Document Z4k0OKj0a2X40BMrd8vZ2LY28
Region 6 - Enforcement & Compliance Assurance Division
INSPECTION REPORT
Inspection Date: Media Program: Regulatory Program:
01/13/2026 Water (CWA) Water (CWA) Brine Program (Oil & Gas Inspection)
Company Name: Facility Name: Facility Physical Location:
(city, state, zip code) Mailing address:
(city, state, zip code) County/Parish: Facility Phone Number:
Facility Contact:
Enerco Operating Corporation
Clark Tank Battery
Off County Road 249 at 33.320769, -93.813836
Genoa, AR 71840
11535 East Ricks Circle
Dallas, TX 75230
Miller County
870-953-0287
Terry Collum
Field Supervisor
terrycollum@enercooperating.com
FRS Number: Identification/Permit Number: Media Identifier Number: NAICS: SIC:
N/A ARU002311 N/A 211111 1311
Personnel participating in inspection:
Tom McKay
EPA / Region 6
Uma Lad
EPA / Region 6
Kerri McCabe
EPA / Region 6
Terry Collum
Enerco Operating Corporation
Inspector Inspector / Enforcement Officer Inspector / Enforcement Officer Field Supervisor
EPA Lead Inspector Signature/Date
UMA LAD
Uma Lad
Digitally signed by UMA LAD Date: 2026.02.20 08:32:05 -06'00'
Date
Supervisor Signature/Date
JEANNE ECKHART Date: 2026.02.20 12:04:47 -06'00' Digitally signed by JEANNE ECKHART
Jeanne Eckhart
Date
6ENFORM-019-R9 (02/27/2025)
1
Enerco Operating Corporation / Clark Tank Battery (ARU002311 / CWA) Inspection Date 01/13/2026
Section I - INTRODUCTION PURPOSE OF THE INSPECTION EPA Region 6 inspectors Tom McKay, Uma Lad, and Kerri McCabe arrived at the Enerco Operating Corporation / Clark Tank Battery, located off County Road 415 at 33.254492, -93.953885, at 9:25 AM on 01/13/2026 for an announced inspection. We met with Terry Collum, Field Supervisor for Enerco Operating Corporation. The inspection was conducted by the authority of the Clean Water Act (CWA) to determine compliance with Environmental Protection Agency (EPA) regulations. There were no other federal, state, or local agency representatives present at the time of the inspection. EPA previously inspected this facility on 04/15/2025. FACILITY DESCRIPTION EPA conducted an inspection on the Enerco Operating Corporation / Clark Tank Battery, which consists of one (1) production well. Section II - OBSERVATIONS I observed the facility, associated signage, and production well, see Appendix 1 (Photograph Log), Photo No. 1 and No. 2. For additional GPS location and photo metadata, see Appendix 1. Enerco Operating Corporation removed three (3) storage tanks, one (1) separator, and associated piping and loose oil (observed during the 04/15/2025 EPA inspection) and restored the surface. At the time of the inspection, no equipment remains at the facility except for the production well. Section III - AREAS OF CONCERN There were no areas of concern at the time of the inspection. Section IV - FOLLOW UP Inspector will provide the completed inspection report to the company representatives. Section V - LIST OF APPENDICES Appendix 1 - Photograph Log - 2 photos taken 01/13/2026.
2
Enerco Operating Corporation / Clark Tank Battery (ARU002311 / CWA) Inspection Date 01/13/2026
Appendix 1 Photograph Log
2 Photos
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Photograph Log
Appendix 1
Photo No. 1
Facility/Location:
Enerco Operating Corporation Clark Tank Battery
City: Genoa
County:
State: AR
Filename: R0011234.JPG
Photo Date: 01/13/2026
Photographer: Uma Lad
Witness Name:
Direction: SW Time: 09:25:43 Kerri McCabe/Tom McKay
Description: This photo was taken facing southwest and shows the sign on the production well.
Latitude: 3319'13.416" N
Longitude: 9348'46.806" W
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Photograph Log
Appendix 1
Facility/Location:
Photo No. 2 Enerco Operating Corporation Clark Tank Battery
City: Genoa
County: Miller
State: AR
Filename: R0011235.JPG
Photo Date: 01/13/2026
Photographer: Uma Lad
Witness Name:
Direction: SW Time: 09:27:38 Kerri McCabe/Tom McKay
Description: Latitude:
This photo was taken facing southwest and shows that Enerco Operating Corporation
removed the three storage tanks, separator, associated piping, and loose oil at the
facility observed during the 04/15/2025 inspection and restored the surface.
3319'14.88" N
Longitude: 9348'49.32" W