Document YrJYyXg42a6NRkvbvZB0pYJrV

V*. 10 -CCtJO*}'1 Monsanto (NAMf A LOCATION) J. J. McClellan - Texas City, LP&S, 0-22 (Ext. 3325) OAff November 1, 1984 R. T. Hammann sutler ttHttNCf Brushing or Grinding of Gaskets Containing Asbestos TO : R. L. Hammond 0-12 W. D. Walker 0-4 Following a request that the Safety Department check on the possible hazard of grinding or brushing gasket material containing asbestos, an LPR was called with Frank Bales - Material Handling, W. M. Recknor - Plant Engineering, and R. H. Moore - Industrial Hygiene. I represented the Safety Department. Both Frank and Bill said they could think of no reason we would need to brush gasket material from flanges. Scrapers should be used. As to the grinding, Frank checked with Harlan Bessire and found out that he had ground down some tank car dome gaskets that were slightly too large. Frank says this is not needed. Based on this information, we propose to issue the attached LPR. Please let me know if you have additional comments or requests. Thanks. /dgb attachment J. J. McClellan SC 009364 LAM010576 LOSS PREVENTION AND SAFETY LOSS PREVENTION REVIEW PROJECT: HAZARDS INVOLVED IN REMOVING OLD GASKETS CONTAINING ASBESTOS* 1 2 3 Frank Bales A. M. Berry G. W. Bostick D. N. Campbell Jackie Gaul R. T. Hammann R. L. Hammond R. H. Moore W. M. Recknor M. A. Riddle AB-1 SS-17 0-8 2R-9 AB-1 0-22 0-12 2R-8 SS-12 0-22 LP&S Rep.: J. J. McClellan PROJECT DESCRIPTION: This review was held to investigate the hazards that may be encountered in removing gaskets containing asbestos. There have been reports that: (1) Sometimes the flange surfaces are cleaned of stuck gasket material with wire brushes, and (2) gaskets have been cut down to a smaller size by grinding. PROJECT CONTACT: J. J. McClellan MAIL CODE: 0-22 EXT.: 3325 LPR ACTION SCOPE LP REVIEW PROCESS DES. LPR MECH-ELECTR. LPR PRE-STARTUP LPR SITE INSPECTION COMMENTS: REQ'D. X Waived Waived Waived Waived DATE 10723/64 LP&S REPR. JJM------------------ Prior investigations by Industrial Hygiene indicate that: 1. Gaskets containing asbestos are not a hazard to personnel through normal handling. 2. Pieces of gasket left on a flange should be removed by scraping never by brushing. 3. It is not known for certain if grinding or brushing represents a major hazard to personnel or not - good sampling and testing of this action with gasket material is difficult and has not been done. Since both the grinding of gaskets or the brushing of gasket material from flanges will scatter particles in the atmosphere, to be safe thfs practice should be discontinued. If for some unforeseen reason either practice should become necessary, then the craftsmen should be suited out the same as insulators when they handle asbestos. SC 009365 LAM010577 LPR: Hazards Involved in Removing Old Gaskets Containing Asbestos Page 2. 4. This information should be covered in safety meetings to all personnel (Material Handling, Boilermakers, Pipefitters, etc.) that handle asbestos gaskets. LPR PROCEDURE COMPLETE: LP&S, By SC 009366 LAM010578 October 31, 1984 MONTHLY REPORT - OCTOBER - LOSS PREVENTION Loss Prevention Reviews 1. Dept. 513 - Preliminary LPR for Cryogenic Ammonia Tank Inspection 2. Dept. 15 - Handling Shell catalyst in Super Sacks 3. Stores - Sample Handling Facilities for Stores/Receiving Area 4. Maint. - Vacuum Hood for Insulator Shop 5. Matl. Handling - Temporary Facilities for Personnel at Dock 4 during Cryogenic Ammonia Barge Unloading to Pipeline 6. Dept. 44 - Reformer Work during Methanol Shutdown 7. Dept. 19 - Dismantling Old Dept. 19 8. Dept. 27 - Change of Inhibitor (Acetic Acid) Specifications for Acetalde hyde 9. Misc. - Hazard Involved in Removing Old Gaskets Containing Asbestos 10. Matl. Handling - Proposed Change in the Loading of Vacuum Trucks with 25% Caustic from Dept. 25 to the Styrene Truck Loading Rack 11. Dept. 15 - 15S2 Cleaning 12. Dept. 13/14 - Anhy. HC1 hose Counterbalance Apparatus 13. Dept. 513 - Use of Temporary Tank to Help Empty Large Cryogenic Tank 14. Matl. Handling - Sample Cabinets Other 1. Annual S&PP Survey - Kurt Frank 2. Safety Meeting - Shutdown Planning - Methanol/Acetic Technology Group 3. Formic Acid Recovery Project Layout Review 4. TLPR - Field Audit Styrene/EB 5. Fire Protection - Acetic Acid - Review /dgb SC 009367 J. J. McClellan LAM010579 LAW1010575 / 009363 j jMcCl e l l a n , . . M CG REG O R, T X -LO C U S T G R O V E . O * sc I> 2, - o ) O