Document ZnojKgqmLKpVpgKXOrjeQapXL

Interoffice Communication To P. L. Fetzer From Jay Zimmer Date Subject August 23, 1979 Work Done in July (conoco) 1) Continued work dealing with the deregulation of the east-end of block I. Findings show there are still problems with the monitoring system. (strip chart and computer not agreeing) 2) Monitored the incinerator vent stack when HC1 and chlorine were detected in tne air. (Light ends were being burnt at the time) Higher than normal levels of both were detected. HC1 y* 2.0 ppm Cl2 .6 ppm 3) . Took gas samples from the neutralization pit area to measure CO? levels. Concentration ranged from 260 ppm to 4900 ppm. TLV for COg is 5000 ppm. 4) Did study on the deregulation of regulated areas #2 and #4. Regulated area 2 is the loading rack - #4 are the loading pumps. The data indicates regulated area #2 should be deregulated while regulated area #4 should not. More work will need to be done to pinpoint the location of the exposure in these areas. 5) Monitored sandblasting operations to measure respirable dust concentrations. Results show unusually high readings which are believed to be biased in some way. Have filters in Ponca City to run silica tests so as to determine the amount of silica dust present. 6) Placed sipin pumps with charcoal tubes on tops of EDC tanks to possibly deregulate them. Data generated-.looked good except for T-453 which has a leak that requires immediate correction. For 8-hr samples VCM exposure disregarding T-453 EDC exposure disregarding T-453 .42 ppm 6.38 ppm For 15 min samples VCM exposure disregarding T-453 EDC exposure disregarding T-453 2.96 ppm 5.01 ppm 7) Met with management to discuss closeout of chemicals and talk about de regulation of the above regulated areas. 13 chemicals were closed out. Regulated areas will be decided upon at a later date. Silica and ethylene oxide will be closed out later - waiting for results from Ponca City R&D. vvc 000007760 8) Monitored SO^ cylinder changeouts and each time only 1 ppm SO2 was picked up on analyzer tube. 9) Monitored VCM Plant Leaks July 9 Block I VCM CDC .714 ppm 31.47 ppm July 16 Incinerator Cl 2 .-5 ppm July 20 Inci nerator Cl2 Vent Stack KC1 2 ppm 2 ppm In front of maintenance shop Clo .8 ppm HCT 2.0 ppm burning light ends during this time and SO2 ran 1 From piping leading to the ve stack. Jay Zimmer 000007 761 VVC