Document Zn4qZEB65N3OYKmGZwawpOORZ

From Monsanto Chemical Company 1) cc Dr. B. L. Jenkins St. Louis At Anniston* Alabama Mr. J. L. Christian Or St. Louis Date September 9* 1955 (Dictated 9-4-55) T. K. OiiiiUr---------St. Louis Mr. H. F. Weaver - Reference Subject EIW-PGb/eEH* 6-26-55 INTERIM REPORT NO. 2892 St. Louis Dr. N. N. T. Samaras - Dayton Dr. R. E. Kelly - St. Louis Mr. A. M. EUeriburg Mr. H. B. Richards Mr. J. W. Carlson Mr. J. B. Trotter St. Louis Tour fine constructive comments concerning this interim report have been studied with great interest by Mr. EUenburg* Mr. Richards and myself. From your own participation in this experiment* you well realize the difficulty in obtaining reliable atmosphere blanks due to the nature of the operation and the vicinity of the scrubbing tower* which at times will permit small, amounts of RC1 and chlorine to escape into the Anniston at mosphere. To be fully valid* I believe that a large number of determina tions will have to be made sufficiently to permit statistical evaluation. As you know and as was discussed with you* we decided against this course of action when this work was undertaken. Concerning the reagent blank* we realize that in those measurements where small concentrations of chlorine were encountered in the atmosphere the reagent blank* by comparison* assumes a rather large value. However* all values that have been reported in the report were corrected for reagent blank. Ve agree with you that the values obtained* due to the presence of unknown amounts of chloride Ion in the atmosphere from other sources* can well be considered rwu-inmra rather than winlTmtm values. We shall look into improvement of the method* which might permit us to distinguish between Aroclor-chlorlne and chlorine from other sources* but believe that due to the small amounts present this might involve an effort out of proportion to the goal obtained. Any suggestions that you may have along these lines will be greatly appreciated. Attached you will find an addendum to the Interim report* which contains latest tabulated data on measurements since the issuance of this report. You will also find a table showing data obtained in a roam painted with styrene latex paint containing Aroclors. These tests are continuing. Edgar E. Hardy JT yrA DsW 550825 STLCOPCB4089242 TABLE I Plant Samples During Aroclor 3242 Operation C cncentratlan* nw./cu. m. Bun Position No. No. Cl" Aroclor Remarks 10 5 29 4 30 5. 31 6-6 0.14 1.5 1.5 2.2 0.33 " 3.6 > 3.6 5.3 ,, These tests previously reported in Report No. 2892. 45 1 46 2 47 3 0.85 0.54 0.85 2.0 " 0.80 2.0 > | | Aroclor 1242 In both stills and 1254 being drummed during these tests. Both filters cold. Note: Additional data are needed during 1242 operations. The position numbers In this table and In tables U and HI are as described in Report 2892. `/S'b DSW 550826 STLCOPCB4089243 TA33IZ H Plant Samples During Aroclar 1254 Operations Bun Position Concentration* mg./cu. m. Bo. Ho. Cl" Aroclor Remarks 25 5 27 5 32 6-S 55 6-H 54 5 55 4 56 4 57 5 58 5 59 10 40 7 42 6-n 45 8 44 8 0.41 0.50 1.45 1.04 0.75 0.51 0.57 1.50 1.98 0.40 0.75 2.4 4.5 1.5 0.76 0.92 2.68 1.95 1.59 0.94 0.68 2.40 5.66 0.80 1.46 4.5 8.0 2.4 These tests previously reported in Report Ho. 2892. Filtering 1254 @ 115C. Filtering 1254 @ 110C.> Sparkler filter. During 1254 distillation. After pumping 1254 from receiver to blending tank. At steam recorder. At operators' desk. Filtering 1254 @ 120C. Drumming 1254 @ 150#C. Note: The analytical procedure for sample 37-40 inclusive was carried out using one-half the regular sample size. DSW 550827 STLCOPCB4089244 TABLE HI Aroclar Yapars from Styrene Latex Paint Bun Date Bo. 7-53 Concentration* nvt./ctu m. Cl" Aroclar Eemarks 48 17 49 17 50 17 51 52 17 55 20 5^ 20 55 21 56 21 21 58 21 59 21 60 22 61 22 62 22 65 23 64 23 0.32 0.89 0 0.64 -- O.32 1.28 0.93 0.92 0.53 0.98 0.52 0.57 0.30 0.55 0.12 0.14 ---- --- ---- 0.67 2.68 1.9 1.9 1.1 2.0 1.1 1.2 0.62 1.1 0.25 0.29 These four samples vere Blanks In the room Before painting. Beagent Blank* 0.007 mg. Cl" Center East* 30 min. after painting. Center* 1.5 Brs. after painting. Center South Center B.E. comer Inside hood* 46 C. Intake In hood* 45*C. " 1 day after rpainting >' Inside hood* 50C. BJ5. corner Center B.E. corner Center Bote: Boob remained closed and unventilated during entire period. Aroclar odor present during entire period. STLCOPCB4089245