Document YrzZ6KGNr941VwyGdJ3nENbQO
1.
S US PENSION / NON-SOLVENT /VINYL REFRIGERATION UNIT VCM ACTION PLAN FOR COMPLL.NCE
Emission Source
Project Description for Compliance
Status as of 3/14/75
Non-Solvent H. P. vent
Modify No. 1 VCM rec. system to allow recovery of contained vinyl chloride {3,000 lbs VCl/day! in the H. P. vent by scrubbing in Solvent Vinyls acetone stripping system.
Complete
Suspension H. P. vent
Modify #2 VCM rec. system to send H. P. vent s tream (2 , 500 lbs /day VCMIto the #1 Powerhouse for burning in boilers as fuel.
Complete
Off-gas H. P. vent
Modify Off-gas rec. system to send H. P. vent (5Z8 lbs VCM/day) to the #1 Powerhouse for burning in boilers as fuel.
Complete
Suspension VC1 Solvent scrubbing system
Recover contained VCl in NonSolvent, Suspension, & Off-Gas HP vents by scrubbing in MEK stripping s ys tem.
Engineering design calculations are complete. Engineering/Pro* duction team to expedite system installation by Oct. 1975 has been assigned. Operation by Nov. 1. Accountability: Leroy Dampman/D. Walthal, A. A. Peterson
Nos. 3 & 4 Stripping Tank effluent
,
Recirculate #4 st. tk. effluent and increase temperature of #3 st. Ik. to minimize atmospheric releases of V CM (400 lbs /day).
Steam addition system was in stalled on #3 st, tk. on 11/26. Presently repairing recirculation pump for use by 3/31. Account ability: R. P. Keefe
Off-Gas Recovery System
Install spare vacuum pump to improve vacuum stripping of slurry.
Capital budget request has been prepared. Delivery expected by 5/1/75, Accountability: R.Q. Payne, A. A. Peterson. Esti mated cost: $100 M
UCC 091236
Suspension/Non-Solvent/Vinyl Ref. Unit VCM Action Plan For Compliance
2.
Emission Source
Project Description For Compliance
Status as of 3/14/75
Decant Tanks 14107, 14108, 14111 & 14112 (Non-Solvent)
Eliminate decanting of Non-Solvent rec. monomer tks, to the atmosphere, (144 lbs VCM/day).
Piping modifications to allow decanting of rec. monomer tks. to a closed vessel instead of the sewer were completed on 10/3. Instrumentation for automatic decanting will be completed by 4/15. Accountability: G. Pyle
Boil-off sampling
Eliminate operator exposure during boil-off sampling.
Complete
Decant Tanks C-10, C-ll (Suspension)
Eliminate decanting of Suspension
Complete
rec. monomer tks. to the atmosphere.
(100 lbs VCM/day)
Autoclave rupture dis cs
Replace autoclave rupture disc type PLDV w/more reliable type RB-90.
Complete
BDT/VST rupture dis cs
Eliminate BDT/VST rupture discs ruptures by installing DMV's on blowdown tank feed headers to avoid autoclave blowdowns during vacuum stripping.
A DMV was installed in the feed header to the #1 BDT on 11/4 w/ a dramatic decrease in number of blown rupture discs, Five remaining BD tk. feed headers will be modified by July 1975. Accountability: A. A. Peterson
Autoc Laves -high reaction pressure
Eliminate atmospheric releases
Issued new SOP.
of VCM during high reaction pressures.
Suspension surge tks, dryer exhausts
Batch vacuum strip resin to minimize atmospheric releases of VCM and reduce VCM content of resin.
Batch stripping with #5 BDT was started 3/5 with impressive re duction in residual VCM. Other BDT's are being checked by T&I before revising. Account ability: A. Peterson
Non-Solvent surge
Continuous strip resin to minimize
tanks, dryer exhausts atmospheric releases of VCM.
Complete
VC l filters
Install piping to vent VCl filters to the #3 st. tk. prior to opening for maintenance.
Complete
UCC 091237
Suspension/Non-Solvent Vinyl Ref. Unit VCM Action Plan For Compliance
3.
Emission Source
Proiect Description For Compliance
Status as of 3/14/75
Priming VCM pumps
Evaluate several means of priming VCl pumps to eliminate atmospheric releases of VCl during priming.
Complete and new procedure implemented
C-auLoolave agitator Test several packing designs to
packing failures
minimize packing failure frequency.
Autoclave resin sampling
Maint. food prep aration & eating facilities
Redesign autoclave resin sampling equipment to minimize operator expos ures.
Install a temporary bldg, to re locate maintenance food preparation and eating facilities.
Discovered & corrected quality control problem w/vendor of existing packing. Also evaluat ing new packing design for this service. New seal design com plete h ready to run. Autoclave w/H20 & Nz pressure to be tried before production. Account ability: R. H. May
Have installed samplers on all lines. Accountability: R.P. Keefe, F. L. Johnson
Complete
Fresh/rec. VCM feed pump seal replacement
Eliminate VCl packing leaks from fresh & rec. VCl feed pumps.
InstalL 20-point VFA s quentialVCl analyzer in B-120 control room
Provide additional monitoring capability in the Suspension/NonSolvent department.
Replace packing w/mechanical seals by 5/75. Accountability: R. P. Keefe
Delivery - April, 1975
Install "data-logger" for VFA sequential VCl analyzer
Improve VCM exposure data analyses and reporting capability in the Sus pension/Non-Solvent department.
Delivery - April, 1975
Surge tanks atmos pheric vents
Purchase & install compressor to transfer atmospheric surge tank vents to the #2 VCM rec. system.
No action to date
Bird Effluent re covery system
Re-use Bird effluent water rather than dump to the sewer.
Mechanical portion of project is complete. Electrical drawings to be issued March 21 - SOP being written.
UCC 091238
Suspension/Non -Solvent Vinyl Ref. Unit VCM Action Plan For Compliance
4.
Emission Source VC1 underground barrel pump seals
VCM loss in MEK
Nash-Hytor seal water Nash compressor seal replacement VCM compressors packing vents Pilot Plant VCM emissions
Project Description For Compliance
Install double-seal arrangement on underground VCM pump seals to minimize seal leakage.
Status as of 3/14/75
Double-seals have been received Engineering is presently design ing seal lube system. Plan to have on seal in service 4/15.
Reduce MEK washings & hence, VCM loss by installing direct steam injection system on each D-autoclave
Direct-steam injection tests on D-3 autoclave since 2nd Qtr 74 indicate the usefulness of this technique. An OIP for convert ing all D-autoclaves has been written. Eng. to begin on 3/1/75. Accountability: A. Peterson/J. T. Tannos
Recover VC1 & VAc contained in seal water
Complete
Eliminate VCM packing leaks from Nash compressor.
Complete
Install exhaust fan on compressor room to minimize personnel exp.
Comple te
Recover VCM emissions from the Pilot Plant
Operating procedures revised to send VCM emissions to the #2 Rec. System.
UCC 09t9