CEA 1430 & 1800 Date: August 28, By: R. S. Yates Page 1
1967
1.1TITLE
Aroclors - Increase Aroclor Capacity - Organic Division
At Anniston Plant - CEA 1430
At WGK Plant
- CEA 1800
1.2_SUMMARY
The objectives of this project are to,
a) Provide
finished floods storage facilities
at AnnistoiiandwSirK'assure 1 a minimum inventory
of the various Aroclors and Aroclor blends so that
bulk shipments can be made on demand.
b) Provide at Anniston for blending and djjumming of the several Aroclors witffT?ffi8T,ll*fcomponeCT?,,wfthout
interfering with primary production facilities.
c) Minim:ze potential for cross contamination of products.
d) Provide loading facilities for tank lyjuck^ and tank-cars and unloading facilities"for jaw mater
ials in tank cars.
e) Provide additional raw material biphenyl and at Anniston for TJg and
at WGK for
Xl~-
f) Provide at Anniston new expanded facilities for fleeing and bacjcjjLnc^ biphenyl and ^olid^ Aroclors `
l^
- IZ&A
g) Provide new facilities at WGK to increase plant capacity from 29.5M lbs./year to 69.5M lbs./year.
h) Provide an overall production capacity for liquid Aroclors of up to 30% more than indicated in the latest Sales forecasts.
Pjflitijjf for an orderly expansion of the WGK and Anniston A ro c 1 o r "iTaciYl t lesT"-1**
Addition of these facilities will result in capacity increases over the present standard'1' capacity as
follows:
03^6000
TOWOLDMONOQ44312
1.3 1.31
At WGK, At Anniston,
CEA 1430 & 1800 Date: August 28, Page 2
Liquid 40.0M Liquid 5.7M Solid 1.0M
lbs./year lbs./year lbs./year
1967
I
(1) Note - Standard capacities at present are:
At WGK,
Liquid 29.5M
At Anniston, Liquid 48.0T!
Solid 10.
lbs./year lbs./year lbs./year
The installation at Anniston will include finished storage and blending tanks, two flakers for solid Aroclors and biphenyl, a drumming station, tank car spur and loading facilities and bagging station for solid Aroclors and biphenyl.
The installation at WGK will include a new continuous chlorination line, blow tank, intermediate storage, distillation equipment, continuous clay treatment facilities, finished storage tanks, and a biphenyl storage tank with additional rail spur and unloading docks.
Desired completion dates:
Tank farm at WGK Tank farm at Anniston Flaking facilities at Anniston New production facilities at WGK
July 1, 1968 August 1, 1968 September 1, 1968 December 1, 1968
PROCESS TECHNOLOGY
Process Description
Aroclors are the reaction products formed by the chlorination of biphenyl and/or terphenyls using an iron catalyst. The by-product HCl gas produced is absorbed in water to produce muriatic acid.
Crude Aroclors are produced in chlorinator reaction vessels, air blown and distilled. Liquid Aroclors are earth treated, filtered and loaded for shipment. Solid Aroclors are drummed, flaked or flaked and milled and packaged for shipment.
Distillation residues are discarded as waste or sold as Montars.
A numerical system of nomenclature is used for iden tifying the various Aroclors.
0346001
TOWOLDMONOQ44313
1.32
CEA 1430 & 1800 Date: August 28, 1967 Page 3
Product yields are calculated on both chlorine and biphenyl and are different for each plant and for each Aroclor produced. They are recorded in the respective plant cost standards.
