Document ZnMznE71XRYRY8Z0M379pdBXZ

ITER-OFFICE MEMORANDUN ' TO #T See Distribution COPIES TO See Below date December 17, 1968 . FROM j/,&. J(?\ 0. A, Finsand Construction at Kaiser, Middletown job no. 7100 SUBJECT Kaiser Engineers* Weekly Field Activity Report Transmitted herewith is the subject report for the week ending December 17, 1968 0AF:VRC:mcm Distribution:1 Armco D, C. Osborne C. G. Kramer T. R. Foley J. M. Thomas P. R. Smith D. D. Cox J. S. Lotz R. L. Brannaman A. M. Greco cc: Central File Kaiser Reading File Armco Reading File Kaiser / J. Wolf, Oakland /w. F. Bort, Oakland D. A. Daly S. G. Imherr V. L. Frankson H, C-. Boucher C. H. Swain C. M. Mandell KEN 004080 r # KAISER ENGINEERS, INC. WEEKLY FIELD ACTIVITY REPORT Week Ending December 17, 1968 WEATHER: Cold with light snow TEMPERATURE: 12 degrees minimum h8 degrees maximum CLIENT: Armco Steel Corporation LOCATION: -Middletown, Ohio JOB NUMBER: 6471 JOB VISITORS None SUMMARY FORCE REPORT Kaiser Engineers Exempt Non-Exempt Subcontractors FEC Total Management General Supervision Yield Engineering Warehouse and Material Control Survey Office Services and Repro. Clerical Craft* 4 9 34 3 1 1 -- TOTAL 52 3 10 5 14 4 Z4L 782 18 16 2 27 8 6 58 2 10 2 17 5 9 1 10 as 276 iML 680 288 1,802 ^Average for week of men on payroll. Average- for week of Crafts is as follows: Kaiser Engineers, Inc. Subcontractors Foothill Electric Corporation 711 626 265 Total Crafts Working 1,602 m KEN 004081 -3- WEEKLY FIELD ACTIVITY REPORT *t Week ending December 17, 1968 PROJECT PROGRESS 1. -73it8 - HOT STRIP KELL Project completed and in operation.' 2. 71^6 - SLAB MILL Project completed and in operation. 3. 71U3 - SOAKING PITS Project completed and in operation. U. *7128 - BASIC OXYGEN FACILITY . ii.l Excavation and Backfill: Backfill amounting to 688 cubic yards was placed this period for a total to date of 2-89,985 cubic yards. This fillwork was mainly surrounding the pumphouse and fill in the kitchen floor area for slabs on grade. 1|.2 Concrete: Concrete amounting to 19U cubic yards was placed for a total of 32,li}5 cubic yards. This concrete consisted mainly of the remaining section of slab on the operating floor, the baghouse elevated floor slab, grade beams between column 026 and 02$ on "Dn Line, and one section of kitchen floor slab. It.3 Structural and .Miscellaneous Steel: Ohio Valley Riggers main tained an average work force of 72 men" on structural steel erection. Five tons of steel was erected this period. Progress was continued on welding of the crane rails in the scrap aisle. Welding of checker plates and installation of crane access plat forms together with handrail was also in progress in the scrap -- aisle area. Structural steel boltup "was essentially complete in the west portion of the building which essentially completes boltup in general, thus remaining siding requirements can be . completed without delay. Baffle plates are being installed in the slag pit area and installation of heat shields is continuing at furnace #1. l+.U Roofing and Siding: Siding amounting to 12,331 square feet was installed for a total to date of 231,331 square feet. Siding progress for- this period consisted of. completing the north wall main elevation of the teeming aisle. Siding at the lower elev- ation platform areas is also in progress. 2,512 square feet of roofing was installed for a total to date of 216,301 square feet. Roofing work this period was related mainly to the electrical con trol- room, the stopper rod ovens, the grease storage building, the scale house, and the maintenance- office. Some progress was also related to erection of the remaining ridge ventilators and completion of sheeting of the high bay monitor ventilators. KEN 004082 # '>m:mr -h- WEEKLY FIELD ACTIVITY REPORT Week ending December 17, 1968 It.6 Mechanical: Furnco Corporation completed the installation of the last section of the main ventilator stack above the BOF Building. Progress is continuing on the horizontal ductwork ,between the ID fans and the quencher tanks. In the clarifier area, installation of mechanical equipment is continuing in the clarifier buildine. The Marley" Company continued with cooling tower erection this period. The Filter Building structural steel is now being painted in preparation for roofing and siding which is also in progress. Hunter Corporation maintained'an average work force of lt.0 men on OG piping in the clarifier tunnels, cooling water supply and return lines between the furnace area and the pumphouse, the 18 inch nitrogen header piping.between the