Document ZnxReQkBqLe4ao6ozz2M0dmVZ

Page No. 09/08/87 1 Review Itei ABERDEEN CHEMICAL PLANT SAFETY SYSTEMS REVIEN SEPTEMBER 1, 1987 Concerns Action Date A Propane Systew-Tank5 and Vaporizers Catalyst Freezers Bleeder Valve Program Emergency/Disaster Plan Eaergeney/Disaster Plan Power Failure Procedures H Electrical equipwent not 1) Project 8SX cowplete. 12/31/87 TFL explosion proof t instrument Existing sequencer obsolete so revisions needed. ordering new one. 2) Material of construction of 2) Transfer pumps are ductile 02/03/87 TFL transfer puaps. iron which are acceptable. 3) Rewote shutdown 3) AFE approved June 11. Nov. 11/15/87 TFL capabilities. 4) Full port sight glass in 15, 1987 startup time. 4) Eliminated sight glass but 02/03/87 JNE unloading systew. retained flow indication. (Bate with external lever which rotates with the gate). 5) Absence of leak detection 5) Project complete and 08/12/87 TFL system in sphere and boiler operational. area. &} Use of the direct fired 6) Having another natural gas / / JHN vaporizers as backup. The supplier will eliminate the direct fired vaporizers are need for the direct fired for emergency use only and vaporizers. appropriate safety revisions must be made before use. 7) Guardposts protecting the 7) Project complete and 08/12/87 TFL unloading station and pump operational. pad. 1) Insrumentation PM needed. 1) Up to date except will / / TFL start yearly control system PH and calibration il-E supv.). To be done during August and October shutdowns. 2) Backup temperature 2) Installed and operational 02/03/87 DNH indication. in little freezers, 3) Honitoring by operations 3) A-operator logsheets have 08/20/87 DNH been revised and are being used. 4) Emergency plan does not exist for freezer failures 4) P. Engineering will investigate. 09/30/87 HLN 5) Extended power outage, 5) Project complete and 08/12/87 TFL operational. 1) Program not up to date. 1) Program is up to date but 09/28/87 HLN the surveys are not. Plan and surveys up to date by 9/87. 1) Plant preparedness. 1) Plant emergency plan 12/31/87 KLF revision is complete. Community awareness Plan in progress. 2) Community Awareness 2) Community awareness plan is 12/31/87 KLF in progress. 1) PH of AHS system valves and 1) PH determined adequate. See 01/29/87 TFL instrumentation. attached PH sheet from 01/29/87 meeting. VAB. OOO1128293 Page No. 09/08/87 2 Review Item ABERDEEN CHEMICAL PLANT SAFETY SYSTEMS REVIEW SEPTEMBER 1, 1997 Concerns Action Date Resp VCM Sphere/Unloading Area 2) Eaergency generator PM. 2) Same as number one. 01/29/87 TFL 3) Reactor T/P chart drives 3) Installed - will be 12/31/87 SK6 not on eeergency power. operational with new module shutdown in September. 4) Fire puap run lights. 4) Installed and operational. 02/03/87 REP 51 Instrument air pressure 51 Have requested funding for 12/31/87 REP indicators not on eaergency additional 120V supply. No power. spare 110V available. 61 Reactor aechanical seal 6) Bladders in both reactor 02/03/87 JME integrity. aodules are installed and operational. 7) Eaergency equipaent - 71 Estiaate coaplete by 8-31. 0B/31/87 REP diesel supply. 8) Operator training on 8) Training is coaplete. 02/03/87 JHE reactor aechanical seal power failure procedures. 1) Need to "mothball* bullets. 1) Vapor phase corrosion 02/03/87 TFL inhibitor has been injected to coaplete aothball plans. 21 PM on unloading compressor 2) Annual PM and docuaentation / / TFL shutdown instrumentation of pressure and temperature (temperature 1 pressure switches is planned. See switches). attached PM sheet from 01/29/87 meeting. 31 Compressor belt drive PM. 31 A aonthly check of belt / / TFL tightness will be aade and documented. See attached PM sheet froa 01/29/87 aeeting. 4) Development of effective 41 Completed and implemented. 02/03/87 TFL railcar chock. 5) 6rounding system upgrade 51 6rounding bolts in plant to 09/30/B7 DAM be installed as 2nd quarter 1967 maintenance budget item. Project to be complete 9-87. 6) Routine inspection of 61 On chief operators 02/03/87 DHH sphere transfer pumps and of checklist (once/shift). the tandem seals required. 71 Shere puap cavitation problem may cause puap 7) Under evaluation by process 08/30/87 MLN engineering. To be complete failure. 8-87. 