WRITTEN BY: JMS APPROVED BY: DATE: 9/90 REVIEWED BY: DY DATE: 10/91
OPERATOR'S NAME:
+----- ---------------------------------------------------1 | 6903-019.SOP | MC PRODUCT TYPE 343 IN SPEC TANKS
DATE:
|CHECK | ACTION STEPS (Capital Letters) and COMMENTS (Small Letters)
SL 006415
1. REVIEW JOB SAFETY INSTRUCTIONS. BECOME FAMILIAR WITH THE CHEMICALS THAT YOU ARE WORKING WITH. KNOW SOME OF THEIR CHARACTERISTICS. KNOW WHAT PROCEDURES TO USE IN CASE OF A SPILL/RELEASE OR ACCIDENT.
2. INSURE THAT YOU ARE WEARING PROPER SAFETY EQUIPMENT. HARD HATS, SAFETY SHOES, SAFETY GLASSES AND ESCAPE RESPIRATORS ARE REQUIRED WHEN WORKING IN ANY PRODUCTION AREA. GOGGLES AND CHEMICALLY SAFE GLOVES ARE RECOMMENDED WHEN CATCHING SAMPLES. A COMFO II MASK IS REQUIRED WHEN GAUGING TANKS.
3. SPLIT PRODUCTION TO SPEC 11 OR SPEC 12 AS PER LEAD OPERATOR. /
IF NO PRODUCTION IS IN THE OLD SPEC FARM:
______ 4. OPEN THE PRODUCTION LINE INTO SPEC 1, MAKING SURE THAT THE PRODUCTION LINES TO THE OTHER SPEC TANKS ARE CLOSED.
______ ______
5. FOLLOW THE PRODUCTION LINE TO THE MANIFOLD IN THE OLD SPEC FARM, AND OPEN THE VALVE IN THE LINE THAT COMES FROM THE PRODUCTION AREA IN THE UNIT.
6. IN THE STAB FARM AREA, OPEN THE VALVE IN THE PRODUCTION
f
MANIFOLD THAT LEADS TO THE SPEC TANKS. PINCH BACK ON THE VALVE THAT LEADS TO THE OTHER PRODUCTION TANK (STAB OR DAY) SO THAT APPROXIMATELY 25 GPM IS GOING TO THE SPEC TANKS.
______ 7. ALLOW PRODUCTION TO FLOW INTO SPEC 1 FOR APPROXIMATELY 10 TO 15 MINUTES TO FLUSH THE PRODUCTION LINE.
______
8. OPEN THE PRODUCTION LINE TO SPEC 11 OR SPEC 12 AS PER LEAD OPERATOR. CLOSE THE PRODUCTION LINE TO SPEC 1. Note the beginning level of the production tank so that the correct amount of stabilizer can be added.
______
9. NOTIFY THE LEAD OPERATOR AND THE MC OPERATOR THAT PRODUCTION HAS BEEN SPLIT. ASK IF THE LEVEL IN THE PHASE SEPARATOR IS OK.
______ 10. CHECK THE LEVEL IN THE PRODUCTION TANK PERIODICALLY TO MAKE
SURE THAT IT IS COMING UP AND TO PREVENT OVERFILLING. ALSO
CHECK TO MAKE SURE THAT THE OTHER SPEC TANK LEVELS ARE
HOLDING.
CONFIDENTIAL:
Subject to Protective Order
; 14th Judicial District Court
Page 1 of 4
No. 91-1145
IF PRODUCTION IS ALREADY IN THE OLD SPEC FARM:
11. SKIP PROCEDURES 4 THROUGH 10.
12. OPEN THE PRODUCTION LINE TO SPEC 11 OR SPEC 12 AS PER LEAD OPERATOR.- CLOSE THE PRODUCTION LINE TO THE CURRENT PRODUCTION TANK. Note,the beginning level of spec 11 or 12 so that the correct amount of stabilizer can be added.
