Document ZnpJa4KX81NMqX1Mrop6grnqd
-fr -A *.> COPYRIGHT 1953, HOPPERS COMPANY, INC.
1'L-Aimu'l' a *AXlil>li
m m m
m
PIPE LINE HANDBOOK
. . . FOR THE ASSISTANCE OF PIPE LINE ENGINEERS AND CONTRACTORS
.1 securing the most effective selection and application of protective .eatings for gas and oil (crude and products) pipe hues.
. . . FOR THE GENERAL INFORMATION OF anyone '.vho may be interested directly or indirectly m the construction and protection of pipe lines.
J REGISTERED TRADE-MARK
BIIUMASIIO*1
ONLY KOPPERS MANUFACTURES BITUMASTIC PRIMING SOLUTIONS AND ENAMEL5
IN THE UNITED STATES AND CANADA
kh*J
DIFFERENT TYPES OF PIPE LINE PROTECTION IN USE TODAY Ft .ir.e traveling machine application in the field, me conic-mat inn > -aring ty..;: trials generally used today are as follows:
1. SINGLE-COAT, SINGLE-WRAP
2. SINGLE-COAT, DOUBLE-WRAP
Approximately 90% o{the pipe coating combina tions currently applied by line traveling machines are of the `'single-coat" types, since they provide adequate protection for all conditions except those of extraordinary severity.
3. DOUBLE-COAT, DOUBLE-WRAP
The double-coat, double-wrap systems, as a rule, arc used only when exceptionally severe condi tions are encountered in the handling and burial of the pipe ... for example, situations in which backfill contains a good deal of rock or <or river crossings.
10
I
SECTION
PRESENT-DAY METHODS
B FOR PROTECTING PIPE LINES
I
I PRESENT-DAY METHODS FOR J PROTECTING PIPE LINES
I
j BY THE LINE TRAVELING MACHINE METHOD j
i Modern methods of applying protective coatings to pipe for underground
service represent a great advance from the techniques used in the early i days of pipe line construction.
The early methods were by no means ineffective. In fact, Bitumastic j Enamel Coatings, applied to pipe by the "granny-rag," dauber, or sling
(without wrappers) more than thirty-five years ago, are still providing
3 effectual protection against corrosion. Relatively crude and incomplete
as these early installations were in comparison with modern pipe line
3 protection, they provide evidence of the high and inherent protective
capacity of Bitumastic Enamels. And Bitumastic Enamels themselves 3 have, of course, been greatly improved over the past quarter century.
As the drawings on the opposite page indicate, the basic elements in
3 modern pipe line protection are . . .
j
3 THOROUGH CLEANING
THE ENAMEL COATING
OF THE
In the pipe protection system, the enamel is
3
BARE PIPE
the principal element of resistance to the attacks
J
Permanent effective pipe line protection de mands that the protective coatings be firmly
of underground corrosive agents. Bitumastic Enamels, inherently resistant to water, electro
3
and continuously bonded to the pipe metal itself. In other words, the coatings must be
chemical action and electrolysis, provide an im pervious protective skin or barrier around the
3
applied to pipe surfaces that have been thor oughly cleaned. A positive, continuous and
pipe, effectively shielding the steel from the metaldestroying action of soil water and soil chemicals.
permanent bond cannot be made to foreign matter such as rust, welding scale, dirt, dust
Another important advantage of Bitumastic En amels is that they can be applied to a thickness
i or moisture.
of approximately 5^" in a single coat.
3 THE PRIMER
THE WRAPPING
(and what it doe*)
The primary purpose of the wrapping is to
3
The function of the primer is to provide
protect the Enamel from mechanical damage
maximum adhesion between the pipe surface
during and following the installation of the coated
3 and the protective system as a whole.
pipe underground. In order to function properly
Bitumastic Primers are formulated and proc
as a shield or reinforcement, the wrapper (or
1
essed to adhere tenaciously to the steel and, at
wrappers if two are used) must be made of
the same time, to provide a compatible and
materials highly resistant to deterioration through
3
highly adhesive base for Bitumastic Enamels
contact with soil, water and chemicals. Because
applied over them.
of their exceptional inertness to water and
3
Bitumastic Primers are also designed for rapid
chemicals, coal-tar-saturated asbestos felt and/or
drying and time-saving between priming and
glass wrap are generally used as wrapping
enameling.
materials in present-day protective systems.