8) Remote operated valve installation and 81 This project is part of the 09/30/87 F6J other Remote Operated Valve instrumentation. Project. Waiting for VCM sphere shutdown. Installed & operational by 9-87. 91 Firewater supply to railcars may be inadequate. 9) Determined inadequate. 4th fiscal quarter 19B7 budget / / JSC itea. VAB. OOO1128294 Page No. 09/08/87 3 Review Itea ABERDEEN CHEMICAL PLANT SAFETY SYSTEMS REVIEW SEPTEMBER 1, 1987 Concerns Action Date Reap Fire Training Mechanical Seal Systeas Reactor Relief Valve PH Non-Reactor Relief Valve Fixed Point Monitors P-i PA Tank 10) Redundant level & pressure 10) Part of reaote operated 09/28/87 TFL alaras for the sphere should valve project. Installed by be pursued. 9/87. 11) Drain valve on dike area 11) Under evaluation by EBB. 09/28/B7 MLN left cracked. Project coaplete by 9/87. 12) Eliainate bullseyes in 12) Process Engineering 12/31/87 MLN unloading lines. investigating. A trial device has been purchased. Estisated project coapletion 12-B7. 1) Maintenance involveaent. 1) Personnel have been trained 02/03/87 KLF and instructed on their role in a fire. i) Reactor seal failures 1) Prograa to reduce seal 08/13/87 JME prevalent. failures ongoing. Status report of 7/17/86 latest update. JME following up. 2) Training on reactor seals 2) Coaplete. 02/03/87 JME 3) Routine inspection of 3) The A" operator check list 02/03/87 J6C aechanical seals in VCM has been revised to include service aay be inadequate, routine inspection of aechanical seals in VCM service due to Subpart V of the new EPA regulations. (J6C & JME) 1) Need aaintenance procedures 1) Issued aaintenance PM 02/03/87 TFL for relief valves. prograa. 2) Relief valve PM prograa 2) The relief valve project 08/13/87 TFL iapleaentation and the relief has been coapleted on the 10 valve project. reactors. 1) Need non-reactor relief 1) Non-reactor relief valves 12/31/87 DAM valve prograa. in both reactor aodules were serviced during the 8/86 & 9/B6 shutdowns. Plans are underway to routinely service all non-reactor relief valves. To be coaplete 12/87. 1) Line pluggage/leakage aay give erroneous results. 1) Plans to check all 40 points once/year. See attached // TFL sheet froa 01/29/87 PM aeeting. 1) Tank aay be unsafe due to 1) Preliainary thickness tank condition and/or support. testing on the vessel was / / TFL favorable. Further testing will be incorporated in the Pthalic Anhydride Fluff Containaent project. 2) PA fluff froa tank -exposure and enviroaental {3rd Fiscal Qtr. budget itea). 2) Class "A" design (revised) is coaplete & issued. (3rd // TFL problea. Fiscal Qtr.budget itea). VAB. OOO1128295 Page No. 09/08/87 4 Review Itea ABERDEEN CHEMICAL PLANT SAFETY SYSTEMS REVIEW SEPTEMBER 1, 1987 Concerns Action Date Resp Safety Systeas PM (attached) 1) Are listed iteas still being cDepleted. Gas Detectors in the Dryer 1) Dryer detectors not Area operational. Infrared Surveys of Electrical Equipaent H Yearly survey. Aaaonia Systea 1) Annual inspection and relief valve check. 2) Written safety prograa for unloading trucks. 3) Leak patrol. Reaote Operated Valve Project Sulfuric Acid Systeas Chlorine Cylinders Valve Indications 1) Project Caapletion. 1) Procedure on unloading. 2) Training on unloading procedures. 1) Training on use of leak repair kit. 21 Operator training on cylinder handling. 1) Coapliance plan liait switches. 2) 1986 liait switch project Portable Gas Detectors 3) 1987 liait switch project. 1) Quality of repair inconsistent. 1) Process Engineering will 09/12/87 EBB aonitor prograa and establish the routines. EBB is in the process of putting the inforaation in the coaputer for easier access and docuaentation. 1) Detectors have been / / REP installed. Mechanical will talk to operationsto decide when to Bake operational. 1)Docuaentation is up to date. /! TFL Cover letter of each survey to be sent to process engineering. (I h E Supv.) 1) Annual inspection will be / / TFL started in 1987. R.V. will be on a five year prograa. See attached sheet froa 01/29/87 PH aeeting. 21 The new unloading procedure / / TFL is still under review. Utility supv. will take care of unloading. 3) A detection technique and / / TFL survey procedure are being investigated See attached sheet froa 10/30/86 PM aeeting. 1) Systeas to be coaplete fay 09/30/87 TFL 9-87. 1) Unloading procedure was m11/13/86 issued 11/13/86. 