Process documents:
"Standard Operating Instructions for Aroclors Anniston Plant" - April 1966 - M. J. Williams
"Standard Manufacturing Process for Aroclors Anniston Plant" - September 1966 - M. J. Williams
"Process Description for the Manufacture of Aroclors - Department 246 - WGK Plant" - October 1966 D. E. Harris
"Process Description for the Manufacture of Pyranols and Inerteens - Department A246 - WGK Plant" October 1966 - D. E. Harris
"Standard Manufacturing Process for Pydraul A-200 Department B-246 - WGK Plant" - October 1966 D. E. Harris
"Operating Instructions - Aroclor and Pyranols Departments 246 and A246 - WGK Plant" - August 1966 - V. Brawley
"Final Report on the Continuous Chlorination of Biphenyl" - June 4, 1957 - R. A. Simone
"Tentative Process for Continuous Chlorination of Biphenyl" - March 23, 1956 - R. A. Simone
"Final Report on the Continuous Chlorination of Aroclors - Plant Demonstration" - May 7, 1958 R. A. Simone
Raw Materials
1.321 Specifications
Reference is made to the respective standard process manuals for raw material specifications. Raw materials at Anniston, for this project, are the Aroclors and additives used in blends and mixes and at the flakers. Raw materials at WGK are the materials used for the manufac ture of Aroclors. A list of materials follows:
0346002
TOWOLDMONOQ44314
CEA 1430 & 1800 Date: August 28, 1967
Page 4
Plant
Material Code
WGK (246)
82601 33500 38800 19409 43099 81059
Anniston (27)
82612 81102 82641 82613 82613 82614 82614 82615 36100 60200 58500 61320
-
64010
Date
Material
12/8/64 1/7/66 7/21/66 1/21/66 2/18/65 6/29/66
Diphenyl Ferric Chloride, Anhydride Lime, Hydrated Attapulgus Earth 200/UP Nitrogen Gas Chlorine, Liquid
6/17/66 1/10/64 7/5/64 6/28/64 7/15/64 2/7/62 7/15/64 3/2/66 5/26/66 6/3/65 8/29/63 12/23/63
-
12/18/64
Aroclor 1242 Electrical Grade Aroclor 1248 Electrical Grade Aroclor 1248 Non-Electrical Grade Aroclor 1254 Electrical Grade Aroclor 1254 Non-Electrical Grade Aroclor 1260 Electrical Grade Aroclor 1260 Non-Electrical Grade Aroclor 1262 Glycidyl Phenyl Ether (1) Trichlorobenzene (1) Tetrachlorobenzene (1) Epoxide 201 Toluene Xylene
(1) WGK Specification 1.322 Sources
WGK
Biphenyl
Received from the Anniston Plant in 20,000 gallon unlined steel, steam heated tank cars. Transferred to an existing 25,000 gallon storage tank.
Chlorine
Received direct from WGK's Department 232 in a 4" transfer line. This line is being replaced by a 6" transfer line in the third quarter of 1967.
Ferric Chloride
Received from the warehouse in 2 lb. glass containers.
Lime, Hydrated
Received from the warehouse in 100 lb. bags.
0 346003
TOWOLDMONOQ44315
1.33
CEA 1430 & 1800 Date: August 28, 1967 Page 5
Attapulqus Earth
Received from the warehouse in 50 lb. bags.
Nitrogen Gas
Supplied by a bulk station located in the tank farm area.
Anniston
Aroclors are transferred by pipeline direct from department to storage and from storage tanks to mix tanks, to drumming station and to flakers.
Glvcidyl Phenyl Ether
Received from the warehouse in 55 gallon drums.
Trichlorobenzene
Received from Hooker Chemical Company in 8,000 gallon steel tank cars.
Tetrachlorobenzene
Received from Hooker Chemical in 8,000 gallon tank cars.
Epoxide 221
Received from warehouse in 55 gallon drums.
Toluene
Received from warehouse in 55 gallon drums.
Xylene
Received from warehouse in 55 gallon drums.
Products and By-Products
1.331 Quality Considerations
Marketing stresses that quality protection is the most effective means of protecting our present sales position of electrical grade Aroclors. Plant studies have shown that the use of aluminum tanks and aluminum transfer piping systems coupled with inert blanking of in-process and finished goods storage tanks will give us maximum protection.
