Document ZJo9m03Z2gjYVr3KZLpzmmR50

] QUOTATION Rpbetison H.H. Robertson Company 5133 N. Central Avenue Phoenix, Arizona 85012 Telephone: 602 277-9316 February 18, 1977 To: Southwestern Industrial Contractors and Riggers, Inc. Attention: Mr. H. E. Wickes, Project Manager RFQ #610-3 P. O. BOX 26976 El Paso, Texas 79926 Subject: Our Estimate No: 31--2020 ASARCO - El Paso Smelting Works Convertor Building El Paso, Texas Gentlemen: We quote on the following subject to the conditions and terms herein and our estimate is based upon: 22<B4<J-llo&Sy 2-27&x>-tt06S Drawings EP-22741-1106A, 22715-1106M,. 22722-0907M, 22697-11063,j^22703-1106S 22743-1106A, 22742-1106A, 22702-.U.U6S, all dated 3-17-76, as prepared by Kaiser Engineers; Specification Sections 7A Preformed Roofing and Siding and 7C Louvers; and the contents of this quotation. PLAINTIFF'S EXHIBIT ASA-1196 ASARCO ELP 0001987 I Sheet No, Robertson 31-2020 Our Reference No ire propose to furnish (material only) H. H. Robertson company standard products as follows: ITEM I - SECTION 7A PREFORMED ROOFING AND SIDING 22 Gauge corrugated stainless steel panels in conformance with ASTM Al67, Type 304, No. 2D finish. 18, 20, and 24 Gauge corrugated Galbestos panels coated both sides with one standard Robertson color. Stypolight TME standard weight corrugated translucent panels. Also included are stainless steel fasteners, side and end lap sealant, neoprene closers, miscellaneous accessories, and erection drawings. ITEM II - SECTION 7C LOUVERS Type 3200 manually operable with spring and chain operating assembly. Type 3140 manually operable with push bar operating assembly, including erection drawings. PRICE: ITEMS I AND II - MATERIAL ONLY F.O.B. FACTORY WITH FREIGHT ALLOWED TO JOB SITE---------------------------------------------------------174,402.00. ' ADD FOR TAXES. NOTES: 1. We can start shipping material in less than 10 weeks after receipt of ordar and complete set of drawings and specifications for our Engineering Department. This schedule is based on return of approval drawings within two weeks.2 2. Our price i3 based upon our standard corrugated Stypolight TME as called for in the Specifications. However, it does not meet theflame spread rating of less than 50 which is also in the Specifications. ASARCO ELP 0001988 Rbbertson Sheef No. Our Reference No.j.-T.2.0.2^ EXCLUSIONS: 1. Structural or miscellaneous steel, 2. Erection, including unloading, cartage, storage, hoisting, or special cutting, such as bevel, notch, or long cutting. 3. Louver screens. 4. Man Doors (Specification Section 8A) 5. Powered Siding Doors (Specification Section 8B). SPECIAL CONDITIONS: 1. The price in this quotation is firm for delivery of materials prior to June 30, 1977. The price of material delivered after June 30, 1977 must be renegotiated prior to. June 30, 1977. The price increases as described above will apply to customer and job site delays. They will not apply when delivery delays have been caused by Robertson. 2. All Robertson shipping schedules are based on our material suppliers current allocations and schedules. Robertson will not assume any responsibility for delays to any established schedules due to revised commitments from our suppliers.3 3. Your specific attention is directed to our maximum allowable terms of payment as described in the Standard General Conditions of this quotation. Our price is based on these terms. Retention on material only orders is not acceptable. ASARCO ELP 0001989 Sheet No_ Robertson Our Reference No. 3l-2020 {Th. word "iquorr" if it appears herein meant 100 square feel of matcriol area--not ICO square feet of building area.) PRICE: Of molerial as specified above, f.o.b. Of erection________________________ Of unloading, if we are to perform if_ _____$ See Shts.2f _____ $ Not Include _____ f Not Include Total WINTER ERECTION: !n the event that this molerial is erected during )ho period commencing November 1 ond ending March 31, odd to the above price. SHIPMENT: If drawings for opprovo! are required; After receipt of complete information at Ambridge, droving* can be prepared in opproxi* a*ty _ nnrl after approval of drowings, shipment con be made in approximately If approve! drawings are not required: After receipt of complete information, shipment can be mode in approximately. Erection: After material hot been delivered to the site ond the building it reody for uninterrupted application thereof, erection con be completed in approximately - ---------- - - ----- --............ ........ - - ACCEPTANCE Of THIS PROPOSAL: This proposal it subject to Buyer's acceptance within thirty (30) days ond to the subsequent approval by on Executive Officer of the Seiler ot Pittsburgh. Thereupon if will become the entire agreement between the Buyer ond the Seller notwithstanding ony previous communications or negotiation* whether oral or written. There ore no covenants or agreements, inducements, guaranties, warranties, additions or considerations other than as set out specifically herein. The parties intend to be legally bound hereby ond to be governed by Pennsylvania law upon the execution of this instrument as a contract. In the event that the Buyer issues his own purchase order or pre* v pores a contract bosed on this proposol, the conditions contained herein sholt be deemed to be incorporated In the soid purchase order or contract unless exception it specifically token thereto. Subject to tho terms and conditions on the reverse side of the cover shoet. SPECIAL CONDITIONS See Sheet No. 3. We offer to purchase the materia! ond equipment quoted in accordance with the terms and conditions herein. ky- (herein referred to as '`BUYER") .19. Respectfully submiffed, H. H. ROBERTSON COMPANY (herein referred to ot "SELLER") by:-------------------------------------------______Robert J. Hess Branch Manager Offer to Purchase is accepted. H. H. ROBERTSON COMPANY by: .19---- ,S0.1 -7t ASARCO ELP 0001990