Document ZgxYOmY4ZvgozGxnGmoJ6ZQd

A< (7) * 4- *c 2) (ghldLi.sJ&ZtJ^ ^ O r^" ,'i P U "n P| - " U ;._ [-_ '::.i INDUSTRIES d> PPG INDUSTRIE INC. ^ INDUSTRIAL CHEMICAL DIVISION P. 0. BOX 1000 February 28, 1972 LAKE CHARLES. LA. 70601 Ventcf P. 0. Pasaicnu/ Tc:;as 775^2 Attnr^Bobby L. Kale Reference: Inquiry 2-93^5 Demolition of Sodium Chlorate Plant Gentlemen.: Please quote a price and required, time to demolish, dismantle and stack pile PPC-'s Sodium Chlorate Plant equipment, not including the buildin.y structure. ITo drawinys are included at this tine. A job site inspection is needed to yet the Dull scope of this work. However, drawinys and engineering information Tfrf.ll be supplied later as needed. The contractor is to Burnish labor, incidental material and equipment to remove all process equipment, piping, electrical, instrumentation and supports as desiccated by PPG. These items arc to cepredated and neatly stacked in an area as desiccated by r?G. This stackiny area will be no Purthur than one-half mile from the Job cite. _ The contractor is to remove all the asbestos-cement and translucent p? astic panels from the reef and north wall of the plant buthairy. Those panels arc to be stacked -.rfth the other items. PPG will provide connections for water, plant air and electricity if Obese utilities are required for this work. The buildiny and concrete floor will be water-blasted and cleaned by T,T,G prior to the staid; of dismantling. PPG will flush all pipiry anI equipment prior to the start of this job. mTvh,e approximate staitany date is Hay 15, 1972. VOPlease rcoly ITC-g-InTSR -9r-AfI MVhG/7 10/ A* ------- t---- - PPG Contacts are Bob Be id and/or Eo'o hbiiaker. lc u< / Yours very truly, ,-4t / -V m u/.) J; n/t D3M:cf cc: B.Beiu/B.T'.itahcr File D. 3. Pattisa Purchasing Enyinccr | BB 0003565^j_