03<i600'i
TOWOLDMONOQ44316
CEA 1430 & 1800 Date: August 28, 1967 Page 6
1.332 Specifications
Reference is made to the respective standard process manuals for finished goods specifi cations. Finished products at Anniston, for this project, are the completed blends from mix tanks and solids from the flakers. At WGK, finished products, are the liquid Aroclors and Montars. A list of products follows:
Product Code
Anniston
Date
Product Code WGK
Date
Product
82611 82612 82612 81102 82641 82613 82613 82614 82614 82615
--
--
82622 82621 82620 82619 82618 82616 82601 82649 82658 82681 82659 82661 82685 82664
10/28/63 6/17/66 7/15/64 1/10/64 7/15/64 6/28/65 7/15/64 5/25/66 6/15/64 3/2/66 7/15/64 7/15/64 3/11/66 3/15/66 3/11/66 3/11/66 3/11/66 3/11/66 7/8/65 4/18/66 4/18/66 5/3/67 3/11/66 3/15/66 3/9/66 4/17/58
8115 81101 81101 81102 81102 81103 81103 81105 81105 81107 82868 82868
4/7/64
6/17/66 7/15/64 1/10/64 7/15/64 6/28/65 7/15/64 5/25/66 6/15/64 3/2/66 7/15/64 7/15/64
Aroclor 1232 Aroclor 1242 Electrical Grade Aroclor 1242 Non-Electrical Grade Aroclor 1248 Electrical Grade Aroclor 1248 Non-Electrical Grade Aroclor 1254 Electrical Grade Aroclor 1254 Non-Electrical Grade Aroclor 1260 Electrical Grade Aroclor 1260 Non-Electrical Grade Aroclor 1262 Non-Electrical Grade Montars 1, 2 Montars 314 Aroclor 5460 Aroclor 5442 Aroclor 5060 Aroclor 4465 Aroclor 2565 Aroclor 1268 Biphenyl Inerteen PPO A13B3B Inerteen 54201 KA Aroclor 1260 - 10% Toluene Aroclor 1262 - 10% Toluene Therminol FRO Aroclor 1254 - 10% Toluene
1.333 Packaging and Shipping
Liquid Aroclors
At both Anniston and WGK, liquid Aroclors are shipped in the following manner:
Tank Trucks
Size - 4,000 gallon
Materials of Construction - All electrical grade Aroclors are loaded into SS trailers. Non-electrical grade Aroclors may be shipped in steel trailer tanks.
03<.6006
TOWOLDMONOQ44317
CEA 1430 & 1800 Date: August 28, 1967 Page 7
Tank Cars
Size - 4,000 or 8,000 gallon
Materials of Construction - All electrical grade Aroclors are loaded into solid aluminum cars or in tin, zinc or aluminum spray-lined cars. Non-electrical grade Aroclors may be shipped in steel cars.
Drums and Cars
Size - 5, 30 or 55 gallon
Materials of Construction - Lacquer-lined containers.
Solid Aroclors
At Anniston, solid Aroclors are packaged in 5 and 40 gallon galvanized steel drums as a solid and in 41 gallon fibre drums as flakes. Biphenyl and Aroclor 5460 are packaged in bags as follows (major part of the production):
Bags
Aroclor 5460 Net weight - 100 lbs., St. Regis No. PCBG-32A. Size - 18" X 6" X 34" with a 5" valve. Type - Sewn Valve (SV).
Biphenyl Net weight - 50 lbs., St. Regis No. PCBG-145A. Size - 16-3/4" X 5" X 33" with 5-1/2" valve.
Type - Sewn Valve (SV).
HB-40
At Anniston, HB-40 is packaged in 5 and 55 gallon steel drums.
1.34 Waste Streams
'
WGK
1,250 lbs./day of HC1 gas absorbed in a 50 GPM water stream (0.21%) will be discharged from the continuous blow tank into the plant sewer. Other process losses are of a minor nature.
0346006
TOWOLDMONOQ44318
1.35
CEA 1430 & 1800 Date: August 28, 1967 Page 8
Anniston
No change is expected in waste discharges as a result of this project. A dust collector will be installed to control Aroclor dusts from the milling operation of Aroclor 1268.
Personnel, Property and Public Hazards
Chlorine Gas
Causes eye, skin and mucous membrane irritation. In strong concentrations canister gas masks, Scott Air Paks, or oxygen breathing apparatus are required.
Biphenyl
Solid at normal temperatures. Fumes are toxic over a prolonged period of exposure. The flash point is 235 F.
HCl Gas
Fumes are very toxic and hazardous to teeth, skin, eyes and mucous membranes. In strong concentrations, rubber protective equipment and approved pack or cannister gas masks are required.
Ferric Chloride
Solid at normal temperatures. Material is not toxic but presents an eye hazard.
Xylene
Fumes are very toxic. Limiting explosion concentra tion is 1.27 to 7.0% by volume in air. The flash point is 40F.
Trichlorobenzene
Solid at normal temperatures. Fumes are medium toxic. Fire point is above 210 F.
