Document Zn8reJdEN7ZgwB1zvDde48xdJ

DownloadRandom document
Part A Response Part A - to be submitted within 24 hours of the incident Permit Number Name Of Operator Location Of Installation Time and date of the detection BU5453IY AGC Chemicals Europe Ltd Hillhouse International, Thornton Cleveleys, Lancashire 22/03/2023 (a) Notification requirements for any malfunction, breakdown or failure of equipment or techniques, accident or fugitive emission of a substance not controlled by an emission limit which has caused, is causing or may cause significant pollution To be notified within 24 hours of detection Date and time of event 17/02/2023 Reference or description of the location of the event Missed 24-hour effluent sample on 17/01/2023 from W1 Discharge to River Wyre. Description of where any release into the environment took place Inline pH and temperature monitoring and no abnormal operations so do not expect any abnormal results. Substance(s) potentially released n/a Best estimate of the quantity or rate n/a of release of substance(s) Measures taken, or intended to be n/a taken, to stop any emission Description of the failure or accident Power spike observed at the site on 17/02/2023 (electrical fault at a substation in Penwortham, Preston). Effluent samples have been obtained since this date with no abnormal results. Name* Post Signature Date 01/03/2023 *authorised to sign on behalf of AGC Chemicals Europe