ABD00173546 VCM TRAINING CLASS
Test 1977
Department
qo , /
^ J-&. ??
Date
1- The VCM Standard that we now comply with has limits for VCM of -Lj>pm
time-weighted-average and excursions of
ppm for 15 minutes.
2- Respiratory Protection devices (gas masks, continuous flow airline, Scott Air Pak) are required above:
A-' 1 ppm (@ 10 ppm
C- 32 ppm
.
3- Our continuous Honeywell monitors sound an alarm when in an area.
1 B- 10 C- 32
' ppm is reached
4- All respirators masks are cleaned:
A- Weekly
B- Monthly
Daily
,
5- We monitor you on a.regular basis to:
A- Minimize your exposure to VCM
Monitor our progress in reducing VCM concentrations in our plant Both A and B D- Neither A or B
6- The VCM regulation does not apply to products made from PVC.
False
7- The two regulated areas in our plant are:
A- Dry Blend basement and Q C Lab .Jt>P-l building and Boiler House
fCy VCM Tankfarm and Large Reactors
8- Our Plant Emergency Procedures are outlined in the;
Collective Bargaining Agreement Make Safety A Habit Booklet PVC Plant Safety and Health Manual
VCM TRAINING CLASS Test 1977 page 2
ABDOO173547
/
9- Does non-Conoco personnel have to sign the Regulated Area Log before entering the area?
10- Our plant is continuously monitored for VCM at 40 different points
s. aday year round.
*