Asbestos sales for 1979 are compared to Budget and Forecast IV in the following table:
Domestic Export
TOTAL
Actual
Tons
$M
19577 9093
3553 2804
28,670 6357
% Budget Tons $
88 85 101 117
92 97
% Forecast IV
Tons
S
102 98 95 94
100 96
Sales of RG-244 and drilling mud products were, respectively, only 72% and 54% of budgeted tons. This was the main reason for below budget performance and erosion of sales in these areas is expected to continue due to health/regulatory effects unless "dust-free" products are developed and marketed. The Fisher-Body Division of GMC has issued an edict that no new formulations will be evaluated if they contain asbestos. Floor tile sales were above budget due to Kentile purchases which exceeded loss of sales to GAF. lie anticipate no further sales to GAF unless we make a competitive price offer or their current supplier falters.
Although domestic sales were only slightly below budget, the disparity between regions was significant due to unexpected circumstances. The following table illustrates this:
Region
East Midwest South West
Actual Sales Tons $M
3995 6855 6711 2060
1034 1021 1033
465
% Budget Tons $
177 122 172 119
66 73 35 44
TOTAL
19,621 3553
88 85
Export sales in the 4th Quarter were artificially low because of shipments which were made but not invoiced before the closing date. These will be picked up in January. Sales of RG-244-EX and SX-24 were below expectations because of plant problems in making^specification product. This situation has now been corrected and normal shipments resumed although we have a lot of "catching up" to do. For the year, export sales were a record $2804M, 8% higher than 1978. Following is a summary by country:
Country
Australia Brazil Canada
Actual
Tons
w
571 147 105 166 144 102
% Budget Tons $
51 85 181 227
49 79
i
2- -
Cont'd
Country
Europe-Grace Non-Europe-Grace Europe-Mercomed Hong Kong Japan . S. Africa Taiwan
TOTAL
Actual Tons$M
579 38 59 3
7569 10 18
678 45 13 6
1584 22 41
9096 2804
% Budget Tons $
118 126 141 180 128 163
113 121 200 220 106 121
101 117
As expected, the CAL-0SHA Standards Board ignored our testimony and established an action level of 0.1 f/cc to trigger monitoring and medical examinations. A copy of Dr. Rhodes 4th Quarter Activity Summary is enclosed.
Significant quantities of CSV are now being sold through Montello to Dresser's compounder for production of si lane-treated asbestos for use in oil base muds. Considerations are being given to bulk shipments. Montello has had good response from "UNIVIS", an oil-wetted pellet, and an engineering study was begun to assist in determining whether or not we should make this product at King City. The development of a "liquid thixotrope" is continuing with a customer/compounder and distributor. Optimism for a successful market program is beginning to prevail. A summary of technical/customer service activities is enclosed.
John L. Myers
JLM:dal Enclosures
UC 149-2,
SriTcRMAL CORRESPONDENCE
METALS DIVISION
P. 0. BOX 579 -4625 ROYAL AVE., NIAGARA FALLS, NEW YORK K3G
to(Nimt) Mr. E. W. Kantz - Niagara Falls Division Mr. R. G. Beverly -- Grand Junction
Location
Copy to Mr. J. L. Myers
oate January 21, 1980
Originating Oept. Answering letter date
Safety, Health and Environmental Affairs
Subject
Fourth Quarter Activity
A detailed listing of my time allocations and main activities during the last quarter of 1979 is attached. The time split was about 60% asbestos and 40% uranium, as anticipated.
The major uranium effort in this quarter was the completion of the AMC response to the GEIS and testimony in Albuquerque. I have also become involved with two new AMC Subcommittees:
1. Ad Hoc Subcommittee on Asbestos in Water - This group is preparing responses to the Cal span report on asbestos in water and the proposed EPA Water Quality Criteria Document on asbestos. It is anticipated that this group will phase out after this specific task is completed.
2. Subcommittee on Carcinogens - This is a new subcommittee whose initial job is to prepare a response to the EPA generic proposal for airborne carcinogens (Section 112, Clean Air Act). The specific charter is still being defined but it appears that this will be quite an active group.
It should be noted that both of these activities overlap very much with similar AIA/NA actions with which I am involved. The joint interest has resulted in good coordination, cooperation, and exchange of information between the two organizations, which should prove useful in the future.
