Document ZnkKx3edX6ZxN7yEoM2440nnL
rt . . ,
0a
W 002168
Asbestos Action Notification Information
1. Date of notification: 9/6/91
2. Group: National Medical Care, Znc.
3. Division: Dialysis Services Division
4. Facility involved: BMA Sanford, FL 210 East Commercial St. Sanford, FL 32771 407-323-3706
5. Facility contact: Gary Starley (Chief Technician) 407-323-3706
6. Primary contact: Lawrence Park PHONE #: 617-466-9850, extension 467 FAX # : 617-890-6473
7. Type of materials:
o Floor tiles o Mastik
8. Location within facility: Dialysis room
9. Installation date: 1980
10. Approximate quantity: 630 square feet (of which 300 square feet will need to be removed. Linoleum flooring and mastik have 40% chrysotile asbestos.
11. Present condition: Deterioration, of material
12. Action has not yet commenced.
13. Description of scope: Pending Grace approval, would like to remove 300 square feet of asbestos containing material in the Dialysis room.
14. Date action planned: As soon as possible
15. Reason for action: Emergency repair
16. Consultant involved: Westinghouse Environmental Altamonto Springs, FL
i>/tt
IPMISCNSANFOftD
003006
"4
m
1. Date of notification: August 27, 1991
2. Group: National Medical Care, Inc.
3. Division: Dialysis Services Division
4. Facility involved: BMA Capitol Hill 900 M Street S.E. Washington, DC 20003 202-547-2880
5. Facility manager: Entel Wright, Chief Technician 202-547-2880
6. Primary contact: Lawrence K. Park, Director of Corporate, Health, Safety & Environmental Affairs
7. Type of material: Floor tiles/mastik
8. Location within facility: - Dialysis Patient Treatment Area 1,360 square feet
- Reuse room - 200 square feet
9. Approximate date of installation: 1976
10. Dialysis patient treatment area - Floor tile: 2% chrysotile* asbestos
Mastik:
15% chrysotile
asbestos
11. Condition of flooring has deteriorated beyond repair.
12. Action has not yet commenced.
13. Plan to remove asbestos containing material (ACM) as soon as approval is granted by Office of Environmental Protection, W. R. Grace & Co.
14. Action is planned as follows: as soon as possible.
15. Reason for action: emergency repair (due to deteriorating condition).
16. Consultant used: Integrated Environmental Management, Inc. Boston, MA.
tp/tt IPM1SC\CAPTIHII
003007