13. NOTIFY THE LEAD OPERATOR AND THE MC OPERATOR THAT PRODUCTION HAS BEEN SWITCHED TO SPEC 11 OR 12. ASK IF THE LEVEL IN THE PHASE SEPARATOR IS OK.
14. CHECK THE LEVEL IN THE PRODUCTION TANK PERIODICALLY TO MAKE SURE THAT THE LEVEL IS COMING UP AND TO PREVENT OVERFILLING. ALSO CHECK TO MAKE SURE THAT THE LEVELS IN THE OTHER SPEC TANKS ARE HOLDING.
* ONCE PRODUCTION IS IN SPEC 11 OR SPEC 12, PRESTABILIZE WITH 30 GALLONS OF BLM:
______ 15. CHECK THE STABILIZER LINES ON THE SPEC TANKS THAT ARE NOT BEING STABILIZED TO MAKE SURE THAT THEY ARE CLOSED. OPEN THE STAB LINE ON THE PRODUCTION SPEC TANK.
16. IF THE BEGINNING LEVEL OF THE TANK WAS EMPTY, SET THE SMITH METER ON THE STABILIZING PUMP TO 30 GALLONS. IF THERE WAS A LEVEL IN THE TANK PRIOR TO SWITCHING PRODUCTION, ADJUST THE AMOUNT OF STABILIZER TO BE ADDED USING THE STAB PROGRAM.
17. CHECK THE BLOCK VALVES ON THE TBL/MC, TLE AND DME TANKS AND LINES TO MAKE SURE THAT THEY ARE CLOSED TO PREVENT CROSS CONTAMINATION. OPEN THE SUCTION VALVE AND THE BLOCK VALVES FROM THE BLM TANK TO THE STABILIZER PUMP.
18. OPEN THE SUCTION AND DISCHARGE VALVES ON THE STAB PUMP. OPEN THE VALVE ON THE STAB LINE LEADING TO THE SPEC TANK THAT IS BEING STABILIZED.
19. PULL THE HANDLE ON THE SMITH METER AND TURN ON THE PUMP. Don't leave the pump while stabilizing. The meter doesn't always shut off at the set amount.
20 AFTER THE SET AMOUNT OF BLM HAS PUMPED INTO THE PRODUCTION TANK, TURN OFF THE PUMP. CLOSE THE SUCTION AND THE DISCHARGE VALVES ON THE STAB PUMP.
CONFIDENT!^.
of '-`icia . Distric Order o. t Court
* NOTE:
To make MC product type 343 in Spec 11 or Spec 12, only 30
gallons of BLM is required. Therefore, when the tank is being prestabilized it is also being stabilized for the final product.
Porto 2 of 4
SL 006416
______ 21. BLOW THE STABILIZER LINE TO THE PRODUCTION TANK WITH N2 FOR APPROXIMATELY 5 MINUTES TO CLEAR THE LINE AND MAKE SURE THAT ALL OF THE BLM IN THE LINE GOES INTO THE TANK.
______ 22. CLOSE ALL VALVES THAT WERE OPENED TO STABILIZE. TO MAKE SURE THAT THERE ARE NO LEAKS.
<b TOP OFF SPEC 11 OR 12 AT^FEET AIR SPACE:
DOUBLE CHECK
______
23. IF PRODUCTION IS TO REMAIN SPLIT TO THE OLD,SPEC FARM TO ANOTHER SPEC TANK, TOP OFF SPEC 11 OR 12 KTJ6 FEET AIR SPACE. CHECK WITH THE LEAD OPERATOR TO FIND OUT WHICH SPEC TANK IS TO BE USED FOR PRODUCTION NEXT. OPEN THE VALVE ON THE
PRODUCTION LINE TO THAT TANK. Note the beginning level. CLOSE THE VALVES ON THE PRODUCTION LINE TO SPEC 11 OR 12. NOTIFY THE LEAD OPERATOR THAT A TANK HAS TOPPED OFF.
