Document Yrr4J7OeVM5OVpq6d9agnyQ3O

*k FRAZER FAINT COMFANY 2475 Hubbard Avenue Detroit, Michigan SCHEDULE I TRADE NAAS: CATEGOHY: COLOR! NUMBER: cuAimr: 10C Pure House Paint Exterior Trim & Trellis French Green 15 First Pigment : 513> #4464 Chrome Green #G271 Chrome Green Barytes Clay Litharge Stearic Acid Lbs. 378 55 474 937 15 7 Vehicled Raw Linseed Oil Heavy Bocied Linseed Cil Drier Turpentine Spar Varnish : 1425 38 U3 38 182 Yield in Gal Ions Unit Cost Total Cost 7.e ight per gallon finished product. laboratory record 12.2 lbs. .255 .26 ^6.99 24.70 .017 8.06 .01 .085 9.37 1.28 .1675 1.17 Storage & handling cost through loss - \% 140,97 1.41 .13 1S5.25 143 .07 5.43 an. 01 .10 3.80 .10 18.20 Storage & Handling cost through loss - 3~ 222.69 6.19 Calculated Yield Manufacturing Loss Actual Yield 9732 ' 9C3.9 7.6 2RS.3 Cost Analysisi . Material cost ter gallon Direct labor $ost per gall-on Factory overhead pdr gallon Bulk cost per gallon Complete package cost per gallon, including filling charge Factory cost in package per gallon PRICES (a) To a company owned or controlled outlet Cb) To an independent wholesaler (c) By com.any owned or controlled outletto retail customer (d) To an independent retailer (Dealer) (e) To other (industrial) _ (Contractor) 371.26 1.24 .12 .05 1.41 .19 1.60 None None 3*15 2.63 2.68 2.55