PREPARED UNDER DIRECTION OF COUNSEL
TO: Jeff 2Xmn
DATE; 2/16/8 B
FROM: Dan Vornberg through Walter Novotny
SUBJ ; The Background of the OSHA Lead Standard and the Strategies of the Primary Lead Producers in Attempting to Comply with that Standard
In 1970 the Williams * Stoigtr Act known as the Occupational Safety and Health Act was passed. It created the National Institute of Occupational Safety and Health (NIOSH) for research and empowered the Secretary of Labor to administer portions of its provisions including the establishment of Health and Safety Standards initially by adopting consensus or government standards and later by detailed analysis. The responsibilities of the Labor Department have been carried out through the Assintant Secretary of Labor for the Occupational Safety and Health Administration (OSHA) within the Department of Labor,
The initial regulations were promulgated, thereafter, which included the American Conference of Governmental Hygienist's recommendations on acceptable air concentration* in the work place. For lead, this level was 200 micrograms per cubic meter, , Other standards applicable to lead were adopted on a general basis requiring various administrative controls but in a relatively nonspecific way.
In 1974, OSHA decided to inspect all of the primary lead operations in the United States by monitoring for air lead levels and issuing citations requiring engineering controls to reduce air lead levels to the 200 level, Also, administrative requirements were mandated such as tho restriction of smoking and eating in the work place. Herculaneum received citations at that time and developed a plan to install certain engineering controls.
As might be expected, it Vas impossible to install those controls in a
relatively short time and an extension was granted by OSHA under a
provision of the rules called "Petition for Modification.j&L Abatement Date
(PHA)," which modified the time to install equipment. These extensions
continued year after year, Sometimes, this occurred because of multi-year
projects, work stoppages at our own plant, or equipment delivery delays.
Other extensions occurred because the initial project was installed and
subsequent air monitoring indicated that the air level standards had not
been met and, consequently, other projects were then devised.
.
In 1975, OSHA decided to review and revise its lead program and to issue a "comprehensive load standard" which would package in one regulation all of the detailed engineering, respiratory and administrative procedures that thoy thought von appropriate,'* This culminated in a 1976
rule-making which became effective early the next year. The final
standard was more stringent than the originally proposed standard. It required a 50 air level, specifically designed chfingehousos and cafeterias, mandatory respiratory control where present engineering was not effective, company provided clothing, the removal of workers from the
FLUOR - 06628
TUE 13:05 ID:
DOE RUN
TEL NO:314D317160
693 P03
work place when tnedLcal monitoring shewed they exceeded a proscribed level lead, the protection of earnings while this medical removal was occurring, and numerous other very specific regulations, The medical removal level oho a a n was 50 micrograos per 100 grams of whole blood, much more stringent than the 80 level generally supported by industry. A number of facets of the standard were phased in with time including the blood lead removal levels and ton years was allowed, until 1989, to achieve the air lead standard through engineering controls (Because of ..court delays, this date later became 1991.)
The industry was shocked. A broad based legal challenge was mounted by the Lead Industries Association; but the courts finally rejected all of the arguments, end the lest appeal was exhausted in 1981,
In general, the affirmative actions of the industry, including both Buick and Herculaneum, were to move forward with changchouse and cafeteria construction projects, implement mandatory respirator Wear, lower medical removal levels, modify numerous other administrative programs and training programs, and continue to deal with engineering controls under the 1974 citation J?HA strategy. While it is difficult'to separate OSHA lead controls from community air lead controls and sometime# difficult to separata them from process improvements, each of Doe Run's facilities pent in the order of $10 million each since 1978 on capital improvements and increased costs significantly with training, monitoring, MRP removal costs, respirators, and numerous personnel to administrate, operate, and maintain new programs and equipment, (The Bureau of Mines has been working on an estimate of the total costs of these programs.)
Both St. Joe and Amax Lead of Missouri, in anticipation of strict enforcement of this unachievable-standard, stepped up efforts to identify a new generation of technology. St, Joe invested a million dollars in support of the Q$L research in Germany. Vhen effort# their seemed marginal, they spent about $12 M in developing a chemical process begun earlier by BOM which leached concentrate with Ferric Chloride, purified and crystallised out Lead chloride. The final tep was an electrolytic production of metal in a process step developed with ALCOA. Unfortunately, the process was far more expensive than anticipated due to the poor cell efficiency achieved. Other processes were also visited and studied. AMAX, likewise, made a review of these technologies and provided concentrates for a trial run in Finland of the Outokumpu Oy flash smelting and electric slag cleaning process. At that time none of the process*6 were determined to be either technologically or economically feasible. Both companies continued to monitor the progress on these processes.