The asbestos activities include the completion of the Proceedings of the Washington Colloquium and substantial time on the preparation of the technical report on the Round-Robin monitoring study. The latter has proven to be more complex than originally anticipated and will be a main effort for the first quarter of 1980. Moderate time, was also spent in the preparation of comments on several regulatory responses prepared by Kirkland and Ellis. This will also be a major effort in the first quarter of 1980.
A proposed Position Charter, MOP's and appropriate action plan for 1980 will be submitted separately.
/rmm Attach.
w-a Harrison B. Rhodes
Quarterly summary
Y..rJ979 Quarter 4th
ymmtj
Major Job Designation
Regulatory
1. . IPA - Radioactive Vast* Criteria
t, tn 40 CflM 3. IPA -Inactive Tailings {tfsv. . T47JJ
4. tn - Active Tailing! (Ma/ft, 190)
4. MC - from CEIS
I. MC * In* n (CPA Inactive Tailings)
7. CPA - Centric Carcinogen*
t. EfA-Vitif QuiKty
legislative V. U.M.T.A. 7ft + Antndnents 4. CaUllAjttd Tailing!
|
Conferences end Training
Miscellaneous
1-1 I t-2
MoIRnditor
Addren
{Forewarn
;Mi aInnafgoemrs
to
Represent UCC at
Asbestos
4
94 6
12
4
FSIOTCS General T. AiA/M - fatcutive Comaim*
* Board of Olreetorf * - Monitoring Comalttae - Technical Conelttee * Standards Advisory Conaltte* 2. Air Monitoring
Round Robin CHAP Washington CoHoqufa 3. Cuttoasr Servlet 4. Central Program Help
116
4 45
2 42
4
distributors - Education Monitoring Worker Education Regulatory
1, CSKA i. tn (mw *Vor* ***)
KUHAH 70JCA
ucu
J. SOT 4. 'CKZ 4. California ft. Other States legislative* 1. School Ceilings 2. Vorkuta*a Compensation Conference! end Training Mlseellaneout
JIMERAI
15 6
3
5 2 2 18
m~ w
Planning
Training Itotais] Iovuau tomis!
13-- IT 242 22
0 24 4 8 32
68 ~U 68
W1o-4rking
Rltetlon-
tMoi
S-1
Represent UCC it Meetings
Othlf Meetings
S-l CPrwovtttdmer
Service - Asbeitoi
Other
1.4 Preparation
of Plana (Central!
4
2 8
0 12
14 ____ 0 14 0 rrer~i 38%
12
00 UT 0 12
12
0 12
0 LZ25ZJ 61%
7
CZZO 1% OB8-- T10Q
UC 14^5'
JN7ZRNAL CORRESPONDENCE
METALS DIVISION
to (Name) Mr. J. L. Myers Division ucc - Metals Location Niagara Falls, NY
Copy to
Mr. R. E. Byrne, Jr. File
P. 0. BOX 579 -4625 ROYAL AVE., NIAGARA FALLS, NEW YORK 14302
oate December 31, 1979
Originating Dept,
"Calidna" AsbeStOS
Answering letter date
subject
Technical Services - Activity Report - Fourth Quarter 1979
Technical services activities during the fourth quarter are summarized in the attachments.
Dust monitoring services were provided at 28 customer facilities during 1979. Six monitorings were also conducted at Union Carbide facilities including Niagara Falls and King City. The technical service group participated in three developmental projects sponsored by the Dust Measurement Advisory Panel of the AIA.
Some 24 customer related technical service projects were performed during 1979. An updated and revised edition of the "Calidria" Asbestos Physical Tests and Procedures Manual was issued in December.
Developmental programs included silane-treated RG-244, UNIVIS (oil-treated SG-200X) and production related projects. Typical properties of standard, superstandard, and high-purity products were reviewed based on extensive testing of 1976, 1977 and 1978 production materials.
Mr. Fred Smith joined the technical services group in June. He has been programs pertaining to dust monitoring and counting projects and
laboratory techniques. He attended the NIOSH Asbestos Count Program in September.
The writer attended two seminars during the year; Asbestos Materials Techniques, University of Lavel, and a course on Persuasive Communications by Nurenberg Communications.
/rmm Attachments
Blair L. Ingalls
Month October
November
December
Developmental Programs and
Plant Assistance Fourth Quarter - 1979
Requested By B. L. Ingalls S. Ramachandran VI. B. DeAtley W. L. Murphy
17. B. DeAtley
W. L. Murphy
S. Ramachandran W. B. DeAtley J. L. Myers
H. B. Rhodes
S. Ramachandran
Job Description
Centrifugal test procedure study.