Crude Aroclors
During processing,Aroclors are generally hot, 100 C
or above, and can cause serious thermal burns. Con
tinuous or repeated skin contact must be avoided.
Vapors at room temperatures should not be breathed
in a confined space. At elevated temperatures,
fumes are quite toxic. Continuous or repeated skin
contact with Aroclor must be avoided by the use of
gloves and protective garments.
'
03A6007
TOWOLDMONOQ44319
CEA 1430 & 1800 Date: August 28, 1967 Page 9
1.4 MANUFACTURING FACILITIES
1.41 Description
1.411 General
The following information is included in the Appendix of this report:
Equipment Flow Sheets Suggested Equipment Layout Equipment Lists Scopes of Work Preliminary Schedule Project Loss Prevention Report
1.412 For Anniston
New storage and blending tanks to be added:
Aroclor 1242 It 1248 II 1254 II 1260 II 1262 II 1221/1232
Inerteen PPO and
A13B
TCB
TTCB
54,000 gallon
18,000
1
54,000
II
18,000
II
18,000
II
18,000
II
30,000 12,000 12,000
II II II
(2 - 27,000 gallon) (2 - 27,000 gallon)
(1 - 12,000 gallon) (1 - 18,000 gallon)
An existing 2,000 gallon mixing tank will be relocated.
One covered loading dock for tank cars.
One covered loading dock for tank cars and trailers.
A new railroad spur.
Four existing 12,000 gallon storage tanks with submerged pumps will be dismantled and scrapped.
New drumming facilities to be added include a high speed drumming scale and a conveyor system to bring empty drums to the scale and take filled drums away from the scale.
New flaking and bagging facilities to be added:
Storage for Aroclor 5460, 1268 and biphenyl .
Flaker for solid Aroclors
'
0346008
TOWOLDMONOQ44320
CEA 1430 & 1800 Date: August 28, 1967 Page 10
Flaker for biphenyl
Mill for Aroclor 1268
High speed bagging machines for Aroclor 5460 flakes and biphenyl flakes
Conveyor system to take filled bags away from bagging machines
Fume control system for Aroclor 1268
The existing Aroclor and biphenyl flakers will be dismantled together with the present Aroclor feed tank.
A suitable building (120' X 60') to house the drumming and flaking operations.
Pipelines from Department 27 to tank farm as follows:
One line for Aroclor 1242 from existing 12,000 gallon day tank
One line for Aroclor 1248 and 1221
One line for Aroclor 1254 from existing 12,000 gallon day tank
One line for Aroclor 1260
One line for Aroclor 1262
Pipelines from tank farm to mix tanks:
One line for Aroclor 1242
One line for Aroclor 1254
One line for Aroclor 1260
One line for Aroclor 1248 and 1262
Pipelines from tank farm to loading spots and drum filling:
One line for A13B One line for KA and PPO
One line for Xylene and Toluene blends (drum filling only)
0346009
TOWOLDMONOQ44321
CEA 1430 & 1800 Date: August 28, 1967 Page 11
One line for HB-40 (drum filling only)
One line for Aroclor 1242
One line for Aroclor 1254
One line for Aroclor 1221, 1232, 1248, 1262
One line for Aroclor1260
Pumps will be providedas follows:
One for Aroclor 1242 transfer at tank farm
One for Aroclor 1254 transfer at tank farm
. One for Aroclor 1248/1221, 1232/1262 trans fer at tank farm
One for Aroclor 1260 transfer at tank farm
One for Mix tank and PPO tank transfer
One for Xylene Mix tank transfer
One for TCB, TTCB tank car unloading
One for TCB, TTCB transfer to Mix tank
Three to transfer Aroclors from Building 27 to storage
1.413 For W. G. Krummrich
New storage tanks to be added:
Aroclor 1242 Aroclor 1248 Aroclor 1254 Aroclor 1260 Biphenyl
44,000 gallon (2 - 22,000 gallon) 22,000 gallon 22,000 gallon 22,000 gallon 100,000 gallon
A new railroad spur
Two unloading docks for biphenyl cars
Three existing 15,000 gallon storage tanks with submerged pumps will be dismantled.
