Document Z4Zpg3mnob9LmB11KvkwbmVJ

946 CHAPTER 49 1949 Guide resistant ability, and ease of application. Board or blanket types are most common. ; Duct insulation must have the same characteristics as hull insulation. Semi-rigid board is most common, and the blanket type is used only, for curved surfaces. Corrugated asbestos is not used because the presence of moisture tends to disintegrate it' Preheaters are frequently located close to the outside air intake in order to conserve insulation, and for the same reason zone reheaters are located as close as possible to the zone Where a reheater serves only one space, the heater is commonly located in the space. BIBLIOGRAPHY ' The Ventilation of Ships, by R. McDonald1 {Journal of the Institution of Heating and Ventilating Engineers (British) October, 1939). Ventilation and Air Conditioning of the S. S. Panama {Heating and Ventilating, September, 1939, p. 47). Air Conditioning the New Mauretania {Heating, Piping and Air Conditioning, July, 1939, p. 431). , Heating, Ventilating and Air Conditioning on Shipboard, by J. H. Clarke (Heating. Piping and Air Conditioning, August, p. 467; September, p. 529; October, p. 610, 1940). . Care of Cargo at Sea, by O. D. Colvin, W. H. E. Hahne, and M. R. Colby. {Trans actions of the Society of Naval Architects and Marine Engineers; Parti, Vol. 46,1938, p. 109; Part II, Vol. 49,1941, p. 208). . . . . Ventilation of Ships, by J. Dawson {Journal of The Institution of Heating and Ventilating Engineers, London, Vol. 10, June-July, 1942, No. Ill, p. 89). Modern Marine Engineers Manual, Vol. II, Sections 16'to 19, Inch (Cornell-Mari time Press, 1943). ^ Warship Ventilating, Heating and Air Conditioning, by Comdr. T. H. Urdahl, U.S.N.R., and W. C. Whittlesey (A.S.H-V.E. Transactions, Vol. 49, 1943, p. 35). Standardized Heating and Ventilating Equipment for Fighting Ships, by Comdr. T. H. Urdahl, U.S.N.R., and Lt. John Everetts, Jr., U.S.N.R. {Heating, Piping and Air Conditioning, July, 1943; p. 333). Designing Warship Ventilation with Standardized Equipment, by Comdr. T. H. Urdahl, U.S.N.R., and W.'C. Whittlesey {Heating, Piping1 and Air Conditioning, August, 1943, p. 419). ; ^Ventilation and Heating of Maritime1 Commission Ships, by J. W: Markert (Heat ing and Ventilating, February,1943, p. 32). Why Ship Ventilation, by J. W. Markert (Heating and Ventilating, October, 1943).. Evolution of Ships Ventilation Systems, by J. W. Markert (The Log, 1944 Year book, p. 202). ; , Refrigeration, Air Conditioning, Ventilation and Heating, by H. E. Parker (Marine Engineering, Vol. II, The Society of Naval Architects and Marine Engineers, 1944, Chapter VI, p. 319). n ' Blackout at Sea, by J. W. Markert (Heating and Ventilating, March, 1944, p. 55). ;;; Your Merchant Marine Will be Comfort Air Conditioned, by J. W. Markert (Heat ing and. Ventilating, May, 1945, p...60). Modern Air Conditioning, by J. W. Markert (Marine Engineering and Shipping Review, November, 1945, p. 177). Modern Marine Refrigeration and Air Conditioning, by W. H. Carrier and L. E.! Star (Marine Engineering and Shipping Review, April, 1946, p. 132). Dehumidification Protects U. S. Navy's Inactive Fleet,.by Capt. T. H. Urdahl and Comdr. E. R. Queer (Heating, Piping and Air Conditioning, March,.1946, p. 71). CHAPTER 50 WATER SERVICES Estimate of Demand Load, Estimate of Pipe Capacity, Sizing of Cold Water Supply Piping, Hot Water Supply Piping, Storage Capacity and Heating Load, Methods of Heating Water, Computing Area of Heat ! Transmitting Surface, Control of Service Water Temperature, Solar Water Heaters PROPER design of the water distributing system in a building is neces sary in order that the various fixtures may adequately perform their function. The amount of either hot or cold water used in any building is variable, depending on the type of structure, usage, occupancy, and time of day. It is necessary to provide piping, water heating, and storage facilities of sufficient capacity to meet the peak demand without wasteful excess in either piping or equivalent cost. Most of the data on the sizing of the water supply pipes have been taken from various, reports of the National Bureau of Standards1. '. ESTIMATE OF DEMAND LOAD The demand load in building water supply systems is based on the number and kind of fixtures installed and on the probable simultaneous use of these fixtures. The essentials for making these estimates, consist princi pally of Table 1 giving demand weights in terms of fixture units for different plumbing fixtures under different conditions of service and Fig. 1 giving estimated demand in'gallons per minute corresponding to any total number of fixture units. Fig. 2 shows an enlargement of Fig. 1. for a range up to 250 fixture units. -. The estimated demand load for fixtures used intermittently on .any supply pipe will be obtained by multiplying the number- of each'kihd of fixture supplied through that pipe by its weight from'Table. 1, adding . tiie products, and then referring to the appropriate curve of Figs. 1 or 2 with this sum.- In using this method it should be noted-that-the demand for fixture or supply outlets other than those listed in the table pf; fixture ' units is not yet included in the estimate. The demands for outlets^-such as hose connections, air conditioning apparatus, etc.--which are likely to impose continuous demand during times of heavy use of the weighted fixtures should be estimated separately and added to the demand for fixtures used intermittently, in order to estimate the total demand. Estimate of pipe capacity The size of iron pipe required to carry a given rate of flow with a given pressure drop may be determined from Fig. 3 for Fairly Rough, or Fig: 4 for Rough Pipe, respectively2. Ferrous pipe, after a few years of water supply service even with the best of waters in respect to corrosion and caking, will have become sufficiently roughened so that it may.be considered as fairly rough pipe and, hence, Fig. 3 may be used to estimate the capacity: of ferrous pipe which will carry such water. With badly corrosive or badly caking water; the flow chart' in Fig. 4 should be used to estimate capacities of ferrous-pipe'and no pipe should be smaller than f inch for this type of service. " 1 ': tU7 ,