Document Znxewk4rVJ7rEGZaXDOY7bN0Y

FRAZER FAINT COWFACT 2475 Hubberd Avenue Detroit, Michigan SCHEDULE I TRADE LAKE: CATEGORY: COLOR: QUALITY: X-90 Stipple Interior Flat Wall Paint White Second Pigment: 78% Lithopcne Calcium Carbonate Asbestine Calcium Linoleate Vehicle: 22% Stainfess Raw Linseed Oil Heavy Bodied Linseed Oil Varnish Mineral Spirits Drier Lbs. 550 27C to 14 47 53 to 105 6 Yield in Callor.s______ Unit Cost Total Cost Weight per .045 .01 24.75 2.70 gallon finished product. .01 30 .075 1.03 Storage & handling cost Laboratory through loss - 1% records 17.3 lbs. 28,80 .29 .175 6.35 .149 '7.58 .14 .015 4.20 1.58 .07 .42 Storage 4 handling cost through loss - 3% 20.13 .60 Calculated Yield Manufacturing Loss - 2iX Actual Yield 1105 63.9 1,6 62.3 Cost Analysis : Material cost-par gallon Direct labor cost her gallon Factory overhead per gallon Bulk cost per gallon Complete package cost per gallon, including filling charge Factory cost in package per gallon FRICES (a) To a company owned or controlled outlet (b) To an independent wholesaler (c) By comrany owned or controlled outlet to retail customer (d) To ar. independent retailer-( Dealer) f e ) To ether ( Industrial) (Contrac . ..-r) 49.82 .80 .13 .,9195 1.17 Non Non 2.75 None 2.34 1.70 OPA 16227 N 5125