Pipelines from day tanks to tank farm as follows:
0346010
TOWOLDMON0044322
CEA 1430 & 1800 Date: August 28, 1967 Page 12
One line for Aroclor 1242
One line for Aroclor 1248
One line for Aroclor 1254
One line for Aroclor 1260
Pipelines from tank farm to loading spots and drum filling:
One line for Aroclor 1242
One line for Aroclor 1248
One line for Aroclor 1254
One line for Aroclor 1260
Pumps will be added as follows:
One for Aroclor 1248 transfer
One for Aroclor 1254 transfer
One for Aroclor 1260 transfer
One for Aroclor 1242 transfer
Facilities to produce 40M lbs./year of Aroclor 1242:
A continuous chlorinator chain consisting of biphenyl mix and continuous feed tank, four chlorination tanks, four mass circulating pumps and four external air coolers.
A continuous blow tank and intermediate storage tank.
Two semi-continuous distillation systems consisting of still pot, external circulat ing system with therminol heating, entrain ment separator, vapor condenser, receiver and vacuum steam ejector.
Two continuous porocel treatment systems consisting of feed tank, absorber, cleanup filter and product receivers. One train will have two absorbers to provide flexi bility .
0346011
TOWOLDMONOQ44323
1.42
. CEA 1430 & 1800 Date: August 28, 1967 Page 13
A complete therminol heating, storage and circulating system.
Additions to the existing control room to provide space for a foreman and motor con trol center.
Design Capacity
1.421 Anniston
Finished Product Storag e
Recommended ^ Provided
Product
(gal.)
(gal.)
Future Need (gal.) (1970)
1221 1232 1242 1248 1254 1260 1262
TOTAL
13,050-1 14,000J 97,500 20,800 51,500 20,900
5,550
223,300
18,000
66,000(2)
18,000 66,000 18,000 18,000
'
204,000
27,000 27,000
Increased flexibility in the storage area will allow a apacity increase of 5.7M lbs./year (from 48M to 53.7M).
Estimated tank car shipments for 1971: Estimated tank trailer shipments for 1971: Estimated drum shipments for 1971: Estimated can shipments for 1971:
372. 66
25,610 2, 030
(3) (3) (3) (3)
(1) Letter from HJD to RSY 5/18/67. (2) Includes 12,000 gallon of day storage. (3) Anniston Job No. 370-720 (1) by R. H. Taylor
Mixing and Drumming Area
A new 12,000 gallon mix tank, a relocated 2,000 gallon mix tank and an 18,000 gallon mix tank to provide for:
Estimated tank car shipments for 1971: Estimated tank truck shipments for 1971: Estimated drum shipments for 1971: Estimated can shipments for 1971:
55
1 5,764 1,312
(3)
(3) (3) (3)
A new drumming station with associated conveyors to handle 150 drums/day. (Basis: 8 hrs./day, 260 days/year, 75% OST)
0346012
TOWOLDMONOQ44324
CEA 1430 & 1800 Date: August 28, 1967 Page 14
Flaking and Bagging
Aroclor flaking capacity (Aroclor 5460) 41,500 lbs./day (Basis: 8 hrs./day, 365 days/year, 75% OST)
Aroclor bagging capacity
2 bags/min.
Biphenyl flaking capacity 18,300 lbs./day (Basis: 8 hrs./day, 365 days/year, 75% OST)
Biphenyl bagging capacity 2 bags/min.
Flaking and bagging design will allow these operations to be carried out on a one-shift basis, seven days a week. Exception is Aroclor 1268 which will be flaked and packaged on a three-shift basis, seven days a week (3% of production).
Raw Material Storage
Raw Material
Provided (gal.)
TTCB TCB
12,000 12,000
1.422 WGK
Finished Product Storage
Recommended
Product
(gal.)
1242 1248 1254 1260
TOTAL
132,000 25,200 34,400 20,200
211,800
Provided Future Need
(gal.)
(gal.) (1970)
84,000 ^ j 42,OOO 3 42,000 ' 22,000
190,000
66,000 66,000
Estimated tank car shipments for 1971: Estimated tank trailer shipments for 1971: Estimated drum shipments for 1971: Estimated can shipments for 1971:
112 306 12, 200 765
(1) Letter from HJD to RSY 5/18/67. (2) Includes 40M gallons on hand storage (3) Includes 20M gallons on hand storage.
Extra storage required for operating
flexibility. (4) Include 20M gallons on hand storage.
