Document ZneDDzeVd7XQ9aoLq37oZpRKV

INDUSTRIAL HYGIENE SURVEY OF THE Polychlorinated Biphenyl Production Operation Monsanto Industrial Chemicals Company Sauget, Illinois , SURVEY DATE July 21-22, 1976 SURVEY CONDUCTED BY Mark Jones Janson Becker REPORT WRITTEN BY Mark Jones DATE OF REPORT Industrial Hygiene Section Industrywide Studies Branch Division of Surveillance, Hazard Evaluations and Field Studies National Institute for Occupational Safety and Health Cincinnati, Ohio MOMS 052306 INTRODUCTION Kocent literature hns linked polyehLorlmitod biphotiyLs with possible carcinogenic effects. Because this literature is incomplete, the Division of Surveillance, Hazard Evaluations and Field Studies of the National Institute for Occupational Safety and Health has underway an ''industrywide" study of industries using polychlorinated biphenyls. Since Monsanto is the sole producer of polychlorinated biphenyls in the United States, an Industrial hygiene survey was conducted at their PCBs production area In Saugat, Illinois, on July 21-22, 1976. This survey was conducted by Janson Becker and Mark Jones. During the visit, 18 air samples were collected for evaluation of polychlorinated biphenyls exposure. In addition, samples were collected for exposure to iron silica and chlorine. DESCRIPTION OF THE FACILITY The polychlorinated biphenyls production operation Is one of many operations present at the Monsanto facility In Sauget, Illinois. Sulfuric acid, benzene, and benzene derivatives, rubber chemicals (antioxidants, etc.), activated chlorine and phosphorous products are other products produced at the facility. The facility began production of polychlorinated biphenyls around 1929. Production continued to grow until 1970 when Monsanto began restricting the sale of PCBs for use in closed systems. MONS 052303 The entire work force at the facility Is approximately 1300 persons, with ipproxim.itoty 83 5 these persons being luuirly employee;.;. Approximately 25 employees are involved with the production of PC!!s. The union representing this group is the International Chemical Workers, l.ocal #12. MEDICAL, INDUSTRIAL HYGIENE AND SAFETY PROGRAMS A dispensary is located at the plant. Nurses are present at the dispensary 24 hours a day and a physician is present during the day. All employees are required to take a pre-employment physical examination. Certain employees are then required to take periodic physical examinations. Industrial hygiene matters at the facility are handled by the Air Pollution Group. The six people,who are assigned to this groupwork in conjunction with the safety department. The only sampling that has been done for polychlorinated biphenyls is the discharge from the area is monitored twice a week and the collection of a few air samples (Appendix B). Four people work in the safety department. Safety meetings are held every month and safety information is provided to the different work areas through safety committees. Personal protection programs used at the plant Include safety shoes, safety glasses, hard hats, protective clothing and respirators (where needed). Corporate industrial hygienists also give support to Che industrial hygiene and safety programs. -2- HONS 052308 description of process Thrift products are made in the PCBs production area: Aroclor 101b, Aroclor 1262, and ArocLor 1254. Aroclor 1016 is used in capacitors and Aroclor 1242 and 1254 are used in transformers. The operation is outdoor and consists mainly of pipeline, reaction vessels, distillation columns and storage tanks. Even though the system is theoretically a closed system, samples are drawn off and leaks occur which give a potential for employee exposure. Biphenyl is brought to the facility by tank car and pumped to storage tanks. The chlorine used for the operation comes by pipeline from another part of the plant. The chlorine and biphenyl are piped into a chlorinator in the presence of an iron catalyst and allowed to react. There are two separate groups of chlorinators, one group for producing Aroclor 1254 and the other for Aroclor 1242. The product from the Aroclor 1254 chlorinators goes through a purifying operation which includes a still, receiving tank and filtering system. From this operation the polychlorinated biphenyls go to the appropriate storage tank. The product from the Aroclor 1242 chlorinators goes to an inter mediate storage tank and then either through a similar operation as the Aroclor 1254 or to a distillation column which separates the different polychlorinated biphenyl isomers for producing Aroclor 1016. From here it goes to the storage tanks. The mixing tanks are used to formulate the final product by the intro duction of the appropriate additives needed to give the polychlorinated -3HONS 052309 biphenyls the properties desired by the customer. To give the poly chlorinated biphenyls hotter elecLric.tL properties a small amount of dlatomaceous earth is added to tho blond tanks once a week and then filtered out. INSPECTION OF PLANT - Potential Health Hazards Potential health hazards observed during this survey were as follows: 1. Polychlorinated biphenyls exposure 2. Chlorine exposure 3. Free silica exposure Ventilation . Since the operation is outdoors there is very little ventilation. Local exhuast ventilation is used in two operations. The drumming operation is equipped with a hose which is placed near the opening of the 55 gallon drum while it is filled. Near the chlorinators Is a work station where employee# perform specific tests on samples drawn from the chlorinators. This work station has a hood over the area where the tests are performed. Housekeeping Housekeeping In the polychlorinated biphenyls production area was taken care of fairly well. The aisleways were kept clean and clear. HONS 052310