ST. LOUISASBESTOS SURVEY NO. 27
Mr. S. J. Stempien CEED Files
Attached please find the results of an asbestos survey conducted on May 12 and 15, 1975 by CEED and plant personnel. This survey was conducted after cleaning the beater deck and insuring, that the existing dust collector was in optimum working order. The results of the survey are summarized below:
Sample Description Beaterman #1 (5/12) Beaterman #1 (5/15) Beater Reliefman (#1 (5/15)
Beaterman #1 (5/12) Beaterman #1 (5/15)
Time 243 240 243
15 15
Fibers/cc (TWA) 1.9 1.0 0.9 Fibers/cc (peak) 2.5 2.9
The above results indicate that the 2. 0 fiber/cc time weighted average ex posure limit, due for implementation in July, 1976, is achievable at the #1 Beater position with existing equipment properly maintained and cleaned.
However, it is suggested that more extensive use of the cleaning vacuum system be implemented so that fiber spills can be immediately cleaned up so as to reduce airborne asbestos from this source. A program to tape broken bags is also warranted. The implementation of these measures will help to maintain fiber levels under 2. 0 fibers/cc.
It will be necessary for plant personnel to secure a similar set of samples during the operation of the #7 Beater as this beater has a screw feeder at the beater opening which creates different exposure conditions.