i 11
i
THE LINE TRAVELING COATING
The coating and wrapping operation (illustrated here) follows the cleaning and priming operation after a suitable interval. This interval will usually be within the range of 1 to 120 hours. Insufficiently dried Primer will not provide maximum adhesion with the Enamel coating. On the other hand, over-dried or "dead" Primer will lose its adhesive capacity. When the temperature is warm and the weather is clear, a few hours' drying is satisfactory. For practical tests to determine proper dryness see pages 79, 93 and 94.
o
SECTION
D THE LINE TRAVELING COATINl AND WRAPPING OPERATION
AND WRAPPING OPERATION
1. THE COATING AND WRAPPING MACHINE moves forward along the primed pipe, apply ing the Bitumastic Enamel and wraps as it travels.
2. THOROUGH REMOVAL OF DUST from the dry Primer is necessary to insure proper adhesion to the Enamel.
3. THE "HOOSIER POLE" keeps the machine in vertical balance.
4. A PAIR OF SIDE-BOOM TRACTORS is gen erally used to lift and support the primed pipe for the passage of the coating and wrap ping machine. Moving support is provided by roller cradles controlled by block and tackle from the booms. Care is exercised to minimize damage to the Primer.
3. THE HEATING KETTLE containing the Enamel heated to proper application tem perature and carrying a supply of rolled wraps, is drawn by the rear tractor. Enamel is fed from the kettle to the machine through a special flexible metal hose.
6. ELECTRICAL INSPECTION. An operator equipped with an electrical "holiday de tector" follows the coating and wrapping machine. This electrical device (as its name indicates) detects "holidays" or defective spots in the protective coatings. For recom mended voltages see pages 83, 98 and 99.
7. SKIDDING. The coated and wrapped pipe is not permitted to rest on the ground while the Enamel is still hot. It is supported on skids and remains on the skids until the Enamel is cool and the pipe is lowered into the ditch.
8. IN HOT WEATHER, particularly, it is de sirable to use sand bags or padded skids to prevent sharp edges of bare skids from cut ting into the Enamel and wrap before the Enamel cools.
9. "TOUCH-UP MEN"fol!owing the coating and wrapping machine make all necessary re pairs of missed spots indicated by the "holiday detector" or caused by mechanical damage to the coatings.
10. A SUPPLY TRUCK carries all necessary tools and materials for the handling of the repair work ... as well as other supplies and materials utilized in the coating and wrap ping operation.
29
LAYOUT OF A TYPICAL PIPE COATI^* '
This d: igrnrri illustrates the layout and flow of operations In -s pipe c: nv.ng and wrapping factory. Although these plants differ somewhat r. irrangement and types f equipment, they all have facilities for thnrvyiiv completing each of the steps in pipe protection. Topical :ra . Ant rtachincrv is shown in the diagram and l'iustr' ior.s .'nl'-w.ng
1, STORAGE FACILITIES
Pipe coating and wrapping factories usually in clude ex--nsive yard facilities for the outdoor storage of hare pipe in the range of sizes required in the construction of gathering, transmission and dir.r.huticn lines. They also have storage areas iW.rh 'indoors and outdoors) for coated and wrapped pipe.
As an extra service to their customers, some factories store bare pipe for several months, pending completion of construction plans.
Typical Storage Facilities
1. PRE-HEATING
The bare pipe is transferred from the storage area to a pre-heating area (shown in the center background of picture below). Pre-heating perft-rms two important functions. Incoming pipe, passing through the warming area, loses all surface moisture that might slow up or be detri mental to the cleaning and priming processes. And pre-heating warms the pipe to the most appropriate temperatures for efficient cleaning end priming.
Pre-heating
rf= LAYOUT OF A TYPICAL
mPE COATING AND WRAPPING FACTORY
iWD WRAPPING FACTORY i continued on r. page)
3. CLEANING
4. PRIMING
The warm. !rv pipe passes from the warming
The priming unit in a coating factory consists f
urea into "he r'.raning unit. The cleaning process
apparatus tor spraying, or brushing, dry and thor
fas emphasized in connection with the ,, uhn?
oughly cleaned pipe with Primer.
of pipe in the held) is vitally import.,:-.' :o
Mechanical agitators are used to uniformly r.v\-
effective protection. Primers cannot he posit:-/-, iy
the Bitumastic Primers in the drums in which
and permanent!;/ bonded to bare pipe ;ron
they arc received. The thoroughly mixed Pnrr.-r
which loose rust, scale, dirt, oil, grease or other
'.s then transferred from the drums to pressure
surface contaminants have not been completely
tanks. These tanks are equipped with mechanical
removed.
