Document YrboaB8x2BvLk1MnaxdpLww8D
STO175766
SAMPLING PLANS FOR 1907
ALL JOBS IN TOE CELL SERVICE BLOCK WILL BE SAMPLED AT LEAST ONE TIME DURING THE YEAR FOR ASBESTOS EXPOSURE. JOBS THAT HAVE THE HIGHEST POTENTIAL EXPOSURE WILL BE SAMPLED SEMI ANNUALLY. THESE JOBS INCLUDE:
MIXING PULP HOOKING UP CATHODES AND DUMPING ASBESTOS CLEANING COPPER CATHODES DRAWING CATHODES OPERATING CATHODE WASHER AND RECOVERY SYSTEM CLEANING ANODES JANITORIAL OPERATIONS
JOBS INVOLVING WORK IN HIGH NOISE AREAS WILL BE MONITORED US I PERSONNEL AUDIO DOSIMETERS.