Document YrkMzdyDR6KdMknQDKkbGeVEK

FILE NAME: Ameron (AME) DATE: 1972 May 5 DOC#: AME004 DOCUMENT DESCRIPTION: Unpublished Internal R e p o rt-A ir Sampling for Asbestos at Ameron Plant HEALTH SCIENCE b A S' o c iate: T E C H N I C A L AMO A S Y I S O f t V H R V I C J S i O C C U P A T I O N A L HEALTH * RADIATION SAFETY 107)0 f e l s o n Cir c l e , c e r r i t o s , c a u a 0 0 7:0 TELEPHONE) 21SJ OCTmAJOO 37.S#0I AIR SAMPLING FOR ASBESTOS at Amazon .Corrosion Control Division 201 North Berry Brea, California 92621 for Ameren', Incorporated 400 South Atlantic Boulevard Monterey Park, California .91754 on . May 5, 1972 By! D. A, Kandel Certified Indus trial Hygienist (CIH) Approved: J f/t c 4L Li. Howard 3, Spielman/'CIH, CSP HSA Principal June 19, 1972 LiCKMem TOXIC M A fiftU I . *usa TTsriM wftvsr- x*av oebkw *tfBVjrmi.**cafety * A .G M tt*lT *A T V g V I D C S NZSi& t$ 5H V V S 3 ?>*s;KSOr<r*sX. AMER-MEL 00232 INTRODUCTION f Pursuant to verbal authorization from Mr, G. M. nBilln Torres, Corporate Safety Manager, on May 5, 1972 air samples were collected at four work stations in the Bondstrand building. The air was sampled using Millipore type AA filters in conjunc tion with Mine Safety Appliances (MSA) Monitaire pumps. The ' asbestos fibers on each filter were counted at 450 magnification using phase contrast illumination. RESULTS Table I, -below, shows the sample locations, sampling times, -j air flow rates and atmospheric concentrations of asbetos fibers. TABLE I ,ASBESTOS FIBER COUNTS SAMPLE LOCATION Batch mixing compound for fittings - GBZ* TIME (ma.) 60 FLOW' (liters/min) 1,75 *" Batch mixing area near 40 resin miker--General area sample 1,75 Pattern Cutting - OBZ 60 1.94 . Wrapping asbes.tos liner 60 on mandrel - OBZ 2,18 Cutoff saw - OB*Z 25 Operator's' breathing zone 2.08 NO, FIBERS/ cc AIR 51.2 18,9 3,4 3.4 1.9 STANDARDS On June 7, 1972 OSHA published its permanent standard for exposure to asbestos dust (copy attached). Table II, summarizes the permissible exposure standards. , 49 AMER-MEL 00233 TABLE XI PERMISSIBLE EXPOS(TRE TO AIRBORNE CONCENTRATION OF ASBESTOS FIBERS . Effective Date July 7, 1972 July 7, 1972 July 1, 1976 Exooiure Condition 8 hr. time-weighted average Ceiling concentration 8 hr. time-weighted average No'. ibss;/cc Air 5.0 10.0 . 2,0 REMARKS The determinations of airborne concentrations of asbestos 'fibers were made in accordance with the requirements of Section 1910,93 a (e) of the new OSHA standard, The sampling- periods were such that the samples are representative of the 8 hour rime-weighted average. The batch mixing process produced dense clouds of parti culates during several operations of the mixing cycle of both the large and small batches, There was no local exhaust ventilation and the 'air movement was such'that outdoor air flawed through the mixing area into other areas of the building. It appeared that -this contamination caused general asbestos concentrations in the entire work area adjacent to the mixing area. The liner layout, cutoff, and pattern cutting operations did not appear to produce the type of asbestos contamination that would account for the levels chat were measured. Therefore, it is assumed that the fiber counts at these operations represented general contamination caused by the .batch mixing, process and did iot necessarily represent exposures specifically due to asbestos handling in these- operations, RECOMMENPATIONS 1,' Relocate the batch mixing process to an isolated area or-isolate the present work area from the rest of the work areas, .2. Provide local exhaust ventilation and dust collection for the mixing process . 3. Provide approved respiratory protective devices until ventilation and collection systems are installed, and limit batch -2- , 50 XL AMER-MEL 00234 RECQMMSHT3ATI.0 NS; ( C o n tin u e d ) mixing to periods whet! other employees are not present' {such as another shift, Saturday, etc,)* 4. Provide mixing area, medical examinations forworkers in the hatch 5, Institute periodic environmental monitoring o f `all operations where airborne concentrations o asbestos may reach the breathing zone of employees, The periodicity should be not less than every six months. * -3- ` Si AMER-MEL 0023