agitators to maintain constant uniformity of
The cleaning unit may be any one of several
Primer during application. Bitumastic Primers or
basic types of cleaning apparatus. The cleaning
Priming Solutions are formulated and furnished
operation may be done by rotary blasting with
in proper consistencies for application by spray
steel grit, rotary blasting with steel shot, air
ing. Consequently, an adjustment of consistency
pressure grit, shot or sand-blasting, mechanical
by the addition of thinners is rare!y made.
cleaning with rotary wire brushes, flame clean
Spray equipment is properly designed and
ing, manual cleaning with scrapers or solvents,
adjusted to apply Bitumastic Primers as received
or combinations of these methods.
without thinning. Special filters are incorporated
Generally, blasting is regarded as the most
in the compressed air system to remove all
effective cleaning process. The sharp edges of
moisture and oil from the air.
1
the abrasive provide a cutting action that effec
Brush applications are made by mechanically
tively cleans away all contaminants and leaves
rotated priming heads. Instead of using horse
a roughened pipe surface. The roughened surface
hair or bristle brushes, these heads are equipped
provides an excellent mechanical key tor the
with two bands or "rugs" cut from high nap
priming coat that is applied immediately fol
carpet. The "rugs" are adjusted to the correct
I lowing cleaning.
tension, then saturated with the proper amount
Because of various job conditions, no state
of Bitumastic Primer. The revolving "rugs"
ments or illustrations in this Handbook should
brush on the Primer very evenly. A steady,
be regarded as expressing a preference for any
adjusted stream of Primer is applied to the top
specific method of cleaning or type of cleaning
of the pipe a few inches ahead of the rotary
equipment.
priming heads.
The pipe line engineer, realizing the vital
Any accumulations of excess Primer at the
necessity for thorough cleaning of pipe before
base of welds is brushed out by hand after the
coating, will look to his Coating Applicator to
pipe has passed through the priming machine.
i
provide the most appropriate cleaning method
Thin or missed spots are also covered by hand-
for specific coating jobs.
brushing with bristle brushes.
Cleaning Machine
Priming Equipment
1
PLANT-COATID (P C)
SITU MASTIC SPECIFICATION
NUMB'S
SINGLE COAT AND
DOUBLE WRAP FELT)
BITUMASTIC ENAMEL
BITUMASTIC (approximately -'.'32 )
KRAFT WRAP
SINGLE COAT AND
DOUBLE WRAP (GLASS)
DOUBLE COAT AND
DOUBLE WRAP (FELT)
DOUBLE COAT AND
DOUBLE WRAP (GLASS)
DOUBLE COAT ANO
TRIPLE WRAP (FELT)
T ** BITUMASTIC
CLEAN
PRIMER
PIPE
BITUMASTIC ENAMEL
BITUMASTIC
CLEAN PRIMER
PIPE
BITUMASTIC ENAMEL
BITUMASTIC ENAMEL
(approximately %i")
Jr
KRAFT WRAP
'T BITUMASTIC
BITUMASTIC ENAMEL
GLASS FIBER WRAP
BITUMASTIC ENAMEL
KRAFT WRAP
CLEAN pR'MER PIPE
" Tmh e BITUMAST,C
ASBESTOS FELT WRAP
BITUMASTIC ENAMEL
ASBESTOS FELT WRAP
KRAFT WRAP
CLEAN PIPE
DOUBLE COAT ANtt-
TRIPLI WRAP (GLASS)
DOUBLE COAT AND
TRIPLE WRAP (GLASS A FELT)
*
T BITUMASTIC CLEAN PR,MER
*
BITUMASTIC ENAMEL
PIPE
^'
BITUMASTIC ENAMEL
T BITUMASTIC
PRIMER CLEAN
PIPE
BITUMASTIC ENAMB.
ASBESTOS FELT WRAP
KRAFT WRAP
FstcncN
BITUMASTIC PI.ANT.COATED PIPE SPECIFICATIONS
H?
BITUMASTIC
PLANT-COATED FIFE SPECIFICAT1 jNS
Ail coating plants have the facilities for applying ail of the types and grades of Bitumastic Primers and Bitumastic Enamels described in detail in Part 2, Section H.