Silane-treated RG-244 patent evaluation.
Monthly QC composite testing.
Niagara Falls plant OSHA compliance inspection.
Assisted King City plant with RG-244 circuit problems.
Established program for the disposal of laboratory toxic and hazardous wastes.
Silane-treated RG-244 patent evaluation.
Monthly QC composite testing.
Pilot tests of UNIVIS production equipment at Combs and Company.
TMAP-AIA specific field training slides evaluation.
Silane-treated RG-244 patent evaluation.
Technical Services Fourth Quarter - 1979
Month October
November December
Month October
November December
Customer State University at Brockport VJ. R. Grace
Karnak
-
-
-
UCC Rep. Dr. F. Mumpton R. E. Byrne
J. L. Myers G. L. Dickson B. L. Ingalls
R. E. Byrne B. L. Ingalls
Job Description
SEM evaluation of volcanic tuff samples from Turkey.
Preparation of SEM photo micrographs of P.G-144 and RG-244.
Compilation of data for general marketing brochure.
Customer complaint concerning moisture content of RG-244.
Compilation of asbestos physical tests and pro cedures manual.
"Calidria" asbestos brochure revisions.
Characterization of "Calidria" products typical properties.
Summary of Dust Counts Fourth Quarter - 1979
Customer
Ceil cote Cleveland, Ohio
Durable Coatings Cleveland, Ohio
Michael-Walters Valier, Illinois
Automotive Chemical Detroit, Michigan
Mica Kote San Leandro, California
UCC - Lab 114 Niagara Falls, New York
UCC - Lab 118 Niagara Falls, New York
UCC - Lab 205 Niagara Falls, New York
UCC Representative G. L. Dickson G. L. Dickson
E. J. Kleber
E. J. Kleber
T. P. Norris
if
B. L. Ingalls
B. L. Ingalls B. L. Ingalls
ASBESTOS INDUSTRY QUARTERLY REPORT - 10 ifeO RECEIVED
1
Distribution
MAY 12 1980
G. R. Adams
tl.SHQSJSIiV>
R. E. Byrne, Jr.
p.
J. F. Collins
*
W. B. DeAtley G. L. Dickson
MAY 1 3 198C
R. L. Folkman
R. F. X. Fusaro/J. J. Sibley
B. L. Ingalls
E. J. Kleber
ASBESTOS INDUSTRY QUARTERLY REPORT - 10 1980 (J. L. Myers, 5/2/80)
Asbestos sales for the first quarter of 1980 are compared to budget in the following table:
Actual
Tons
HT
% Budget
Tons
i
Domestic Export
5636 2519
1020 1000
112 106 103 134
TOTAL
8155 2020
109 118
Record export and total monthly sales were established in March and the quarterly total of S2020M is higher than any previous quarter. Drilling mud sales made an unexpected turnaround and were more than double the 1979 average.
Domestic Sales by region are compared below:
Reqion
Actual Sales
Tons
$M
% Budget
Tons
S
East Midwest South West
717 2081 2352
472
208 284 411 121
91 97 138 106 121 134
60 70
Salesmen were reduced from four to three with Ed Kleber's transfer to Al-Chem group at the end of the first quarter. Ed's territory has been reassigned to the remaining salesmen, which should improve the balance between regions.
Floor tile sales continued high, partially due to unexpected purchases by GAF because of Atlas production problems. GAF has indicated continuing purchases from us at modest levels. Shipments to Kentile-Chicago continue at a rate limited only by the turnaround time of 10 bulk cars. If this continues we will determine whether or not to add additional cars to the fleet. Flintkote shut down their Chicago plant, which we did not supply, and this could.result in more business for their competitors, whom we do supply. Decreased housing starts have not affected our sales as yet but are expected to as the year progresses.
Although drilling mud sales are currently high, continued pressure from our competition with their wetted product is expected to erode our market share at an increased rate. Although we have dropped the oil-wetted pellet program, we will work closely with Montello to develop some type of lower-dust product.
RG sales are being restricted by auto makers desires to eliminate asbestos from all cars. Ford has now adopted a policy similar to GM but without the same "gusto". The decline in auto production will also have an adverse effect on sales.
-2- May 9, 1980
Export sales were the real bright spot during the report period, mainly due to above budget sales of RG-244 (148%) and SX-24 (1662). Some shipments were carried over from December due to plant production problems, but sales have been strong through the end of the quarter. Sales to Brazil and Australia are over 200% of budget but are not expected to continue at these levels.
