-19)
c. Piping from #E.b. to N-5 piperack East of reactors
(ABER-5)
Tag Nb.(s)
543_>550_^ 544^553 o 545^554 ** 549c/564 ^ 565_*f
551 560 ^
552 561 **
558 ^562 ^ 559^57^
563 *415 ^ 566jx617t^