Document YrD3REpVMen2wEObpzLrGVLrK

' COMPANY CONFIDENTIAL f Monsanto Anniston Plant TECHNICAL SERVICES DEPARTMENT MONTHLY REPORT Anniston J. T. Bell* J. L. Corder* A. G. Hill , G. L. Jessee* , L. C. Lehman* J. C. Landwehr* H. E. Schulte W. F. Taffee *PR&D Mid-month Report Attached General Offices H* C7 career------D. Danna* (5) M. W. Farrar* P. B. Hodges F. J. Holsapfel D. B. Hosmer* R. E. Howard* W. K. Johnson* C. F. Luecke* w. R. Richard* w. R. Robirds* c. W. Roos J. R. Savage* J. E. Smith J. A. Stephens* Other Locations P. O. DeGarmo* So. 2nd A. H. Forsten Alvin, Texas G. A. Hippe* - w G.K. W. L. Small - Texas City R. C. Morris* - Everett R. L. Wiese* - J -H. L. Williams* Nitro iJ. F. Winkler* - Delaware River Summory AUGUST 1971 Specialty Products Evaluation of potential capacity bottlenecks to cumene injection on both Polyphenyl Tubular Units is in progress. A work schedule will be issued in September. Primary concern is the hydrogen compression capacity. A third compressor is needed and will be evaluated in relation to HB-40 and WCM needs. PRD will complete the tasting of higher hydrogen pressure versus WCM in November '71. Batch time is now 2 to 3 times that of HB-40. A PR&D report entitled "Polyphenyl Pilot Studies" has been pre pared and will be issued the week of 9-7-71. This report sunmuurizes all polyphenyl promoter studies. Report No. 3 of the PRD Aroclor Pollution Study was issued 8-20-71. This is the final report on this prqject and covers a flocculationclarification process for removing trace quantities of Aroclor from a solids-containing waste water. AFE 3819 to add three store feed points to the Biphenyl still was approved (NFC $5,000). Project package will be transmitted the first week in September with installation by October 1. Electrical and instrument construction on Project 3780, Improve Hydrogen Utilisation in HB-40, is scheduled to begin 9-7-71. All major B/X items have been received with the exception of the hydrogen meters for the autoclaves. Electrical work on the Standby Propane Fuel System is 95% complete. All major equipment including the 60,000 gallon LPG storage tank has been set. The storage tank arrived in the plant 9-1-71 and was set 9-3-71. The structural steel work for the compressor and blender buildings has been erected and the siding should arrive on or about September 13. Agricultural Division PR&D work on the recycle of organic still residue from Methyl Inter mediate into the next thio acid charge as outlined in the work plan of 7-26-71 is progressing on schedule. A series of recycles using extended chlorination and distillation times and 5 an distillation pressure at a chlorination levelf 102-104% is underway. One .. hundred percent of the organic As being recycled. DSW 014994 STLCOPCB4003370 2. The automatic steam controller on #1 Parathion intermediate still functioned with out fault through the Methyl run. Improvement associated with the final optimiza tion steam profile was 300 pounds per batch, a 5% increase. Designs are being prepared for improved models on the remaining intermediate stills. Discrepancies in nitrogen sparging were discovered and corrected, and three chlorinators increased to 5,000 cubic feet. An average 230 pounds per batch increase was achieved, worth $19,000 per year. Strong correlations were revealed between higher sulfur content of P_S5 and improved chlorinator performance. This will be further studied to define optimum sulfur levels. Pollution Control The plant effluent stream was switched to the No. 1 limestone pit in early August. Aroclor losses for August are well below the l#/day goal. The final report on the reactor-clarifier study for PCB removal was issued during August. /dp DSW 014995 STLCOPCB4003371 PLANT LABORATORIES ANALYTICAL AND QUALITY CONTROL - S. O. Kemp Complaint Report Quality None YTD Quality Complaints/100 Shipments 0.21 Target 0.20 3. DSM 014996 STLCOPCB4003372 COMMUNITY RELATIONS, PERSONNEL, RECRUITING AND DEVELOPMENT 4. Personnel K. G. Hale and D. W. Dudley were given temporary assignments in the South Plant and North Plant Production Areas, respectively, to assist with downtime and quality problems. Visitors F. J. Holzapfel visited the plant 8-31 and 9-1 for a review of pollution control problems and plans as they relate to long range sewer improvement and air pollution abatement programs. DSW 014997 STLCOPCB4003373 1971 DISTRIBUTION OF TIME BY TECHNICAL SERVICE EXISTING PRODUCT 70 TECHNOLOGY IMPROVEMENT NEW PRODUCT EVALUATIONS 60 MAJOR PROJECT SUPPORT 50 PROCESS CONTROL IMPROVEMENT 40 PROJECT DESIGN PROCESS MAINTENANCE TECHNOLOGY AND TECHNICAL SUPPORT TECHNICAL MANPOWER PLANT IMPROVEMENT. PROGRAM REAL ESTATE MANAGEMENT 10 0 c A01 Cu um X >4 fit ><T1J c i-H a0 <X O3' a0) < CO 4J 0 o DSW 014998 STLCOPCB4003374