Regulatory activities continue at a high level although no new regulations have been promulgated. Dr. Rhodes reviewed activities during the first quarter for all concerned so they will not be repeated here.
Customer and other technical service activities are described in the attached report from Blair Ingalls.
After the annual weather problems. Atlas has resumed operations and appears to be supplying previous demand. Two Canadian companies are on strike but this does not effect us. Our main Canadian competitor's labor situation is such that workers could strike on 5/11/80. There are mixed reports on whether or not they will.
UC 149-r
INTERNAL CORRESPONDENCE
METALS DIVISION
To (Name) Division Location
Mr. J. L. Myers UCC-Metals Division Niagara Falls, NY
--
Copy to
Mr. R. E. Byrne, Jr. File
P. 0. BOX 579-4625 ROYAL AVE., NIAGARA FALLS. NEW YORK 14302
Oata April 9, 1980
Originating Dept.
"Calidria" Asbestos
Answering letter date
Sueject
Technical Service Report First Quarter - 1980
Technical Services activities for the first quarter-1980 are attached.
Customer complaints requiring technical assistance and dust monitorings have been lower this first quarter comparable to the past two years. Emphasis has been on laboratory experimentations pertaining to physical properties, pro cedural techniques, centrifugal, Fann rheological tests, etc.
Fred Smith is currently working full time in the laboratory under the direc tion of Bob Kennedy as part of his continuing on-the-job training program in laboratory testing and procedural techniques.
B. L. Ingalls
BLI:dal Attachments
Month January
II
February March
Technical Services First Quarter - 1980
Customer A. T. Callas Co.
A. T. Callas Co.
UCC Rep. E. J. Kleber
II
Evans Products
T. P. Norris
Bouffard Associates
G. L. Dickson
Job Description
Plenum emissions test on Megaloid DET0X-H-1.
Evaluation of Reichhold/ RG-244 LTX premix.
Prepared calcined HPO for customer evaluation.
Plenum emissions tests on Epoxide and treated RG-244.
Month January
M
February
II
Dust Counts Performed at Customer Facilities
First Quarter - 1980
______ Customer Global Plastics Dolphin Chemical Carboline Company Protective Treatments, Inc.
UL U
- 232 -
Financial Performance
Current Year (1979)
a 1978 Actual
1979 Budget
1979 Est. Actual
% Budget
i Net Sales ($MM) Net Income ($MM)
7.2 6.6 1.2 0.6
6.6 1.1
100 183
ROA (%)
25.4
11.4
20.0
175
l ROS (%)
16.7
Net Cash Generated ($MM)
New Basis
0.5
9.2 0.4
15.9 1.1
173
i Old Basis
1.0 0.6
1.4
Higher than budgeted earnings and cash generation were mainly
i the result of unbudgeted price increases. Plant operations were reduced from 20 to 15 shifts per week in September to control product inventories and improve cash flow.
Budget Year (1980)
1979 Budget
1979 Est. Actual
1980 Budget
Net Sales ($MM)
Net Income ($MM) ROA (%) ROS (%) Net Cash Generated
New Basis
Old Basis
($MM)
6.6 0.6 11.4 9.2
0.4 0.6
6.6 1.1 20.0 15.9
1.1 1.4
6.9 0.6 10.9 6.2
(0.1) 0.2
Sales volume and income are budgeted to increase about 3% and 20-shift plant operation should be resumed by the end of the second quarter. No increase in sales prices is budgeted for 1980.
Following Year (1981)
Net Sales ($MM)
Net Income ($MM) ROA (%) ROS <%) Net Cash Generated
New Basis
Old Basis
($MM)
1980 Budget
6.9 0.6 10.9 8.2
(0.1) 0.2
1981 Forecast
7.6 0.6 11.3 8.2
0.3
- 233 -
Increased sales volume of about 7% is expected in 1981, primarily due to an increased share of the drilling mud market with "UNIVIS" and modest increases in floor tile and export sales. The major uncertainty in the Asbestos Business will continue to feel the effect of government regulations and adverse publicity.