2) Training has been 02/03/87 DHM coapleted. 1) Training has been 02/03/87 TFL coapleted. 2) Training has been 09/01/87 HHM coapleted. 1) Project installed and 02/03/87 TFL operational. 2) 46 of 46 liait switches are 02/03/87 TFL installed and operational which coapletes this project. 3) Class 'A* design coapleted. Bent to aechanical. (2nd Str. / / TFL 1968 budget project). 1) 2 training sessions have 02/03/87 TFL enhanced the repair quality. VAB. OOO1128296 Page No. 09/08/87 5 Review Itee ABERDEEN CHENICAL PLANT SAFETY SYSTEMS REVIEW SEPTEMBER 1, 19B7 Concerns Action Date Resp VCH Piping I & E Alare and Shutdown Interlock PM Prograe Incinerators VCH Recovery Systeas 2) Water condensation on the detection head. 3) Test procedure. 4) PM is done weekly. U Baurdposts to protect VCM piping concrete west side of road passing with curb. 2) Protection against overturned railcar. 1) Boilers-coeplete once/year 2) Solved using aabient 02/03/87 TFL teaperature charging cabinet. 3) Operations has been 02/03/87 TFL provided with HNU test procedure to coaplete this itea. 4) Process engineering will be 09/12/87 EBB getting report to check. 1) Coaplete. 02/03/87 TFL 2) 3rd and 4th rail required/ 09/01/87 DAM planned. Funded in aaintenance budget. Installed 9/1/87. 1) Up to date. 02/03/87 TFL 2) Incinerators- coaplete 2) Will start a seai-annual 01/01/01 DAM twice/year inspection (April and October) and docuaent it. 3) Eaergency kill systea 3) See attached sheet froa / / TFL twice/year. 01/29/87 PM aeeting. 4) Catalyst freezers-annualy. 4) See attached sheet froa / / TFL 01/29/87 review aeeting. 5) Vinyl dryers (rotary and 5) Burner aanageaent systeas / / TFL fluid bed) once per year. will be done annually and docuaented. (I6E Supervisor) 6) Propane vaporizers 6) Will be docuaented. PM done / / TFL once/year. currently. 7) Inert gas generator 7) PM sheet will be generated / / TFL once/year. and PM will be done every spring and docuaented. 8) Reactor instruaentation. 8) Pressure alaras checked / / TFL once per year and when reactors opened. Teaperature systea will be checked once/year during shutdown V will be calibrated and docuaented. 1) PM prograa to check 1) See attached sheet froa / / TFL internals of liquid seal flaae 01/29/87 PH aeeting. arrestor. 2) Refresher training prograa. 2) Coaplete by / / TFL 3) Revise and update 3) Coaplete. 02/03/87 TFL incinerator logsheets. 1) VCM recovery coapressor 1) / / TFL casings and rotors are being Process/aechanical/operations daaaged (severely) by investigating the problea. corrosion and/or errosion. * VAB. OOO1128297 Page No. 09/08/87 1 Review Item PREVENTATIVE MAINTENANCE CONCERNS AND SOLUTIONS FROM 1/29/87 MEETING Existing PM Action Coapleted/Planned Resp CATALYST FREEZERS 1) Big Freezers 2) Chest Freezers POWER FAILURE PROCEDURES 1) Refrigeration systea 1) Will start yearly control systea TFL checked weekly. Controllers PM and calibration, and docuaent checked only if N.O. written. 2) Checked on shutdown 2) No action needed. TFL basis only. 1) AMS Kill Systea. 2) Emergency Generators VCH SPHERE/UNLOADINS AREA DAnnual PM of entire 11 No further action is planned. systea during aodule shutdowns. Operations checks pot alaras when any reactor shutdown. Operations also checks the valves weekly 21 Large generator is run 21 No further action is planned. weekly by operations. Maintenance does aonthly PM and instruaentation PM. TFL TFL 1) Unloading compressor 21 T-201 Pressure snitch. 3) Coapressor belt drive PH. FIXED POINT NONITORS 1) No up to date documented 1) Annual PM and documentation of TFL PM. all pressure and temperature switches is planned. 2) Done annually, not 21 Will be documented. TFL docuaented. 3) None 3) A monthly check will be made for TFL belt tightness, and it will be docuaented. 1) 40 Fixed Point Monitors AMMONIA SYSTEM 1) Only checked if a problem is discovered. 11 Will check all 40 points once/year and docuaent (1 6C/quarter). TFL 11 Annual Inspection. 21 Relief Valve 3) Leak Survey INCINERATORS 11 None 21 None 31 None 11 Annual inspection plan is being TFL determined. 21 Relief valve will be put on five TFL year program. 31 A detection technique and survey TFL procedure are being investigated. 1) Liquid Seal Flaae Arrestor. 1) None 11 Check and document baffle integrity once/year. TFL VAB.0001128298