The Celanese Chemical Company Plant at Bishop Texas finds that it is necessary to demolish about 500 feet of 2 inch pipe that is covered with friable asbestos insulation. This asbestos insulation will be removed from the pipe and disposed of. The proper procedures will be followed as to wet ting the insulation, stripping it, placing it in plastic bags, and landfilling it at our asbestos disposal site.
This letter will serve as notification of the work to be done following the procedures of 40 CFR. 61.22 ('d) (2). The attached data sheet lists all pertinent data.
Please contact me if you have any questions or comments.
Very truly yours
PEH:bt Attachment
P. E. Hime
/
CELANESE CHEMICAL COMPANY. INC. BOX 428. BISHOP, TEXAS TELEPHONE 512--!
PLAINTIFFS | EXHIBIT i CEL-194
PEH-55 Page 2
^MEIANESE
NOTIFICATION INFORMATION-PIPE DEMOLITION
I. Owner: Celanese Chemical Company, Inc.
II. Address: P. 0. Box 47320 1250 W. Mockingbird Lane Dallas, Texas 75247
III.
Description: Remove friable asbestos from 500 feet of 2-inch pipe. The pipe is to be removed from the pipe rack.
IV. Address of Site: Chemcel Plant Celanese Chemical Company, Inc. P. 0. Box 428 Bishop, Texas 78343
V. Starting and Completion Date: About April 23 through May 11, 1979.
VI. Nature of the Demolition: See III above.
VII.
Procedures: Wet insulation thoroughly, strip off insulation, pack in plastic bag, and landfill in registered (on-site) landfill.
VIII. Landfill Site: Texas Department of Water Resources Registration #30084
IX. Volume of Friable-Asbestos Insulation: About 500 feet of insulation from a 2-inch diameter line.
002229