______
24. IF PRODUCTION IS NOT TO REMAIN SPLIT TO THE OLD SPEC FARM, TOP OFF THE TANK 2 INCHES FROM THE TOP OFF LEVEL. CLOSE THE PRODUCTION VALVE LEADING TO THE OLD SPEC FARM AT THE PRODUCTION MANIFOLD IN THE STAB TANK AREA. OPEN THE PRODUCTION LINE TO THE OTHER PRODUCTION TANK (STAB OR DAY) WIDE OPEN.
______ 25. NOTIFY THE LEAD OPERATOR AND THE MC OPERATOR THAT A TANK HAS TOPPED OFF AND PRODUCTION IS ALL IN THE STAB TANK AREA.
______ ______
26. BLOW THE PRODUCTION LINE WITH N2 FROM THE MANIFOLD IN THE STAB TANK AREA TO THE SPEC TANK IN THE OLD SPEC FARM AREA FOR APPROXIMATELY 10 MINUTES.
(
27. CLOSE ALL VALVES IN THE PRODUCTION LINE FROM THE MANIFOLD INj THE STAB FARM AREA ALL THE WAY TO THE SPEC TANK IN THE OLD SPEC FARM.
* PUT SPEC 11 OR SPEC 12 ON RECIRCULATION AND SAMPLE:
______
28. CHECK TO MAKE SURE THAT THE SUCTION AND RECIRCULATION LINES
AND VALVES ARE CLOSE THE OTHER SPEC TANKS. OPEN THE SUCTION
VALVE AT THE TANK WIDE OPEN AND OPEN THE RECIRCULATION VALVE
APPROXIMATELY HALF WAY.
!
SL 006417
* NOTE:
A tank may be put on recirculation before it tops off. If this is done, note the time of top off to make sure that it recirculates for 8 hours after top off before a sample is caught. There may be a time when the tank cannot be put on recirculation before or at the time of top off due to other lines being used that tie in to the same lines of the tank.
As soon as it is possible to put the tank on recirculation, do so and note the time. It must recirculate for 8 hours before sampling.
Pane 3 of 4 y
CONFIDENTIAL: Subject to Protective Order
of 14th Judicial District Court ' Mn q l -1 14 5
29. OPEN THE SUCTION AND DISCHARGE VALVES ON THE 343 PUMP. OPEN ALL OTHER BLOCK VALVES THAT MAY BE CLOSED BETWEEN THE TANK AND THE PUMP. DOUBLE CHECK TO MAKE SURE THAT ALL OTHER LINES THAT LEAD TO OTHER TANKS AND TO SHIPPING ARE CLOSED.
30. TURN ON THE PUMP. DOUBLE CHECK TO MAKE SURE THAT THE PRODUCT IS FLOWl'NG BACK INTO THE TANK.
31. LET THE TANK RECIRCULATE FOR 8 HOURS. AFTER 8 HOURS OF RECIRCULATION, TWO 1/2 GALLON SAMPLES ARE CAUGHT AND BROUGHT TO THE MAIN LAB FOR ANALYSIS. TAG THE SAMPLE BOTTLES WITH THE TANK NUMBER, BATCH NUMBER OF THE TANK, AND PRODUCT TYPE FOR IDENTIFICATION. ALSO STATE ON THE TAG THE TESTS THAT NEED TO BE RUN BY THE LAB.
(
SL 006418
CONFIDENTIAL Subject to Protective
Order
rji strict Coutt
of 14 th Ju i'.ou-.J
SPILL/RELEASE POTENTIAL:
1. Make sure that all bleeds are closed and plugged. 2. Periodically check the level of the production tank to make sure
that it is coming up and to prevent overfilling. 3. Periodically check the other tanks to make sure that the level is
holding and not coming up. 4. Always check and double check valves to prevent cross
contamination and other problems. 5. All valves in the old spec farm should be closed when not being
used. Make sure that they are closed after each job is finished.
Page 4 of 4