With the inauguration of the Reagan Administration and the announcement that they would be moving on "Regulatory Reform," the lead industry sew an Opportunity to get review of what it envisioned as an impossible standard to achieve, certainly with regard to air levels and possibly with regards to blood lead goals. Since various industry segments within LI A had different needs, the various groups within th* industry diverged in regard to how to seek to take advantage of regulatory rofornu The primary lead industry brainstormed all possible options short of legislative relief including variances, extended settlement agreements in the contKf of enforcement actions, and new rule-making. A revised "integrated
FLUOR - 06629
FEB-lt.-'b3 Tt: 13*0-6 it';
0Ct KUN
iu ,Nu: Oi-rrrl TlbO
kd63 ruu
primary standard" was drafted end proposed by St, Joe. A meeting of principal, John Wright, Bob Hath, and Allen Booth, was set up in 1982 with Thorne Auchter, then Assistant Secretary of OSHA, to indicate the ssrlousnejj of the n*d for relief, On the day prior to the meeting, however, ASARCO announced that it had been meeting separately and Intended to execute a three way agreement, a "tripartite agreement" between OSHA, the union, and ASARCO as a method of managing what was expected under the Itftd standard. These agreements would be renewed every three years. St. Joe and AXAX felt these agreements raised serious lagal issues and would be subject to political whiplash since any of the three parties could withdraw. They could also become Integrally intertwined in the collective bargain process with time. St. Jo, At that time, was still hopeful that Bomething 'permanent1' could s(serge from the process that would survive changes in political administrations. Unfortunately, the current administration was learning about this time that the American press and th American voter were not sympathetic to "regulatory reform.*
After the defection of ASARCO, each company took its own counsel as to how to approach the problem. In May of 1983, St. Joe applied to 0SH<\ for a permanent variance with support of the local Teamsters 688. The variance sought three major forms of relief; (1) $10 million of additional projects were proposed over a 6-year period as an initial cap on engineering control expenditures, (2) that blood lead triggers would be ratcheted up or down to keep the impact of the number of MRP's at & fixed percentage of the work force, (3) that respirator protection factors would be adjusted to allow currently available respirators to continue to be used. We held endless meetings with policy and variance people in Washington over a several year period discussing the merit and legality of our approach and OSHA arguing the acceptability of tripartite. We had inspections of the plant and engineering control plans vr proposed. OGHA knew fruiu theix. own consultant's report (Charles Rivers Associates) that the standard was not achievable and had modified, as mandated by the
court, their position to state that only those controls economically and technically achievable were required. St. Joe contemplated forcing a
showdown on the permanent variance through the hearing and court process.
AMaX, in the meantime, had been able to reduce their blood leads even faster than the other primaries, partially due to work interruptions, partly due to a younger work force, and partly due to their cleanroom concept. At any rate, while the rest of the industry was still receiving variances, AKAX took the step to ratchet to the final BO blood lead standard, With this Step taken thus one of the potentially business threatening problems solved, they decided to abandon the concept of "permanent reliefn and apply for a 5-year FMA relying on the old 1974 citations. This relief was obtained in 1985, Interestingly, it may have been St Joe's dogged insistence on the permanent step that made OSHA accept AHAX'e rather clever proposal rather than hanging on for tripartite. This atep was taken successfully and following behind that a permanent raaplrator variance was requested, taking for a 10 fold increase in the allowable concentration for use of the standard half face negaciv pressure respirator. In the end, after a laborious interchange, OSHA gave them a 2.5 fold increase and a complicated set of conditions to go with it including a prohibition against further blood lead relief. This relief vaa not achieved until th spring of 1986,
FLUOR - 06630
FEB-16' 60 TUE 13:08 ID:
DOE RUN
TEl NO:3149317180
d93 P05
St. Jo, observing political realties and AHAX'b syccesa, also gave up the allusion of permanent relief and applied for a five year PMA, which was granted effective February, 1986, In December of 1986, the final ratcheting to the 50 blood lead standard was made, and application for e permanent respirator variance was filed, That variance ia still pending,
It was reasonable to believe at this point, early 1986, that OSHA had made its peace vith the Primary Lead Industry and ve would be allowed to coexist by continuing to improve our facilities within the structure of the five year PMA'a. ASA&CO, having arguably spoiled the possibility of permanent relief for the industry with their tripartite agreements, decided in lace 1986 that these were not the Eutopia' a that they originally envisioned. As they' began expiring, they had five of them, they decided not to renew than. As a result, a letter was sent out indicating that all of the ASARCO facilities should be given wall to wall Inspections to determine compliance with the lead standard, following the expiration of the agreements, While this has not been done in all cases, they have been initiated in the East Helena smelter and are about to close that inspection.
While it i6 too early to fully analyze the impact of the recent inspections at Herculaneum, it is not clear that the rules of the process have changed, OSHA has viaited the plant at least once a year over this deoade without any prior indication of deficiency in our program, or with the reliance on PMA'a.