03<,bOV3
TOWOLDMONOQ44325
CEA 1430 & 1800 Date: August 28, 1967 Page 15
Raw Material Storage
Raw Material Biphenyl
Provided (gal.) 125,000(5)
(5) Includes 25M gallons on hand storage.
Provides capacity for 4 - 20,000 gallon cars and six days' supply at increased rate.
New unloading track and docks provide four days turnaround time at increased rate.
New Manufacturing Facilities
Continuous chlorination:
Basis: OST; Rate:
Producing Aroclor 1142 7,950 hrs./year 43M lbs./year
Semicontinuous distillation and earth treatment:
Basis: OST: Rate:
Producing Aroclor 1242 7,^50 hrs./year 40M lbs./year
For the overall product group, after these additions are completed, Anniston and WGK plant capacity will be as follows, H lbs./ year:
Present Capacity
New Capacity
Increase in Capacity
Anniston WGK
48.0 29.5
TOTAL CAPACITY 77.5
53.7 69.5
123.2
5.7 40.0
45.7
Based on 1971 requirements for both plants
(July 1967 Sales Forecast), excess capacity at that time will be:
New Capacity Required in 1971
Excess Capacity
123.2M lbs./year 99.2M lbs./year
24.0M lbs./year
Excess Capacity
24.2%
0346014
TOWOLDMONOQ44326
CEA 1430 & 1800 Date: August 28, 1967 Page 16
1.43 Flexibility Requirements
1,431 Anniston
Increased storage capacity and blending facilities
will allow for better utilization of present still
capacity. This will be accomplished by longer runs
on the same product and result in increased pro
duction capacity.
`
1.432 WGK
Based on the sales forecast of July 1967 for the Aroclor product group, batch units will produce Aroclors 1248, 1254 and 1260. The maximum capacity of these units is as follows for each Aroclor:
Aroclor 1248
8,750 hrs. X 7,200 lb./ba. X 5 chlor X 92% OST = 34.4 M lbs. 8.5 hrs.7ba.
Aroclor 1254
8,750 hrs. X 8,040 lb./ba. X 5 chlor X 92% OST = 30.8 M lbs. 10.5 hrs./ba.
Aroclor 1260
8,750 hrs. X 9,100 lb./ba. X 5 chlor X 92% OST = 29.2 M lbs. 12.5 hrs./ba.
For the year 1971, the maximum batch capacity will be: For Aroclor 1248: 34.4 M lbs. X 21%(1'= 7.25 M lbs..
For Aroclor 1254: 30.8 M lbs. X 35%^1)= 10.80 M lbs.
For Aroclor 1260: 29.2 M lbs. X 43%^L)= 12.60 M lbs.
Total Batch Capacity on this basis
= 30.65 M lbs.
(1) From the July 1967 Sales Forecast for 1971.
0346015
TOWOLDMONOQ44327
1.44
. CEA 1430 & 1800 Date; August 28, 1967 Page 17
Requirements for 1971 are 20.3M lbs., leaving an excess capacity of 51% at WGK.
For 1971, the continuous system capacity utili zation will be 25.6M lbs., leaving an excess capacity of 56% at WGK.
Flexibility will be designed into the WGK dis tillation systems to allow for the following operations:
Still No. 1 (existing) Aroclor 1260, 1262
Still No. 2 (existing) Boil down still to separate Montars (residues) from all products, Aroclors 1242, 1248, 1254, 1260 and 1262.
Still No. 3 (New)
Aroclor 1242 or 1254
Still No. 4 (New)
Aroclor 1242 or 1254
Future Expansion
1.441 Anniston
At the completion of this expansion, space will be available to the north of Building 27 for the addition of a complete new solid Aroclor line. Space is avail able in the tank farm area for additional tankage.
Flaking and drumming capacity can be increased by adding additional personnel and operating on a 2 or 3 shift basis.
1.442 WGK
One of the objectives of this expansion is to provide 25-30% excess production capacity for Aroclors. As we use up the excess capacity provided in this project we must consider the next step in department expansion. If we assume the product split will increase propor tionally according to the latest sales forecasts,we can postulate an operation diagrammed as follows:
03A6016
TOWOLDMONOQ44328
CEA 1430 & 1800 Date: August 28, 1967 Page 18
1.45
The layout of the new chlorination-distillation facili ties at WGK will allow space for the addition of another chlorination unit, intermediate storage tanks and two additional distillation chains. Aroclor 1248 and 1262, because of the smaller requirements, would continue to be made in the batch units.