CONTINGENCY PLANS
234 e-
ASBESTOS INDUSTRY QUARTERLY REPORT - 4Q 1980 Distribution G. R. Adams R. E. Byrne, Jr. J. F. Collins W. B. DeAtley G. L. Dickson R. L. Folkman R. F. X. Fusaro/J. J. Sibley B. L. Ingalls R. D. Koch G. M. Lincoln T. P. Norris H. B. Rhodes
J. E. Walsh File
i/c- i&H
ASBESTOS INDUSTRY QUARTERLY REPORT - 4Q 1980 (J. L. Myers, 2/2/81)
Asbestos sales for 1980 are compared to Budget and Forecast IV in the following table:
Actual Sales
Tons
$M
% of Budget
Tons
$
% of Fcst IV
Tons
$
Domestic Export
21141 8807
3872 3306
105 100
90 no
100 99 96 97
Total
29948 7178
100 105
98 98
Export and total dollars set new records for annual sales, although the total was only $22,000 higher than 1978, the previous record year. Domestic sales were above budget for floor tile and drilling mud, while RG products finished at 85% of budget. By contrast, export sales of RG products were 122% of budget and tile sales were below budget due to our Australian customer discontinuing the use of asbestos in the second quarter. Sales to tile customers are tabulated below:
Customer
U.S. TILE CUSTOMER SALES, $M
Actual
% Budqet
Kentile
810 111
Uvalde
532 120
GAF 222 313
Flintkote
55 .52
Winburn
5 23
Amtico
00
TOTAL
$1624M
116%
Sales to W. R. Grace , primarily for Europe, exceeded one million dollars for the first time; and Tomoe purchases for distribution in Japan set another record at $1.7 million. Following is a summary of export sales by country:
Country/Sales Rep.
Japan/Tomoe Europe/Grace Brazil/UC Canada/H & C Australia/UC Taiwan/UC Mexico/Grace S. Africa/Grace S. Africa/UC Argentina/Grace Europe/Mercomed Taiwan/Grace Colombia/Grace
1980 Sales, $M
Actual
% Budqet
1741 931 171 134 115 87 37 29 24 17 9 6 4
103 116 116 104
87 105
--
267 --
64 ----
-2- February 2, 1981
As indicated by the above, Grace has increased their activity in non-European countries and is competing with Union Carbide in S. Africa and Taiwan. This competition presents some complications, such as with pricing, but it does get the attention of the UC sales offices.
Highlights for 1980 are summarized as follows:
1. March and first quarter sales established monthly and quarterly records.
2. Domestic sales personnel were reduced from four to three. Geographical responsibilities were revised and Eastern Canada was assigned to export sales.
3. Flintkote shut down floor tile plants in Chicago (March) and Los Angeles (November), leaving Toronto as their only tile production facility. We were supplying LA about 75 TPM, but nothing to Chicago or Toronto. Winburn shut down in the second quarter,i a loss of about 200 TPY.
4. Atlas experienced major operating difficulties in the first quarter and "officially" discontinued production in the second quarter.
5. Calaveras discontinued production of Grade 7 products in November, but this will have little effect on our sales in 1981.
6. We have obtained continuing business from GAF in Long Beach and Vails Gate because of the Atlas shutdown. This should continue in 1981, although GAF tile plants are now up for sale.
7. Auto maker policies on asbestos use and low auto production caused a significant loss of RG sales.
8. Drilling mud sales were strong all year and were 165% of budget at year end. This is due to the record number of rigs operating, but our market share continued to drop due to the marketing efforts on Flosal, a wetted and prilled product from J-M. We decided not to offer a wetted product but did supply about 100 tons of UNIVIS (1/8" SSG pellets) for field evaluation of dust generation and down-hole performance. Tests will continue in 1981 and improved packaging will be considered.
....... . 9. During the first half, Great_Gulf Chemicals purchased about 500 tons of CSV from Montello to make silane-treated asbestos (SMF) under contract from Dresser Industries. Dresser blends SMF with other materials to make a product for use in oil-base drilling fluids. Great Gulf began experiencing severe production problems in the last quarter and singled out CSV as the cause for off-spec SMF. Although we are sure CSV was not at fault, they tested HP0 from a regular distributor (D&F-Houston) and, by the end of the year, had essentially switched from CSV to HP0. Although we have an exclusive arrangement with Montello, the Law Dept, advised that we should not "get involved." The situation has been dis cussed with Montello and no significant problems are anticipated.
-3- February 2, 1981
10. Although Canadian asbestos producers had some labor problems, all contracts were settled before there was any impact on our business. There is a considerable excess of Grade 7 fiber and by the end of the year it was becoming evident that we could expect unusual pricing pressures in 1981, especially in Japan and the Eastern U.S.