The procedure to be followed for specifying and ordering Bitumastic Coatings to be applied at the coating plant isr
1. On the order for pipe from the . ae mil! or
pipe supply house indicate tha^
bare pipe
is to be shipped to the addren of the Coating
Applicator. "Specify that tne pipe shall be
free of excessive rust, grease, oil, mill lacquer,
or any type of paint.
1. Another order should be sent to the Coating Applicator, specifying the grade of Bitumastic Primer and Enamel to be used: also the desired Bitumastic specification number as described in the illustrations on the page opposite or below.
3. Your order to the Coating Applicator should also give the footages of each diameter pipe to be coated and wrapped: as well as the type of joint to be used for making up the pipe line in the field. For identification purposes, your order to the Coating Applicator should carry the name and address of the pipe supplier and your order number to him.
TRI^.E COAT AND
-"J'L WRAP (FELT)
TRIPLE COAT AND
TRIPLE WRAP (GLASS)
TRIPLE COAf AND
TRIPLE WRAP (GLASS & FELT)
BITUMASTIC PRIMER bitumASTIC ENAMEL
ASBESTOS FELT WRAP
BITUMASTIC
ENAMEL KRAFT
(approx. %i" ) WRAP
ASBESTOS FELT WRAP BITUMASTIC ENAMEL
I
f
-f" BITUMASTIC
T^TUMAsnc ENAMEt PRIMER
CLEAN PIPE
"Tbitoh `
BITUMASTIC ENAMt
CLEAN PIPE
T
GLASS FIBER
WRAP
T KRAFT
BITUMASTIC WRAP
T GLASS FIBER
BITUMASTIC WRAP
ENAMEL
ENAMEL
KRAFT
BITUMASTIC WRAP
ENAMEL
ASBESTOS FELT WRAP BITUMASTIC ENAMEL
On your order to your Coating Applicator, be sure to specify the grade and type of Bitumastic Coating desired($ee pages 60-6,3).
/ 3ITUMASTIC APPLICATION N W SPECIFICATIONS
DISPOSAL OF SPILLED ENAMEL
DISPOSAL OF MISCELLANEOUS
MATERIALS
CLEAN UP
Any Enamel which is p!:ed during application as veil as pieces of chopped Enamel which are dropped along the right of way. shall be removed, cleaned and used or buried to prevent their being eaten by livestock which like the taste of the Enamel. Although the Enamel is not poisonous, it is indigestible and an animal eating a large amount at one 'irr.e mav die as a direct result.
Enamel drum fins, empty Primer drums, broken skids and other onset-! laneous material shall be hauled away from the right-of-way and disposed of. Such cbiects shall not be thrown into the ditch before or during backfilling.
HEALTH AND SAFETY PRECAUTIONS
BITUMASTIC PRIMERS
When handling or applying Bitumastic Primers, protect exposed skin areas with a suitable cream such as cold cream or one of the unguents identified by such trademarks as Ply No. 2, 6 or 9, Noxzema, and Vase line. Any Primer which is accidentally splashed in the eye, should be washed out with mineral or olive oil. not water. Go to a doctor as soon as possible.
BITUMASTIC ENAMELS
In hot weather the vapors from heating Bitumastic Enamels may irritate exposed skin areas. Protect the hands by wearing leather gaunt lets. Before starting work, apply a suitable skin protective cream to the exposed face and neck areas. Be careful to avoid bums from the hot Enamels. In the event of a bad accidental burn, go to a doctor as quickly as possible. Do not remove the Enamel. When Enamel is accidentally spattered and minor burns result, strip off the Enamel then apply a good burn ointment such as those identified by the trademarks Vaseline. Unguentine, and Gadoment. Protect new skin with bandage and keep clean to avoid infection.
101
DETAILED INDEX FOR PART 3 (OTHER USES)
SECTION
SUBJECT
v'V/
OTHER USES FOR BITUMASTIC ENAMELS AND
COATINGS
CONTENTS
In the Oil and Gas Industries
fo)
oas
INDUSTRY
Compressor Station Exhaust Systems Cooling Towers Underground Storage Tanks Gas Holders Distribution Pipe Lines Service Pipe
PAGE
| 106 i ij j j 107 j 107 ' 108 j 108 J 109
109
(s)
0,L INDUSTRY
Tankers and Barges
Crude Oil Storage Tanka
Marine Piers and Platforms
I Bearing Piles and 1 Structural Members ' ,,. . , i Bulkhead Work l Piping
Water Storage
Water Lines
Stacks
Process Equipment
110 111
112 113 113 114 115 116 116
BITUMASTIC
105