W. L. Smull - Krummrich Plant
DTt suojr.cT
REfERTNrf
TO
;
January 11, 1977 WASTE INCINERA TION - WGK_________
R. w. Flint
R. E. Bilger
-
J. E. Bishop
-
H. C. Carder
-
C. Downing -
P. W. Edwards -
w. A. Kuhn
-
M. A. Pierle
-
R. A. Pohl
-
J. E. Smith
-
J. F. Thompson -
R. M. Kountz
_
E3NA B2SL E1SF E3NA B2SL, EISA EISA B2SB B3NA E1SF
F4WA
Plant Mgr's. Staff
TSD Staff
.
P. E. Heisler
K. E. Boucher
E. E. Hendrikse-B2NA R.S. Nelson - B3NJ
The "AroclorM incinerator was originally installed for the specific purpose of destroying Aroclor bearing wastes. It currently serves that purpose, plus other plant wastes are incinerated in it to utilize excess capacity. The facility is capitalized as a plant service facility with a $747 K Gross Asset Value and a $340 K Net Asset Value as of 12/31/76.
. 1
In late 1977 shutdown of the Aroclor Department will eliminate internally
generated Aroclor wastes and in early 1980 startup of the new rotary
kiln incinerator will occur. This unit will provide waste disposal
capability at WGK for all known and projected incineratable wastes, none
of which require the high temperature capability of the existing incinera
tor.
Thus, prior to completion of shutdown and decontamination of the Aroclor unit, the position of the business group toward disposal of customer Aroclor wastes after we cease Aroclor production needs to be recon firmed. Their previous position has been that they will not do so but will refer customers to contract incinerators on the basis of lower cost to the customer and no liability to Monsanto. A new factor favoring this position is that the pending Sauget NPDES permit contains a clause re lating to requiring monitoring and, if necessary, pretreatment of the Monsanto effluent for PCB's which may be avoided if no PCB operations exist at Krummrich. If the business group wishes to retain Aroclor incineration capability at WGK, it should include the provision that they assume the capital and operating costs of the incinerator as well as any environmental monitoring and treatment costs related to maintaining this facility.
If the Aroclor group is not interested in the facility and another group
has a need for a facility capable of high temperature incineration, it
should be offered to them on the same basis.
.
IN - 1 <* L. V 1
SW 355820 STLCOPCB4085440
R. W. Flint Waste Incineration - WGK
Page 2 WGK 1/11/77
Assuming no one is interested in the facility for dedicated service we should evaluate the "out-of-pocket" economics of converting this unit to incineration during 1978-1979 of selected St. Louis area wastes versus contract incineration costs. Ken Boucher has been requested to make this cost analysis as well as prepare preliminary retirement and dismantling cost information. Opera tion and retention of this facility after startup of the rotary kiln incinerator appears not to be feasible unless a viable specific need for high temperature incineration is identified.
To simplify in-plant communication, technical responsibility for all WGK incineration facilities is being given to L. W. Sprandel, Zone A.