11. Although there was a constant threat of new regulations, none were promulgated which would have a serious effect oh our business The main threat to the asbestos industry was the continuing use of the media by the agencies to instill an unfounded fear of asbestos. We anticipate reduced regulatory pressures for the next four years.
12. Although sales were at a record level, financial performance was poorer than prior years because of unexpectedly high production costs, especially energy-related. Following is a summary of the last three years:
1978 1979 1980
1981 Budget
NIFS $M % Budq.
7156 6360 7178
126 97
105
9356
--
Gross Margin $M % Sales
2944 2439 2139
41 38 30
2824
30
Net Income $M % Sales
1190 1041
827
17 16 12
1255
13
*R0A
25.4 19.8 16.6
21 .8
13. The improved performance budgeted for 1981 can only be achieved by implementing large price increases to offset production and other cost increases. One distributor agreement was terminated at the end of 1980 which will result in a $46,000 savings in commissions in 1981.
14. Customer technical service activities for the year are summarized in the attachment.
UC .
SNTERNAL CORRESPONDENCE
METALS DIVISION
to (Name) j, |_. Myers Division uCC-Metals Division Location Niagara Falls, NY
------
copy to
Byrne, Jr.
File
p. o. box 579-4625 royal ave.. Niagara falls, new york 14302
`c January 7, 1981
originatesoePt. "Calidria" Asbestos
Answering letter date
subject
Technical Service Activity Report, 4th Quarter - 1980 and Year End Summary of Activities
Technical Services activities for the 4th quarter 1980 are attached.
Dust monitoring services were provided at 16 customer facilities during 1980, a 43% decline from 1979. However, air monitoring programs in general and AIA/NA-DMAP related work increased substantially during 1980. Monitorings related to UNIVIS evaluations at drilling locations and special tests performed at select residential sites in California were considerably involved; both from the standpoint of field work and overall manpower.
Developmental investigations included two general areas of study; evaluations of asbestos physical properties and test methods, and product development. A general breakdown of specific areas of study is as follows:
Asbestos physical properties & test methods
1) Centrifugal techniques for particle sizing 2) Fann viscometer determinations of rheological characteristics 3) Marsh Funnel determinations of rheological characteristics 4) Development of an asbestos slurry solids determination test
based on densimeter techniques
Product Development
1} LTX programs - Asbestos liquid thixotropes including, DIOP, polymer resins and oil treatments
2) Study - physical properties of Standard,Super-Standard and High Purity products
3) Silane treated RG-244 developmental products 4) Study of RG-244 physical & rheological properties and related
test methods.
J. L. Myers
-2- January 7, 1981
Approximate time allocations for the principle areas of activity, during 1980 were as follows:
Customer dust count services Routine Technical service Plant Assistance:
Routine Special Air Monitoring study Developmental AIA/NA related projects
15% 25*
10% 20% 25%
5%
BLI:dal Attachments
Month Oct. Nov.
Dec.
BLI:dal 1/8/81
Developmental Programs and
Plant Assistance 4th Quarter - 1980
Originated By BLI WBD BLI/WBD WBD
WBD FRA
WBD
HBR WBD
Job Description
Study of new laboratory test methods (Main Circuit).
Quality Control testing of monthly production composites.
Investigation for new labor atory QC test method of RG-244
Monitoring Program - Airborne asbestos concentrations in specific California residential sites.
Quality Control tests of monthly production composites.
Physical properties tests of select asbestos slurry samples prepared by UCC engineering department.
Monitoring Program - Airborne asbestos concentrations in specific California residential sites.
AIA/NA - DMAP evaluation of optical resolution determination slides prepared by DMAP.
Quality Control tests of monthly production composites.
Month Nov.
Dec.
Technical Services 4th Quarter - 1980
Customer Dresser Ind. AIA/NA Montello
Tomoe W. R. Grace
Bouffard Assoc.
UCC Rep. JLM HBR JEW
REB REB
GLD
Job Description
Evaluation of RG-244 in nonaqueous drilling fluids.
Evaluation of test resolution slides for DMAP.
Evaluation of plenum chamber airborne emission character istics of SSG products.
Physical properties testing of SG-130 product.
Investigation of customer complaint - SX-14 contamina tion.
Evaluation of plenum chamber emission characteristics of acetate treated RG-244.
Month Nov.
Dust Counts Performed at Customer Facilities
4th Quarter - 1980
Customer Global Plastics