On this basis, we can postulate a^ productive capacity as follows for liquid Aroclors, M lbs./year:
Anniston WGK batch units
Cont. 1242 unit Cont. 1254 unit Cont. 1260 unit
53.7 29.5 40.0 15.0 15.0
TOTAL CAPACITY
153.2
Physical Appearance
1.451 Anniston
Tanks of different heights will be grouped together to provide standardization.
In the flaking and drumming area, provision will be made for moving finished products directly into a new warehouse facility (when built).
03'i6017
TOWOLDMONOQ44329
1.46
. CEA 1430 & 1800 Date: August 28, 1967 Page 19
1.452 WGK
Tanks will be grouped together as an exten sion of the present tank farm.
The new facilities will be a separate structure to the south of the existing unit.
Storage and Shipping Requirements
1.461 Anniston
Facilities provided are noted in greater detail in other parts of this report. Provision is being made for:
Raw material storage of TTCB and TCB.
Finished product storage for all liquid Aroclors.
Loading docks for tank car and tank trailer loading of products.
Moving filled bags of solid Aroclors and biphenyl to palette loading station, then to warehouse storage.
Moving drums and cans to palette loading station, then to warehouse storage.
Storage in the drumming area of the new manufacturing facility for empty drums and containers.
1.462 WGK
Provision is being made for:
Raw material storage of biphenyl.
Finished product storage for all liquid Aroclors.
Unloading docks for tank cars.
Making an existing unloading dock a loading dock for tank cars of Aroclors. No extensions or additions are being made to the present blending and drumming facilities. WGK technical service is modifying an existing storage tank to a blend tank and revamping piping in the drumming area.
0346016
TOWOLDMONOQ44330
5 1.51
CEA 1430 & 1800
Date: August 28, 1967 Page 20
UTILITIES AND SERVICES
Utility and Service Requirements
1.511 Anniston Additions / Steam - 100 psiq-For Storage Tanks
2,000 lbs./hr
-For Process
500 lbs./hr
y Purchased Water- For Process (Cleanup) 150 GPM
V Compressed Air - For Storage Tanks
y Plant Water
- For Process (Flakers)
y Nitrogen
- For Storage Tanks
20 GPM 300 GPM
50 SCFM
Electric
- Connected
300 HP
- Operating
200 HP
1.512 WGK Additions
Steam - 80 psiq - For Storage Tanks
5,000 lbs./hr
- For Process
3,000 lbs./hr
200 psig-For Process
Natural Gas
- For Process
600 lbs./hr 1,800 SCFH
Purchased Water- For Process
150 GPM
Compressed Air - For Process
100 SCFM
Electric
- For Instruments - Connected - Operating
75 SCFM 315 HP 250 HP
Plant Water
- None Required
Nitroqen
- None Required
Utility and Service Facilities
1.521 Anniston
A new spur track from main track at north of plant to 5th Street, 1700 ft. long.
0346019
TOWOLDMON004433T
CEA 1430 & 1800 ' Date: August 28, 1967
Page 21
A new 300 KVA pole line transformer to supply tank farm and warehouse requirements.
A new sewerage lift station to replace existing field which is in the proposed manufacturing area. The lift station will tie into an exist ing city sewerage line.
Relocating a 24" IPS VC acid sewer.
Installation of a steel frame prefab-type building, 120' long X 60' wide to house the flaking, drumming and bagging facilities. This building will be designed so that it can be attached to a new warehouse building which will be 120' wide X 240' long.
A 15' wide X 80' long tank truck loading sta tion.
Relocation of existing plant parking facilities 70' wide X 120' long.
1.522 WGK
Extension of existing track 10A for 110 feet
and installation of a turnover to tie existing
track 10A into track 10.
'
Replace existing gas meter with a larger capa city meter.
Install new pump at department city water break tank with associated piping.
Install new 600 amp breaker in Sub #17. Install fans in Sub #17 transformer. Transfer feeder 8-1 from Sub #8 to Sub #17. Install an overhead feeder from Sub #17 to Building CF. Install feeder cables from breaker 8-1 to Department 246.
0346020
TOWOLDMONOQ44332