nitrogen sphere and the main building and .6 inch through 12 inch cooling water piping at the furnace #1 hood. Honeywell, Inc., are now installing transmitter racks 'on the operating floor and service floor areas. U*7 Piping: Piping by Kaiser forces amounted to 1,682 linear feet for a total of i|7,26l linear feet. Major systems worked on were plant air, natural gas, oxygen, steam, well water, and raw river water. An average work force of 89 men was maintained on piping work. U.8 Electrical: Electrical progress for the period was as follows: .15j100 lbs of exposed conduit installed for a total to date of 218,638 lbs, or 70% complete; 3,965 feet of low voltage cable was installed for a total of 33,U65 feet, or \7% complete. 92 feet of crane feeder bus was installed for a total of 905 feet, or complete. 792 lbs of lighting conduit together with . 11,190 feet of wire and 88 fixtures were installed. Grounding amounting to I4O6 lbs was installed for a total of lU,7U9 lbs, or 7k% complete. An average work force of 153 men was maintained throughout this period. Installation of major equipment together --- with cable trays was continued in the main control room. Sheeting of electrical equipment was also in progress in the pumphouse and Filter Building areas. li.9 . Miscellaneous Subcontractors: Kirk and Blum Manufacturing Company essentially completed boltup of the baghouse structure in the bin .loading area* Ductwork from this structure to the pick up areas was .also installed. This facility is* now 70% complete. In the Kish collection area, erection of mechanical.equipment was resumed by Columbus Heating and Ventilating on December 17, 1968. Refractory laydown brick was installed at all teeming aisle plat forms. By the close of this period, most of the flat deck areas were essentially complete. In the furnace area, FBS Builders continued with brick lining of the main furnace foundations at both- units. KEN 004083 l>--ll.'Jijll IgU-T." -- WEEKLY FIELD ACTIVITY REPORT Week ending December 17, 1968 -Little progress was evident at th^ lab and office building this period, however, pnuematic tube terminal stations were being installed and. mechanical equipment permanently located in the lab room. Permanent heating for the building will not be avail able until the steamline insulation is completed. This is expected by early January, 1969. $. 7156 - 7159 PICKLE LIMES Concrete: "Concrete work this period consisted of the- top lift on #5 tension reel foundation, floor slabs at the delivery end of the Pickle Building, floor slabs in the Pickled Coil Storage Building, and the west wall grade beam. Concrete in the amount of 107 cubic yards was placed at Pickle Line #1; for a total of 16,923 cubic yards. At Pickle Line #5, 270 cubic yards of con crete was placed for a total of 13,189 cubic yards, McGraw . Construction Company's work force has been reduced to an average of 80 men on concrete work. 5.6 Mechanical: Ohio Valley Riggers maintained an average work force of 5>8 men on Pickle Line mechanical work. Work activities this period consisted mainly of setting and grouting of equip ment and motors on #5 Pickle Line. Grouting was accomplished on payoff mandrel" motors and blocker roll motors together with #U and #5 pinch rolls and drive motors. #k bridle was placed on'its foundation. Wet loop pit side guide installation con tinued and side plate installation was started on the #5 pit walls. 5.7 Piping: Delta Pipeline Contractors maintained an average work force of 56 men on Pickle Line piping this period. Piping in the amount of 655 linear feet was installed for a total of 3U,785 linear feet. Major systems worked on this period in cluded plant air, natural gas, steam, and hydraulics. Hydro static testing of the k Line entry hydraulic piping began ' on December 16* Hydraulic piping at the #h, Line welder was also started together with valve stands #3, #U, and #5 at the delivery section. Steam piping at the tanks on #U Line was also^in progress. 