Document ZnO05j17J664G5nYZRkgopVbp

Office of The President Bend :We March 24, 1980 r Officers, Group Executives, Subsidiary Presidents, U\ir`//GGeeneral Managers, and Overseas Affiliates P. Fanny 'ject Elimination of Asbestos from Bendix Facilities and Product Designs The recent survey of asbestos usage showed asbestos materials present in several locations and in a variety of types of applications. This was true both in our facilities and in our product designs. This memorandum is intended to provide a corporate-wide guideline for the elimination of asbestos in our facilities and product designs. 1. Future Facilities and Product Designs a. From today fomard. jia_asbestos-containing material for process or facility use mav be purchased or installed in jendix plants. In the rare cases where no asbestos-tree alternate material is available, approval for purchase or installation must be obtained from Corporate Health and Safety prior to commitment. b. Effective immediately, any new product Hpg-ign chal1 gyring _the use of asbestos in the design. This applies to all pro ducts not released tor manufacture. If no asbestos-free alternate material can be used, approval for use must he obtained from the Corporate Health and Safety organization. 2. Existing Facilities and Products a. Planning for replacement of existing asbestos-containing materials must be done promptly and on a common-sense basisyv? We recommend a phased plan which recognizes tne harzardousness or safety of any material. Basically, the friable (soft, easily crumbled by hand) asbestos materials which can become air-borne are the more hazardous, while non-friable or sealedoff materials are safer. Phase I-Friable asbestos materials (such as sprayed-on insulation) should be planned for replacement by the end of calendar ypar loan. 2. Phase II-Non-friable or sealed-off asbestos materials may be included in the plan, or replacement mav be deferrecTuntil required tor functional reasons as Iona as people are protected from any exposure to the asbestos material. : ~ HWBUI0005308 Office of The President March 24, 1980 Page 2 3. In each case where replacement is deferred, the location must put in place a confrn1 prrroHnrp to assure no ex-__ posure~To anv person while the asbestos material remaTnT present or during removal. b. Planning for replacement of asbestos material in existing lesigns released for manufacture must begin promptly.A phase-out"pi an that recognizes the production life of a pro duct and the cost of replacement should be prepared so that decisions can be arrived at on a common sense basis. Separately, you will have received an asbestos control policy and pro cedure, dated March 12, 1980, which establishes broad policy and pro vides procedures for protection of our employees. The present guide line will ensure the removal of asbestos from our facilities and products on a timely, but practical basis. Plans to bring your operations in conformance to this guideline are to be siihmittpd. to-.] Armstrong. Corporate Director-Safety, Health and Securiti(7by May 16, 1980 aStK^re to be incorporated in your fiscal 1981 AnnualPmacmial Plane;. WPP:eo HWBUI0005309