Document Zn4BkXxRyZ2nQN8Zd82oG5jzV
MINUTES
of the
GOVERNMENT TECHNICAL & RESEARCH COMMITTEE MEETING
Land Session,
NATIONAL INSULATION MANUFACTURERS ASSOCIATION
Washington, D. C.
December 4, 1962
The meeting was called to order by Mr, K. M, Ritchie with the following in attendance:
K. M. Ritchie R, L, Schneider J. W. Cordrey J. F, Lynch R. L. Strickland V/, E, Miller J, M. Barnhart (
F. J. Powell R* E, Lyons E. L, Broggini A, L, Graul W, Y, Loux H, A. Borger J, S. King
Baldwin-Ehret-Hill, Inc, Owens-Corning Fiberglas Corp. Fibreboard Paper Products Co. Johns-Manville Sales Corp, Gustin-Bacon Mfg, Company Pittsburgh Corning Corp. NIMA
National Bureau of Standards General Services Administration Corps of Engineers Bureau of Yards, and Dec ks Public Buildings Service Building Research Advisory Board Veterans. Administration
SUBJECTS DISCUSSED
I* Economic Thickness - Present - Future
: 1* Discussed r,B" Factor admendments to provide more flexibility of cost,
2, Question - (F* Powell) is there any effort being made to simplify present book, by use of charts - to simplify use of graph informa-
. . tion,
3. (King) Govan has come up with table for Government installations, 4. (Graul) Reported BRAB had task group to evaluate NIMA*s
Economic Tjickness Table, Result - basically had a lot of merit have simplified using same formula and theory and are publishing
( 4 page document for Government use, 5, (Barnhart) Will forward information re: simplified method of using Economic Thickness Table to all at meeting.
2
II. Recommended Practices
1. (Loux) Considering-doing away with wire mesh to plaster on
exposed piping. Contractors prefer canvas.
2. (Loux) Requested industry advise these recommendations parti
cularly on cold side where aluminum vapor bassier is must.
3. (Graul) Two separate problems, should be treated as such;
(a) Cold side - vapor barrier is main concern
(b) Hot side - insulation is prime interest
4. (Loux Zc Graul) Treatment of Manholes - mechanical damage -
Yard Dock spec requires 18 guage aluminum jacket. GSA also
requiring aluminum jacket protection.
5. (Loux) Thermal Insulation internal (Duct)
6. (King) Are the duct liners (glass fiber) germ breeders?
7. (Brogginni) Reported - IT* S. Health report actually grew
microbes within filters,
8. (King) Fire resistant jackets and protection - what is practical,
what is economical.
9. (King) Should manufacturers advise against additional finishes
over Flame Retardant Jackets.
10. (Brogginni) Canvas Jackets - Will allow 3-1/2 oz. minimum.
Consensus was that a standardization of applicable weights and
their areas of application.
11. (Barnhart) That Committee (T Sc R) has this on next Agenda.
12. (King) Y/hy not use same retardant jacket on hot and cold?
Consensus - No particular problem, possible to seal both in
same manner*
13, (Strickland) What is feeling of Government towards manufactured
molded fittings?
(Graul) Helps a lot. Corps of Engineers, Air Force, Yards h
Docks are leaning toward molded fittings of same material.
Consensus - Factory molded fittirg of same- material.
14, (King) Why not a listing of manufacturers - finishes, fittings, etc,
.15, (Loux) What are recommendations regarding treatment of flexible
connections.
\
ADJOURNMENT
There being no further business, the meeting was adjourned.
Respectfully submitted
Y/. E. MILLER