Document ZRrDQxxK50xR7wXzKn8KDdd

SUBJECT: INSTALLATION OF TEMPORARY PARALLEL CHLORIDE TREATER RFE No. 0436R006 Process Engineering has reviewed the recommendations made by Operations to use the old Unifiner reactor as a swing chloride treater in the(fcCRP The Unifiner reactor (DC-1201) is not ideal; however, it is rsSommended as a temporary chloride treater for use during loading of the existing chloride treater (FA-3913). A sketch of the piping revisions and the updated P&ID'S are attached. The Unifiner reactor (DC-1201) is designed for pressure of 650 PSIG, at a temperature of 700*F. The chloride treater operating conditions are 114 PSIG and 100*F. The reactor is 13.0 ft. tangent to tangent and has a diameter of 4.5 ft. It has an 18" manway, 10" outlet, and 4" dump nozzle. ~~ Modifications will have to be made to the existing piping and the Unifiner reactor prior to placing it in service as a chloride treater. Piping modifications are needed to accommodate spool pieces ("T" shaped) to tie the Unifiner reactor into the existing system. The inlet and outlet spool pieces will need to be equipped with 12" valves and blinds that will point east. The modifications are shown in the attached marked up P&ID. All piping flanges will be raised face with 125 Ra finish. Reactor mating flanges need to be RTJ's. The following modifications to the old Unifiner reactor will need to be made prior to being put into chloride treater service. 1. Remove the insulation (which may be asbestos) from the Unifiner reactor. 2. Clean and reuse existing inlet distributer for new treater service. 3. Fabricate a new outlet basket designed to fit a 10" outlet based on the existing treater's outlet . basket. Drawings are attached. 4 Fabricate a new dump sleeve designed to fit a 4" dump nozzle based on existing treater's dump nozzle. Drawings are attached. 5. Skid mount the Unifiner reactor north of -the existing chloride treater and analyzer shack. Operations and Process Engineering requests Refinery Engineering to expedite the work needed to modify the existing piping. In addition, they are requested to start looking at relocation and modification of the old Unifiner reactor for the CCR. Relief valve sizing and additional information will follow. RHR/nkj Attachments cc: BWB, JTC, REF, EWF, REM, CLP, DMW, CJW K010154 jiummii. m pa