Document Zn4nBmg8pOQ5o5qe2mMyVXn5L
% UNITERM CC i '
eELANESE
CHEMICAL COMPANY. INC.
CHCMCCL RIANT
JJF-010-83 TJlK
January 20, 1983
CERTIFIED HAIL #5561501
Mr. Bill Stewart, P. E. Executive Director
Texas Air Control Board 6330 Highway 290 East Austin, Texas 78723
ft
Dear Mr*. Stewart:
The Celanese Chemical Company, Inc., plant at Bishop is planning to conduct a renovation on one of its power boilers. Boiler No. 11 needs replacing of the insulation- around the preheater. This renovation work will start February 4, 1983. Since the boiler is insulated with friable asbestos insulation, the insulation will be removed as the first step and landfilled in the designated asbestos landfill located on the plant site. All precautions outlined in 40 CFR 61.20 - 61.25 will be observed. All new insulation will be of the non-asbestos type.
This letter will serve as notification of this work, as required by 40 CFR 61.22 (d) (2). The attached data sheet lists all the pertinent data.
Please contact rae if you have any questions or comments.
i
L-
i*
I.
i (
Very truly yours.
JJF/rgs Attachment bcc: J. F. Harper
0. D. Siemonsma
w. H. Meyer J. Garza
J. Fritsch ant Manager
R. Pena, ABI R. K. Golemon, Austin
Central Files (2)
Ur\rU\r9\ 4a 1a 6r\
NOTIFICATION INFORMATION - RENOVATION
I. OWNER:
Celanese Chemical Company, Inc.
II. ADDRESS:
P. 0. Box 47320
1250 West Mockingbird Lane Dallas, Texas 74247
III. DESCRIPTION:
Remove friable asbestos insulation from boiler no. 11
preheater. This is approximately 600 sq. ft. of insulation.
IV. ADDRESS OF SITE:
Chemcel Plant Celanese Chemical Company, P. 0. Box 428 Bishop, Texas 78343
Inc.
V. STARTING AND ' COMPLETION DATE:
Start: February 4, 1983
End:
February 25, 1983
VI, NATURE OF RENOVATION:
See III above.
VII. PROCEDURE:
Wet insulation thoroughly, strip off insulation, packs in plastic bags and landfill in registered (on-site) landfill.
VIII. LANDFILL SITE:
Texas Department of Water Resources Registration No. 30084
r EPA ID. NO. TXD008113441
009417