5.8 Electrical; Lake Erie Electric continued Pickle Line electrical installation with an average work force of 76 men. During the period the Sheffield representative was on the jobsite for supervision of corrective work at the Line X-Ray station. This work can now proceed to completion. Intercommunication wiring is now complete on the #U Line entry and- Pickle sections with work proceeding at the delivery area. Cable pulling and terminating was initiated between the #U Line delivery motor room and delivery end equipment. At #5- Line, 13.8 KV feeder cables were pulled into the transformer motor room. Aligning and connecting of electrical gear is in progress together with cable tray installation in the entry and delivery motor rooms. KEN 004084 a; s~\ -6- WEEKLY FIELD ACTIVITY REPORT Week ending December 17, 1968 5*9 Miscellaneous Subcontractors: McGraw Construction Company continued setting rails and platform supports together with conduit and pull boxes for the entry coil buggy system. Collector rail installation also started in this area. Baghouse construction by McGraw consisted of steam piping in baghouse "A", side panel and hopper-installation on.baghouse B" and ''C", and ductwork on baghouse "D". FBS Buiiders completed masonry work for the #5 entry motor room this period. Blockwork will continue in the delivery motor room next period. 6. 7160 - COLD MILL 6.1 Excavation and Backfill: Backfill, mainly at the Coil Distribution Building foundations, amounting to U,2U1 cubic yards was placed for a total of 107,330 cubic yards. 6.2 Concrete: Concrete amounting to 675 cubic yards was placed for a total of 18,098 cubic yards. Major concrete work this period consisted of oil cellar slab on grade, oil cellar column.piers and tank pads, entry conveyor foundations, the accumulator base . and various grade beams and walls. .6.3 Structural and Miscellaneous Steel: Structural steel erection resumed this period with 257 tons' being erected for a total of 1,252 tons. Major erection consisted of columns from column #21 to #27 on both nK" and "Ln Lines. All building columns have now been raised with elevation steel currently in progress. Steel erection on this facility is generally ahead of schedule. 6.it .Roofing and Siding: Roofing application on the Gold Mill building was started on December 16, with 1,789 square feet being installed at the southeast comer. 6.6 Mechnicalr Ohio Valley Riggers continued with boltup of :Crane #1*08 .together with miscellaneous- ironwork (handrail, stairs, etc.) on cranes #ij.08 and #U09. 6.8 . Electrical: Foothill Electric maintained an average of 45 electricians on Cold Mill electrical work. 15,029 lbs of embedded conduit was installed for a total of liil,370 lbs, or 2h% complete. Grounding material amounting to ItlU lbs was installed for a total of 5,201* lbs, or 33$ complete. Embedded conduit installation was completed on MG set #2 and mill stands #1 and #2. This contractor started electrical installation on crane #1*08 together with .collector rail in. stallation and feeder conduit for the high bay lighting. KEN 004085 4 -7- WESKLY FIELD ACTIVITY REPORT Week ending December 17, 1968 7186 - 7182 WASTE DISPOSAL Concrete work this period in the Waste Disposal Area consisted of h3 cubic yards at the #2 aeration and flocculation tank walls. Piping.amounting to 770 linear feet,was installed for a total of 18,^21 linear feet. Major systems worked included spent pickle liquor to the tank farm and disposal wells, pickle rinse water to the pumps, and hydrochloric acid. Sections ofthe pickle rinse water and spent pickle liquor systems are now under hydro-test. Instrumentation piping was started this period-. Foothill Electric installed the following: 1,332 lbs of exposed conduit for a total'of 23,990 lbs, or 87$ complete j 300 feet of power and control wiring for a total of 31,300 feet, or U2$ completej 130 lbs of grounding material for a total of 2,771 l'os, or 39$ complete. Wire pulling to both disposal wells is now complete. Local control panel #30$ was received this week and is now being installed* At theclarifier area Char-Mac. completed the thickener equipment installation this week and has now left the jobsite. UTILITIES 7110 - Electrical Distribution: R. H. Bouligny, Inc., has resumed* work on the 13.b KV power distribution in the Cold Mill. 6 lines have been strung between towers #7 and #8. Line work to the Pickle Building tower and Cold Kill tower will proceed after installation of additional stiffener plates is complete on these towers. 7112 - Drainage and Site Development: Armrel Construction Company completed the one inch asphalt surface bourse on"the remaining steelmaking area roads this period. This work ns now awaiting final inspection. 7113 - Trackwork: DHS Corporation completed installation of two crossovers and 520 feet of track north of Lefferson Road. This contractor also completed installation of 9$0 feet of track at the pollution abatement area. ANNEALING Formwork continued on building foundations intermittently as manpower becomes available. Prepared by OAF:VRC:mcm ipproved' by 7^1G. L..Roberts Construction Manager KEN 004086